{
 "$schemaNote": "Informal schema. Every value carries source, sourceUrl and asOf (the date the source states) or readOn (the date we read a source that carries no date). Third-party per-sq-ft figures are reported as their publishers print them; nothing in this file is a Vidastu rate, a Vidastu quote or a price offer.",
 "schemaVersion": "1.0",
 "title": "Construction cost inputs, plot by plot: YEIDA residential plots, Greater Noida and Noida",
 "publisher": "Vidastu Developers Pvt. Ltd.",
 "publisherUrl": "https://www.vidastu.com/",
 "documentation": "https://www.vidastu.com/api/#construction-dataset",
 "companionPages": [
  "https://www.vidastu.com/construction/cost-guide-yamuna-expressway-2026/",
  "https://www.vidastu.com/construction/quote-checker/",
  "https://www.vidastu.com/construction/yeida-60-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-90-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-120-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-162-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-183-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-184-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-200-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-223-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-250-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-260-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-290-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-300-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-500-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-1000-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-2000-sqm-plot-construction/#cost",
  "https://www.vidastu.com/construction/yeida-4000-sqm-plot-construction/#cost"
 ],
 "mirror": "https://www.vidastu.com/api/v2/construction.json",
 "updatedAt": "2026-11-11",
 "license": "Free to reuse for research, citation, and AI-assistant answers. Please cite \"www.vidastu.com\" (Vidastu Developers Pvt. Ltd.) when reusing this data, and cite each third-party figure to its own publisher, URL and date as given here. Not a quote, not a Vidastu rate, not an offer; see disclaimers[].",
 "attribution": "Data by Vidastu Developers Pvt. Ltd., vidastu.com",
 "notAVidastuRate": "Vidastu does not quote a generic per-sq-ft rate, because a plot changes it. A fixed price comes only as one itemised quote after a free site walk. No figure in this file is a Vidastu rate, and none claims that any builder, Vidastu included, is cheaper or dearer than another.",
 "method": {
  "builtUpArea": "G+1 = two full floors at the plot's permissible ground coverage, capped by the plot's FAR area. G+2 = three full floors at the same coverage, capped by the FAR area; where the cap binds, the second floor is the FAR area left after two full floors. Coverage and FAR are Table 1 figures exactly as each plot-size page prints them.",
  "conversion": "1 sqm = 10.7639 sq ft; sq ft rounded half up to the whole number, as the plot-size pages print them.",
  "indicativeTotal": "Each publisher's per-sq-ft range multiplied by the printed built-up sq ft, divided by 1,00,000 and rounded half up to the nearest lakh. Indicative only: built-up area is FAR area, and a stilt floor, a basement or balconies up to 1.5 m wide are outside FAR but still built.",
  "source": "Vidastu arithmetic on the figures in regulations and plotSizes",
  "sourceUrl": "https://www.vidastu.com/construction/how-much-can-i-build-on-a-yeida-plot/",
  "asOf": "2026-11-11"
 },
 "regulations": {
  "table1": {
   "description": "Regulation 24.1, Table 1: residential plot bands with maximum ground coverage (ground, first and second floor), maximum FAR and maximum height. Setbacks also follow the sector zonal plan.",
   "source": "YEIDA Building Regulations 2010, Notification No. 311/77-3-09-8X/09 dated 20 December 2010, as transcribed on vidastu.com",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-building-regulations/",
   "readOn": "2026-10-06",
   "bands": [
    {
     "upToSqm": 50,
     "band": "Up to 50",
     "maxCoveragePct": 75,
     "maxFar": 1.8,
     "maxHeightM": 15
    },
    {
     "upToSqm": 75,
     "band": "Above 50 to 75",
     "maxCoveragePct": 75,
     "maxFar": 1.8,
     "maxHeightM": 15
    },
    {
     "upToSqm": 120,
     "band": "Above 75 to 120",
     "maxCoveragePct": 75,
     "maxFar": 1.8,
     "maxHeightM": 15
    },
    {
     "upToSqm": 200,
     "band": "Above 120 to 200",
     "maxCoveragePct": 75,
     "maxFar": 1.8,
     "maxHeightM": 15
    },
    {
     "upToSqm": 300,
     "band": "Above 200 to 300",
     "maxCoveragePct": 75,
     "maxFar": 1.8,
     "maxHeightM": 15
    },
    {
     "upToSqm": 400,
     "band": "Above 300 to 400",
     "maxCoveragePct": 65,
     "maxFar": 1.8,
     "maxHeightM": 15
    },
    {
     "upToSqm": 500,
     "band": "Above 400 to 500",
     "maxCoveragePct": 65,
     "maxFar": 1.8,
     "maxHeightM": 15
    },
    {
     "upToSqm": 750,
     "band": "Above 500 to 750",
     "maxCoveragePct": 60,
     "maxFar": 1.5,
     "maxHeightM": 15
    },
    {
     "upToSqm": 1000,
     "band": "Above 750 to 1000",
     "maxCoveragePct": 55,
     "maxFar": 1.5,
     "maxHeightM": 15
    },
    {
     "upToSqm": 1250,
     "band": "Above 1000 to 1250",
     "maxCoveragePct": 55,
     "maxFar": 1.5,
     "maxHeightM": 15
    },
    {
     "upToSqm": 1500,
     "band": "Above 1250 to 1500",
     "maxCoveragePct": 50,
     "maxFar": 1.5,
     "maxHeightM": 15
    },
    {
     "upToSqm": 1750,
     "band": "Above 1500 to 1750",
     "maxCoveragePct": 50,
     "maxFar": 1.5,
     "maxHeightM": 15
    },
    {
     "upToSqm": 2000,
     "band": "Above 1750 to 2000",
     "maxCoveragePct": 45,
     "maxFar": 1.5,
     "maxHeightM": 15
    },
    {
     "upToSqm": 2500,
     "band": "Above 2000 to 2500",
     "maxCoveragePct": 45,
     "maxFar": 1.0,
     "maxHeightM": 15
    },
    {
     "upToSqm": 3500,
     "band": "Above 2500 to 3500",
     "maxCoveragePct": 45,
     "maxFar": 1.0,
     "maxHeightM": 15
    },
    {
     "upToSqm": 4000,
     "band": "Above 3500 to 4000",
     "maxCoveragePct": 40,
     "maxFar": 1.0,
     "maxHeightM": 15
    }
   ]
  },
  "certificateMinimum": {
   "rule": "At least 40 sqm, or 50 per cent of the maximum permissible ground coverage, whichever is more, with a functional toilet or bath and a kitchen.",
   "regulation": "Regulation 24.1(2)(x)",
