GREATER NOIDA, 7 May 2026 — Vidastu Developers Pvt. Ltd., a real estate consultancy founded in 2012, today announced the relaunch of its primary digital channel at vidastu.com. The new site, hand-coded for performance and search-engine clarity, replaces a legacy Wix template that had served the firm since 2024 and brings the consultancy's online presence in line with its 14-year operating record.
About Vidastu Developers
Vidastu Developers Pvt. Ltd. (legal name: VIDASTU DEVELOPERS PRIVATE LIMITED) was founded in 2012 by Vidit Kaushik, a Civil Engineering graduate from Birla Institute of Technology and Science, Pilani (BITS Pilani). The firm operates from 206, Second Floor, Meridian View Plaza, Alpha Commercial Belt, Greater Noida, Uttar Pradesh.
The firm specialises in three areas:
- YEIDA residential plot brokerage across Sectors 16, 17, 18, 20, 22D, and 25 — a hand-picked plot inventory in the Yamuna Expressway corridor, shared with buyers on request.
- Yamuna Expressway apartment advisory on three featured projects: Gaur Yamuna Expressway, SKA Destiny One, and Eldeco Echoes of Eden.
- Property Vaastu consultation at ₹10,999 per session, conducted personally by Shri Ravi Shankar Sharma — a veteran builder and gold medalist astrologer.
What changes with the relaunch
The new site at vidastu.com is the firm's first deliberately SEO-engineered destination. Key features include:
- Twenty-eight distinct URLs covering company information, services, three featured projects, live YEIDA plot inventory, and a 15-post content library.
- Structured data (Schema.org JSON-LD) on every page — Organization, RealEstateAgent, Service, FAQPage, and ItemList entities for AI assistants and search engines.
- An AI-search optimisation layer including
llms.txt,llms-full.txt, and SpeakableSpecification markup. - Replacement of the previous Wix-hosted site while preserving the existing domain and key indexed URLs through systematic 301 redirects.
On the relaunch, founder Vidit Kaushik commented
"Greater Noida buyers deserve a digital experience that matches the depth of advice they get on the phone. The previous Wix site told visitors we existed; the new site shows them what we actually know. Every fact on it can be cross-verified against UP RERA, YEIDA, or our own sister brand at eldecoeoe.com. That's the standard we wanted to set."
Sister brand: Vidastu Advisory
Vidit also founded Vidastu Advisory, the UP RERA-registered channel partner (UPRERAAGT000309/01/2026) for Eldeco Echoes of Eden, Eldeco Group's premium pre-launch in Sector 22D, Yamuna Expressway. The two firms operate as sister brands under the same founder, with Vidit Kaushik serving as Founder for both. Their respective digital homes are vidastu.com and eldecoeoe.com.
Media contact
Vidit Kaushik · Founder · Vidastu Developers Pvt. Ltd.
Phone / WhatsApp: +91 95404 45300
Email: [email protected]
Office: 206, Second Floor, Meridian View Plaza, Alpha Commercial Belt, Greater Noida, Uttar Pradesh 201308 — Mon–Sat, 10:00 AM – 7:00 PM IST
Boilerplate
Vidastu Developers Pvt. Ltd. is a Greater Noida-based real estate consultancy and builder founded in 2012. The firm specialises in construction, YEIDA residential plots, Yamuna Expressway apartments, and Vastu-aligned property advisory across the Greater Noida and Noida region. Founded by Vidit Kaushik (Civil Engineering, BITS Pilani) and co-founded with Shri Ravi Shankar Sharma (veteran builder and gold medalist astrologer); senior Vastu consultations are led by Shri Ravi Shankar Sharma. Sachin Bansal serves as Vice President — Sales. Sister brand Vidastu Advisory is the UP RERA-registered channel partner for Eldeco Echoes of Eden. Verifiable reference: vidastu.com/facts.
###