   "source": "YEIDA Building Regulations 2010, Notification No. 311/77-3-09-8X/09 dated 20 December 2010, as transcribed on vidastu.com",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-building-regulations/",
   "readOn": "2026-10-06"
  },
  "occupancyCertificateList": {
   "rule": "Flooring and electrical wiring (fittings not mandatory); plumbing and fittings in at least one toilet and the kitchen; trees and a number plate; a boundary wall; internal and external finishing; a lockable house with all external doors and windows fitted; no violation of the Regulations, the Zonal Plan or the Master Plan.",
   "regulation": "Regulations 20.1.1 and 20.1.2",
   "source": "YEIDA Building Regulations 2010, Notification No. 311/77-3-09-8X/09 dated 20 December 2010, as transcribed on vidastu.com",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-building-regulations/",
   "readOn": "2026-10-06"
  },
  "bpmsOnlineSince": {
   "value": "2024-08-01",
   "rule": "YEIDA processes every building-plan sanction and completion application only online, on the BPMS portal, since 1 August 2024.",
   "source": "YEIDA BPMS portal notice, FAQ and Allottee User Manual 1.0, as read on vidastu.com's BPMS guide",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-building-plan-approval/",
   "portalUrl": "https://bpms.yamunaexpresswayauthority.com/",
   "readOn": "2026-11-02"
  },
  "deemedSanction": {
   "days": 60,
   "noticeDays": 20,
   "rule": "No decision within 60 days of application is a deemed sanction, but only if the applicant notifies the CEO in writing within the next 20 days.",
   "regulation": "Regulation 13(2)",
   "source": "YEIDA Building Regulations 2010, Notification No. 311/77-3-09-8X/09 dated 20 December 2010, as transcribed on vidastu.com",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-building-regulations/",
   "readOn": "2026-10-06"
  },
  "certificateDecision": {
   "days": 90,
   "objectionsRejectAfterMonths": 6,
   "rule": "The CEO has 90 days to issue the occupancy certificate or communicate inability; objections left unresolved for 6 months reject the application.",
   "regulation": "Regulations 20.1.1 and 20.1.2",
   "source": "YEIDA Building Regulations 2010, Notification No. 311/77-3-09-8X/09 dated 20 December 2010, as transcribed on vidastu.com",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-building-regulations/",
   "readOn": "2026-10-06"
  },
  "sanctionValidity": {
   "years": 5,
   "rule": "A sanctioned plan is valid for 5 years; revalidation within validity costs 10 per cent of a fresh permit fee, after expiry the full fee.",
   "regulation": "Regulations 10(5) and 15",
   "source": "YEIDA Building Regulations 2010, Notification No. 311/77-3-09-8X/09 dated 20 December 2010, as transcribed on vidastu.com",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-building-regulations/",
   "readOn": "2026-10-06"
  },
  "constructionDeadline": {
   "value": "2026-12-31",
   "rule": "For residential allottees with an executed lease deed, the no-charge construction window runs to 31 December 2026; the completion certificate, not the filing, is what meets it.",
   "decision": "YEIDA 87th board meeting, 7 November 2025",
   "source": "Times of India, 8 November 2025",
   "sourceUrl": "https://timesofindia.indiatimes.com/city/noida/yeida-gives-1-year-relief-to-plot-allottees-launches-new-settlement-policy/articleshow/125173408.cms",
   "asOf": "2025-11-08",
   "explainer": "https://www.vidastu.com/construction/yeida-deadline-2026/"
  }
 },
 "plotSizes": [
  {
   "plotSqm": 60,
   "band": "Above 50 and up to 75 sqm",
   "coveragePct": 75,
   "footprintSqm": 45.0,
   "footprintSqft": 484,
   "far": 1.8,
   "totalBuildableSqm": 108.0,
   "totalBuildableSqft": 1163,
   "certificateMinimumSqm": 40.0,
   "certificateMinimumSqft": 431,
   "certificateMinimumNote": "the 40 sqm floor binds",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "1.5 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-60-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 90.0,
    "g1BuiltUpSqft": 969,
    "g2BuiltUpSqm": 108.0,
    "g2BuiltUpSqft": 1163,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 18.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       16,
       23
      ],
      "g2": [
       19,
       28
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       14,
       29
      ],
      "g2": [
       16,
       35
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       18,
       44
      ],
      "g2": [
       22,
       52
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       13,
       19
      ],
      "g2": [
       15,
       23
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-60-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 90,
   "band": "Above 75 and up to 120 sqm",
   "coveragePct": 75,
   "footprintSqm": 67.5,
   "footprintSqft": 727,
   "far": 1.8,
   "totalBuildableSqm": 162.0,
   "totalBuildableSqft": 1744,
   "certificateMinimumSqm": 40.0,
   "certificateMinimumSqft": 431,
   "certificateMinimumNote": "the 40 sqm floor binds",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "2.0 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-90-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 135.0,
    "g1BuiltUpSqft": 1453,
    "g2BuiltUpSqm": 162.0,
    "g2BuiltUpSqft": 1744,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 27.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       24,
       35
      ],
      "g2": [
       29,
       42
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       20,
       44
      ],
      "g2": [
       24,
       52
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       28,
       65
      ],
      "g2": [
       33,
       78
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       19,
       29
      ],
      "g2": [
       23,
       35
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-90-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 120,
   "band": "Above 75 and up to 120 sqm",
   "coveragePct": 75,
   "footprintSqm": 90.0,
   "footprintSqft": 969,
   "far": 1.8,
   "totalBuildableSqm": 216.0,
   "totalBuildableSqft": 2325,
   "certificateMinimumSqm": 45.0,
   "certificateMinimumSqft": 484,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "2.0 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-120-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 180.0,
    "g1BuiltUpSqft": 1938,
    "g2BuiltUpSqm": 216.0,
    "g2BuiltUpSqft": 2325,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 36.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       32,
       47
      ],
      "g2": [
       38,
       56
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       27,
       58
      ],
      "g2": [
       33,
       70
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       37,
       87
      ],
      "g2": [
       44,
       105
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       25,
       39
      ],
      "g2": [
       30,
       47
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-120-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 162,
   "band": "Above 120 and up to 200 sqm",
   "coveragePct": 75,
   "footprintSqm": 121.5,
   "footprintSqft": 1308,
   "far": 1.8,
   "totalBuildableSqm": 291.6,
   "totalBuildableSqft": 3139,
   "certificateMinimumSqm": 60.75,
   "certificateMinimumSqft": 654,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "3.0 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-162-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 243.0,
    "g1BuiltUpSqft": 2616,
    "g2BuiltUpSqm": 291.6,
    "g2BuiltUpSqft": 3139,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 48.60000000000002,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       43,
       63
      ],
      "g2": [
       52,
       75
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       37,
       78
      ],
      "g2": [
       44,
       94
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       50,
       118
      ],
      "g2": [
       60,
       141
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       34,
       52
      ],
      "g2": [
       41,
       63
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-162-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 183,
   "band": "Above 120 and up to 200 sqm",
   "coveragePct": 75,
   "footprintSqm": 137.25,
   "footprintSqft": 1477,
   "far": 1.8,
   "totalBuildableSqm": 329.4,
   "totalBuildableSqft": 3546,
   "certificateMinimumSqm": 68.63,
   "certificateMinimumSqft": 739,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "3.0 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-183-sqm-plot-construction/",
   "asOf": "2026-11-11",
   "derived": {
    "g1BuiltUpSqm": 274.5,
    "g1BuiltUpSqft": 2955,
    "g2BuiltUpSqm": 329.4,
    "g2BuiltUpSqft": 3546,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 54.9,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       49,
       71
      ],
      "g2": [
       59,
       85
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       41,
       89
      ],
      "g2": [
       50,
       106
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       56,
       133
      ],
      "g2": [
       67,
       160
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       38,
       59
      ],
      "g2": [
       46,
       71
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-183-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 184,
   "band": "Above 120 and up to 200 sqm",
   "coveragePct": 75,
   "footprintSqm": 138.0,
   "footprintSqft": 1485,
   "far": 1.8,
   "totalBuildableSqm": 331.2,
   "totalBuildableSqft": 3565,
   "certificateMinimumSqm": 69.0,
   "certificateMinimumSqft": 743,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "3.0 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-184-sqm-plot-construction/",
   "asOf": "2026-11-11",
   "derived": {
    "g1BuiltUpSqm": 276.0,
    "g1BuiltUpSqft": 2971,
    "g2BuiltUpSqm": 331.2,
    "g2BuiltUpSqft": 3565,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 55.2,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       49,
       71
      ],
      "g2": [
       59,
       86
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       42,
       89
      ],
      "g2": [
       50,
       107
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       56,
       134
      ],
      "g2": [
       68,
       160
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       39,
       59
      ],
      "g2": [
       46,
       71
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-184-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 200,
   "band": "Above 120 and up to 200 sqm",
   "coveragePct": 75,
   "footprintSqm": 150.0,
   "footprintSqft": 1615,
   "far": 1.8,
   "totalBuildableSqm": 360.0,
   "totalBuildableSqft": 3875,
   "certificateMinimumSqm": 75.0,
   "certificateMinimumSqft": 807,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "3.0 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-200-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 300.0,
    "g1BuiltUpSqft": 3229,
    "g2BuiltUpSqm": 360.0,
    "g2BuiltUpSqft": 3875,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 60.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       53,
       77
      ],
      "g2": [
       64,
       93
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       45,
       97
      ],
      "g2": [
       54,
       116
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       61,
       145
      ],
      "g2": [
       74,
       174
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       42,
       65
      ],
      "g2": [
       50,
       78
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-200-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 223,
   "band": "Above 200 and up to 300 sqm",
   "coveragePct": 75,
   "footprintSqm": 167.25,
   "footprintSqft": 1800,
   "far": 1.8,
   "totalBuildableSqm": 401.4,
   "totalBuildableSqft": 4321,
   "certificateMinimumSqm": 83.63,
   "certificateMinimumSqft": 900,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "3.25 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-223-sqm-plot-construction/",
   "asOf": "2026-11-11",
   "derived": {
    "g1BuiltUpSqm": 334.5,
    "g1BuiltUpSqft": 3601,
    "g2BuiltUpSqm": 401.4,
    "g2BuiltUpSqft": 4321,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 66.9,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       59,
       86
      ],
      "g2": [
       71,
       104
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       50,
       108
      ],
      "g2": [
       60,
       130
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       68,
       162
      ],
      "g2": [
       82,
       194
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       47,
       72
      ],
      "g2": [
       56,
       86
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-223-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 250,
   "band": "Above 200 and up to 300 sqm",
   "coveragePct": 75,
   "footprintSqm": 187.5,
   "footprintSqft": 2018,
   "far": 1.8,
   "totalBuildableSqm": 450.0,
   "totalBuildableSqft": 4844,
   "certificateMinimumSqm": 93.75,
   "certificateMinimumSqft": 1009,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "3.25 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-250-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 375.0,
    "g1BuiltUpSqft": 4036,
    "g2BuiltUpSqm": 450.0,
    "g2BuiltUpSqft": 4844,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 75.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       67,
       97
      ],
      "g2": [
       80,
       116
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       57,
       121
      ],
      "g2": [
       68,
       145
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       77,
       182
      ],
      "g2": [
       92,
       218
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       52,
       81
      ],
      "g2": [
       63,
       97
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-250-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 260,
   "band": "Above 200 and up to 300 sqm",
   "coveragePct": 75,
   "footprintSqm": 195.0,
   "footprintSqft": 2099,
   "far": 1.8,
   "totalBuildableSqm": 468.0,
   "totalBuildableSqft": 5038,
   "certificateMinimumSqm": 97.5,
   "certificateMinimumSqft": 1049,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "3.25 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-260-sqm-plot-construction/",
   "asOf": "2026-11-11",
   "derived": {
    "g1BuiltUpSqm": 390.0,
    "g1BuiltUpSqft": 4198,
    "g2BuiltUpSqm": 468.0,
    "g2BuiltUpSqft": 5038,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 78.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       69,
       101
      ],
      "g2": [
       83,
       121
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       59,
       126
      ],
      "g2": [
       71,
       151
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       80,
       189
      ],
      "g2": [
       96,
       227
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       55,
       84
      ],
      "g2": [
       65,
       101
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-260-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 290,
   "band": "Above 200 and up to 300 sqm",
   "coveragePct": 75,
   "footprintSqm": 217.5,
   "footprintSqft": 2341,
   "far": 1.8,
   "totalBuildableSqm": 522.0,
   "totalBuildableSqft": 5619,
   "certificateMinimumSqm": 108.75,
   "certificateMinimumSqft": 1171,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "3.25 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-290-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 435.0,
    "g1BuiltUpSqft": 4682,
    "g2BuiltUpSqm": 522.0,
    "g2BuiltUpSqft": 5619,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 87.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       77,
       112
      ],
      "g2": [
       93,
       135
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       66,
       140
      ],
      "g2": [
       79,
       169
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       89,
       211
      ],
      "g2": [
       107,
       253
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       61,
       94
      ],
      "g2": [
       73,
       112
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-290-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 300,
   "band": "Above 200 and up to 300 sqm",
   "coveragePct": 75,
   "footprintSqm": 225.0,
   "footprintSqft": 2422,
   "far": 1.8,
   "totalBuildableSqm": 540.0,
   "totalBuildableSqft": 5813,
   "certificateMinimumSqm": 112.5,
   "certificateMinimumSqft": 1211,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "3.25 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-300-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 450.0,
    "g1BuiltUpSqft": 4844,
    "g2BuiltUpSqm": 540.0,
    "g2BuiltUpSqft": 5813,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 90.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       80,
       116
      ],
      "g2": [
       96,
       140
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       68,
       145
      ],
      "g2": [
       81,
       174
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       92,
       218
      ],
      "g2": [
       110,
       262
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       63,
       97
      ],
      "g2": [
       76,
       116
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-300-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 500,
   "band": "Above 400 and up to 500 sqm",
   "coveragePct": 65,
   "footprintSqm": 325.0,
   "footprintSqft": 3498,
   "far": 1.8,
   "totalBuildableSqm": 900.0,
   "totalBuildableSqft": 9688,
   "certificateMinimumSqm": 162.5,
   "certificateMinimumSqft": 1749,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "4.5 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-500-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 650.0,
    "g1BuiltUpSqft": 6997,
    "g2BuiltUpSqm": 900.0,
    "g2BuiltUpSqft": 9688,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 250.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       115,
       168
      ],
      "g2": [
       160,
       233
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       98,
       210
      ],
      "g2": [
       136,
       291
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       133,
       315
      ],
      "g2": [
       184,
       436
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       91,
       140
      ],
      "g2": [
       126,
       194
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-500-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 1000,
   "band": "Above 750 and up to 1,000 sqm",
   "coveragePct": 55,
   "footprintSqm": 550.0,
   "footprintSqft": 5920,
   "far": 1.5,
   "totalBuildableSqm": 1500.0,
   "totalBuildableSqft": 16146,
   "certificateMinimumSqm": 275.0,
   "certificateMinimumSqft": 2960,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "6.0 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-1000-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 1100.0,
    "g1BuiltUpSqft": 11840,
    "g2BuiltUpSqm": 1500.0,
    "g2BuiltUpSqft": 16146,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 400.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       195,
       284
      ],
      "g2": [
       266,
       388
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       166,
       355
      ],
      "g2": [
       226,
       484
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       225,
       533
      ],
      "g2": [
       307,
       727
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       154,
       237
      ],
      "g2": [
       210,
       323
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-1000-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 2000,
   "band": "Above 1,750 and up to 2,000 sqm",
   "coveragePct": 45,
   "footprintSqm": 900.0,
   "footprintSqft": 9688,
   "far": 1.5,
   "totalBuildableSqm": 3000.0,
   "totalBuildableSqft": 32292,
   "certificateMinimumSqm": 450.0,
   "certificateMinimumSqft": 4844,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "12.5 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-2000-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 1800.0,
    "g1BuiltUpSqft": 19375,
    "g2BuiltUpSqm": 2700.0,
    "g2BuiltUpSqft": 29063,
    "g2CappedByFar": false,
    "g2SecondFloorSqm": 900.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       320,
       465
      ],
      "g2": [
       480,
       698
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       271,
       581
      ],
      "g2": [
       407,
       872
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       368,
       872
      ],
      "g2": [
       552,
       1308
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       252,
       388
      ],
      "g2": [
       378,
       581
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-2000-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  },
  {
   "plotSqm": 4000,
   "band": "Above 3,500 and up to 4,000 sqm",
   "coveragePct": 40,
   "footprintSqm": 1600.0,
   "footprintSqft": 17222,
   "far": 1.0,
   "totalBuildableSqm": 4000.0,
   "totalBuildableSqft": 43056,
   "certificateMinimumSqm": 800.0,
   "certificateMinimumSqft": 8611,
   "certificateMinimumNote": "50 per cent of permissible coverage",
   "maxHeight": "15 m, counted from the top of the drain to the top of the building",
   "frontSetback": "20 m",
   "source": "Vidastu plot-size page, from Regulation 24.1 and Table 1 of the YEIDA Building Regulations 2010 (read 6 October 2026)",
   "sourceUrl": "https://www.vidastu.com/construction/yeida-4000-sqm-plot-construction/",
   "asOf": "2026-11-04",
   "derived": {
    "g1BuiltUpSqm": 3200.0,
    "g1BuiltUpSqft": 34444,
    "g2BuiltUpSqm": 4000.0,
    "g2BuiltUpSqft": 43056,
    "g2CappedByFar": true,
    "g2SecondFloorSqm": 800.0,
    "indicativeTotalsLakh": {
     "aarna": {
      "ratePerSqft": [
       1650,
       2400
      ],
      "g1": [
       568,
       827
      ],
      "g2": [
       710,
       1033
      ],
      "rateSource": "Aarna Constructions & Interiors",
      "rateSourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
      "rateAsOf": "2026-11-07",
      "rateReadOn": "2026-11-11"
     },
     "bajaj": {
      "ratePerSqft": [
       1400,
       3000
      ],
      "g1": [
       482,
       1033
      ],
      "g2": [
       603,
       1292
      ],
      "rateSource": "Bajaj Finance",
      "rateSourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
      "rateAsOf": null,
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt": {
      "ratePerSqft": [
       1900,
       4500
      ],
      "g1": [
       654,
       1550
      ],
      "g2": [
       818,
       1938
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     },
     "bricknbolt_grey": {
      "ratePerSqft": [
       1300,
       2000
      ],
      "g1": [
       448,
       689
      ],
      "g2": [
       560,
       861
      ],
      "rateSource": "BrickNBolt",
      "rateSourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
      "rateAsOf": "2026-06-09",
      "rateReadOn": "2026-11-11"
     }
    },
    "source": "Vidastu arithmetic, see method",
    "sourceUrl": "https://www.vidastu.com/construction/yeida-4000-sqm-plot-construction/#cost",
    "asOf": "2026-11-11"
   }
  }
 ],
 "publishedRates": [
  {
   "publisher": "Aarna Constructions & Interiors",
   "title": "Construction Cost Per Sq Ft in Greater Noida 2026",
   "sourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
   "area": "Greater Noida",
   "datePublished": "2026-03-22",
   "asOf": "2026-11-07",
   "asOfBasis": "dateModified in the page's own structured data",
   "readOn": "2026-11-11",
   "basis": "per sq ft of built-up area, with material (turnkey)",
   "tiers": [
    {
     "tier": "Basic",
     "ratePerSqft": 1650,
     "approximate": true,
     "note": "RCC structure, standard fittings, vitrified tiles, basic paint"
    },
    {
     "tier": "Standard",
     "ratePerSqft": 1850,
     "approximate": true,
     "note": "better flooring, modular kitchen provision, branded fittings"
    },
    {
     "tier": "Premium",
     "ratePerSqftLow": 2100,
     "ratePerSqftHigh": 2400,
     "openEndedHigh": true
    },
    {
     "tier": "Luxury villas",
     "ratePerSqftLow": 2400,
     "ratePerSqftHigh": 2800,
     "openEndedHigh": true
    }
   ],
   "headline": "Rs 1,650 to 2,400 per sq ft, basic to premium",
   "includes": [
    "structure: foundation, RCC frame, slabs, brick or block walls, plastering",
    "plumbing: CPVC supply, drainage, basic fittings",
    "electrical: concealed wiring, switches, MCB, earthing",
    "flooring",
    "doors and windows",
    "painting",
    "kitchen platform and tiles (modular kitchen extra or in higher packages)",
    "bathroom tiles, basic fittings, waterproofing"
   ],
   "excludes": [
    "land or plot cost",
    "government fees (map approval, development charges)",
    "compound wall and gate",
    "landscaping and driveway",
    "interior decoration",
    "overhead water tank, boring or borewell",
    "solar panels, CCTV, home automation",
    "architect fees (sometimes included in design-build packages)"
   ],
   "gst": "GST extra",
   "assumption": "The page's rate card assumes a 200 to 300 sqm plot, a G+2 villa with stilt parking and standard finishes per tier, and says costs scale roughly linearly with built-up area."
  },
  {
   "publisher": "Bajaj Finance",
   "title": "House Construction Cost in Noida",
   "sourceUrl": "https://www.bajajfinserv.in/house-construction-cost-in-noida",
   "area": "Noida",
   "asOf": null,
   "noDateOnPage": true,
   "readOn": "2026-11-11",
   "basis": "per sq ft of built-up area (BUA)",
   "tiers": [
    {
     "tier": "Economy",
     "ratePerSqftLow": 1400,
     "ratePerSqftHigh": 1600
    },
    {
     "tier": "Standard",
     "ratePerSqftLow": 1800,
     "ratePerSqftHigh": 2200
    },
    {
     "tier": "Premium",
     "ratePerSqftLow": 2500,
     "ratePerSqftHigh": 3000
    }
   ],
   "headline": "Rs 1,400 to 3,000 per sq ft, economy to premium",
   "includes": [
    "construction only"
   ],
   "excludes": [
    "Noida Authority approval fees",
    "architect fees",
    "soil testing"
   ],
   "note": "The page's summary and FAQ give premium as Rs 2,500 to 3,000; its quality-wise table gives Good Rs 2,200 to 2,600 and Premium Rs 2,600 to 3,000. Its 3 BHK example adds Rs 5 to 8 lakh for approvals, architect, soil testing, boundary and contingency on top of the per-sq-ft cost."
  },
  {
   "publisher": "BrickNBolt",
   "title": "Home Construction Cost in Noida in 2026",
   "sourceUrl": "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights",
   "area": "Noida",
   "datePublished": "2026-06-08",
   "asOf": "2026-06-09",
   "asOfBasis": "dateModified in the page's own structured data",
   "readOn": "2026-11-11",
   "basis": "per sq ft; the page's cost-by-size tables are by built-up area",
   "tiers": [
    {
     "tier": "Basic",
     "ratePerSqftLow": 1900,
     "ratePerSqftHigh": 2400
    },
    {
     "tier": "Standard",
     "ratePerSqftLow": 2500,
     "ratePerSqftHigh": 3200
    },
    {
     "tier": "Premium",
     "ratePerSqftLow": 3200,
     "ratePerSqftHigh": 4500
    },
    {
     "tier": "Grey structure",
     "ratePerSqftLow": 1300,
     "ratePerSqftHigh": 2000,
     "scope": "foundation, basic plastering, RCC frame and roof slabs, staircase structure, brickwork, underground water tank and basic piping"
    },
    {
     "tier": "Turnkey",
     "ratePerSqftLow": 2500,
     "ratePerSqftHigh": 4500,
     "scope": "structure, electrical and plumbing, flooring and tiling, paint, modular kitchen, doors and windows, bathroom fittings"
    }
   ],
   "headline": "Rs 1,900 to 4,500 per sq ft overall",
   "excludes": [
    "architectural design and approval fees",
    "waterproofing",
    "soil testing",
    "material transportation",
    "boundary wall construction",
    "staircase railing and facade detailing"
   ]
  }
 ],
 "materialPrices": [
  {
   "item": "TMT bar",
   "market": "New Delhi",
   "prices": [
    {
     "size": "8 mm",
     "rupeesPerKg": 58
    },
    {
     "size": "10 mm",
     "rupeesPerKg": 56
    },
    {
     "size": "12 mm",
     "rupeesPerKg": 55
    },
    {
     "size": "16 mm",
     "rupeesPerKg": 55
    },
    {
     "size": "20 mm",
     "rupeesPerKg": 55
    },
    {
     "size": "25 mm",
     "rupeesPerKg": 55
    }
   ],
   "priceType": "approximate price list",
   "note": "The page says price depends on brand, size, market movement and delivery location. GST treatment not stated.",
   "source": "easeInfra",
   "sourceUrl": "https://www.easeinfra.com/products/tmt-bar/new-delhi",
   "asOf": "2026-11-11",
   "asOfBasis": "Last Updated: 11 November 2026, printed on the page; dateModified 2026-11-11"
  },
  {
   "item": "PPC cement",
   "market": "Greater Noida",
   "rupeesPerBagLow": 305,
   "rupeesPerBagHigh": 325,
   "note": "As Aarna Constructions states it in its structure cost line; branded OPC costs more; GST extra.",
   "source": "Aarna Constructions & Interiors",
   "sourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
   "asOf": "2026-11-07"
  },
  {
   "item": "Fe500 TMT steel",
   "market": "Greater Noida",
   "rupeesPerKgLow": 56,
   "rupeesPerKgHigh": 65,
   "note": "As Aarna Constructions states it in its structure cost line; GST extra.",
   "source": "Aarna Constructions & Interiors",
   "sourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
   "asOf": "2026-11-07"
  }
 ],
 "adders": [
  {
   "adder": "Pile foundation on weak soil",
   "ratePerSqftLow": 150,
   "ratePerSqftHigh": 250,
   "appliesTo": "built-up area (the page lists it among the things that push cost above its Rs 1,650 basic rate per sq ft of built-up area)",
   "condition": "soil bearing capacity below 8 t/m2; the page says this is common in pockets of Jewar and parts of YEIDA",
   "source": "Aarna Constructions & Interiors",
   "sourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
   "asOf": "2026-11-07"
  },
  {
   "adder": "Basement",
   "ratePerSqftLow": 350,
   "ratePerSqftHigh": 550,
   "appliesTo": "basement area",
   "condition": "includes waterproofing, ventilation and a dewatering pump",
   "source": "Aarna Constructions & Interiors",
   "sourceUrl": "https://aarnaconstructions.com/construction-cost-per-sq-ft-greater-noida/",
   "asOf": "2026-11-07"
  },
  {
   "adder": "Soil testing",
   "condition": "outside the per-sq-ft range",
   "source": "Bajaj Finance; BrickNBolt",
   "sourceUrl": [
    "https://www.bajajfinserv.in/house-construction-cost-in-noida",
    "https://www.bricknbolt.com/blogs-and-articles/construction-guide/home-construction-cost-in-noida-2026-latest-price-per-sq-ft-insights"
   ],
   "asOf": "2026-06-09",
   "readOn": "2026-11-11",
   "asOfNote": "BrickNBolt dated 9 June 2026; Bajaj Finance page undated, read 11 November 2026"
  }
 ],
 "quoteLineItems": [
  {
   "item": "structure",
   "label": "Structure: foundation, RCC frame, slabs",
   "whyItMatters": "The engineered part, set by the structural drawing. Aarna Constructions puts structure at 40 to 45 per cent of total cost (7 November 2026).",
   "aarna": {
    "status": "in",
    "text": "In the rate"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not itemised: construction only"
   },
   "bricknbolt": {
    "status": "in",
    "text": "In the rate, grey and turnkey"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "masonry",
   "label": "Masonry: brick or block walls",
   "whyItMatters": "Brick or AAC block, and the wall thickness, should be named on the quote.",
   "aarna": {
    "status": "in",
    "text": "In the rate"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not itemised"
   },
   "bricknbolt": {
    "status": "in",
    "text": "In the rate, grey and turnkey"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "plaster",
   "label": "Plaster, inside and outside",
   "whyItMatters": "Internal and external plaster, with the number of coats, should be a line of its own.",
   "aarna": {
    "status": "in",
    "text": "In the rate"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not itemised"
   },
   "bricknbolt": {
    "status": "in",
    "text": "In the rate, grey and turnkey"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "flooring",
   "label": "Flooring",
   "whyItMatters": "Aarna says the flooring choice alone can swing cost by Rs 100 to 200 per sq ft (7 November 2026); name the tile or stone and its allowance.",
   "aarna": {
    "status": "in",
    "text": "In the rate: vitrified tile at basic"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not itemised"
   },
   "bricknbolt": {
    "status": "pt",
    "text": "Turnkey only"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "doors_windows",
   "label": "Doors and windows",
   "whyItMatters": "Door type (flush or engineered) and window make and section (aluminium or UPVC) belong in writing.",
   "aarna": {
    "status": "in",
    "text": "In the rate"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not itemised"
   },
   "bricknbolt": {
    "status": "pt",
    "text": "Turnkey only"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "electrical",
   "label": "Electrical: wiring, switches, MCB, earthing",
   "whyItMatters": "Wire and switch brands, the number of points and the earthing should be listed.",
   "aarna": {
    "status": "in",
    "text": "In the rate"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not itemised"
   },
   "bricknbolt": {
    "status": "pt",
    "text": "Turnkey only"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "plumbing",
   "label": "Plumbing and sanitary",
   "whyItMatters": "Pipe type, fitting brands and the number of bathrooms; Aarna's basic tier assumes two bathrooms (7 November 2026).",
   "aarna": {
    "status": "in",
    "text": "In the rate"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not itemised"
   },
   "bricknbolt": {
    "status": "pt",
    "text": "Turnkey only; grey has basic provision"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "kitchen",
   "label": "Kitchen",
   "whyItMatters": "A platform with tiles is not a modular kitchen; the quote should say which.",
   "aarna": {
    "status": "pt",
    "text": "Platform and tiles; modular extra"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not itemised"
   },
   "bricknbolt": {
    "status": "pt",
    "text": "Turnkey: modular kitchen setup"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "waterproofing",
   "label": "Waterproofing: roof and wet areas",
   "whyItMatters": "Roof and bathroom waterproofing protect the slab and the floor below.",
   "aarna": {
    "status": "pt",
    "text": "Bathrooms in; roof not stated"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not itemised"
   },
   "bricknbolt": {
    "status": "ex",
    "text": "Excluded"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "boundary_wall",
   "label": "Boundary wall and gate",
   "whyItMatters": "The occupancy certificate needs a boundary wall (Regulations 20.1.1 and 20.1.2), so a quote without it leaves a certificate item unpriced.",
   "aarna": {
    "status": "ex",
    "text": "Excluded: compound wall and gate"
   },
   "bajaj": {
    "status": "ex",
    "text": "Outside the rate: its own 3 BHK example adds it"
   },
   "bricknbolt": {
    "status": "ex",
    "text": "Excluded"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "water_tank",
   "label": "Water tanks and boring",
   "whyItMatters": "Underground sump, overhead tank and any boring are separate lines.",
   "aarna": {
    "status": "ex",
    "text": "Excluded: overhead tank and boring"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not stated"
   },
   "bricknbolt": {
    "status": "pt",
    "text": "Underground tank in grey scope; overhead not stated"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "sewer",
   "label": "Septic tank or sewer connection",
   "whyItMatters": "Whether the plot connects to a sewer line or needs a septic tank decides this line; none of the three ranges states it.",
   "aarna": {
    "status": "ns",
    "text": "Not stated: internal drainage only"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not stated"
   },
   "bricknbolt": {
    "status": "ns",
    "text": "Not stated"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "soil_test",
   "label": "Soil test",
   "whyItMatters": "The soil report decides the foundation, and Aarna Constructions prices a pile foundation as an adder on top of its range.",
   "aarna": {
    "status": "ns",
    "text": "Not stated: pile foundation is an adder"
   },
   "bajaj": {
    "status": "ex",
    "text": "Additional"
   },
   "bricknbolt": {
    "status": "ex",
    "text": "Excluded"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "bpms_architect",
   "label": "BPMS sanction and architect",
   "whyItMatters": "Only a Council of Architecture registered, YEIDA-empanelled architect can file on BPMS; the fees and the architect's charge are separate lines.",
   "aarna": {
    "status": "ex",
    "text": "Excluded: government fees; architect fees usually separate"
   },
   "bajaj": {
    "status": "ex",
    "text": "Additional: approval and architect fees"
   },
   "bricknbolt": {
    "status": "ex",
    "text": "Excluded: design and approval fees"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "completion_certificate",
   "label": "Completion certificate",
   "whyItMatters": "Only the certificate meets the 31 December 2026 deadline for executed lease deeds; its filing and the occupancy list's items (trees, number plate, boundary wall) belong in scope.",
   "aarna": {
    "status": "ns",
    "text": "Not stated: government fees excluded"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not stated"
   },
   "bricknbolt": {
    "status": "ns",
    "text": "Not stated"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  },
  {
   "item": "gst",
   "label": "GST",
   "whyItMatters": "Whether the total is before or after GST changes it by the tax; the quote should show GST as its own line.",
   "aarna": {
    "status": "ex",
    "text": "Extra"
   },
   "bajaj": {
    "status": "ns",
    "text": "Not stated"
   },
   "bricknbolt": {
    "status": "ns",
    "text": "Not stated"
   },
   "statusLegend": "in = in the published rate; pt = partly; ex = excluded or additional; ns = not stated",
   "source": "Each publisher's page as listed in publishedRates",
   "readOn": "2026-11-11"
  }
 ],
 "timeline": {
  "value": "A straightforward G+1 takes typically 5 to 8 months from start on site to handover, depending on plot size, floors and finish level; the calendar from signing is longer (BPMS sanction, GRAP construction bans, monsoon).",
  "minMonths": 5,
  "maxMonths": 8,
  "scope": "G+1, site months",
  "source": "Vidastu build timeline guide",
  "sourceUrl": "https://www.vidastu.com/construction/how-long-to-build-a-house/",
  "asOf": "2026-09-30"
 },
 "paymentTerms": {
  "advance": "Market convention is a modest mobilisation advance, commonly cited at around 10 to 25 per cent; requests for more than roughly 30 to 40 per cent upfront are widely treated as a red flag.",
  "conventionLowPct": 10,
  "conventionHighPct": 25,
  "redFlagAbovePct": 30,
  "redFlagUpperPct": 40,
  "stages": [
   "agreement",
   "foundation and plinth",
   "RCC structure",
   "brickwork and plaster",
   "finishing",
   "handover"
  ],
  "stagesNote": "Market-convention sequence, with a small retention commonly held until the snag list clears; compiled from published construction-agreement and contractor-hiring guides (2024 to 2026). Market context, not a statement of Vidastu's terms.",
  "source": "Vidastu contractor-vetting guide",
  "sourceUrl": "https://www.vidastu.com/construction/how-to-hire-a-contractor/",
  "asOf": "2026-06",
  "asOfNote": "The page says Updated June 2026."
 },
 "excludedSources": [
  {
   "publisher": "InfraLens",
   "urls": [
    "https://infralens.in/prices/noida",
    "https://infralens.in/prices/cement"
   ],
   "reason": "The pages refused automated reading (HTTP 403) on 11 November 2026, so none of their figures could be read on the page; none is used.",
   "readOn": "2026-11-11"
  }
 ],
 "omitted": [
  {
   "item": "Material consumption per sq ft of built-up area (cement bags, steel kg)",
   "reason": "Only blog thumb rules exist, and they disagree with each other; no published source was read on its page for this file. The structural drawing and bar bending schedule set the real quantities, so none is printed.",
   "readOn": "2026-11-11"
  }
 ],
 "disclaimers": [
  "Indicative arithmetic, not a quote, not a valuation and not an offer.",
  "The three per-sq-ft ranges are published for Greater Noida (Aarna Constructions) and Noida (Bajaj Finance, BrickNBolt); none is specific to YEIDA sectors.",
  "Built-up area here is FAR area. A stilt floor (FAR-free on plots of 112 sqm and above), a basement and balconies up to 1.5 m wide sit outside FAR but are still built, and a contractor may bill them.",
  "Your allotment letter, lease deed, YEIDA-issued site plan, sector zonal plan and the BPMS sanction govern your own plot."
 ]
}
