The visit
What’s included in ₹11,000.
- 1-hour on-site visitBy Shri Ravi Shankar Sharma at your property anywhere in Delhi NCR
- Plot orientation auditDirectional alignment, slope, surrounding influences
- Entrance assessmentMain door direction, threshold positioning, blockages
- Kitchen VastuStove placement, water source, storage, fire-water adjacency check
- Bedroom VastuSleeping direction, mirror placement, master-bedroom location
- Prayer/Pooja roomDirection, deity placement, lighting, cleanliness check
- Water-body auditWater tanks, borewells, swimming pools, water-feature placement
- Vaastu-dosh diagnosisIdentification of any structural Vastu defects with severity rating
- Practical remediation planCorrections that don’t require demolition
- Same-day written reportDelivered via WhatsApp or email
What you don’t pay for
No travel cost on top of ₹11,000 within Delhi NCR. No upselling to “premium remediation packages.” No repeat-visit pressure. The diagnosis and remediation plan are complete in the single visit. If a follow-up is genuinely warranted (e.g. post-renovation re-audit), we discuss it transparently, no automatic billing.
The consultant
Who conducts the consultation.
Shri Ravi Shankar Sharma is a veteran builder and senior Vastu consultant who leads our Vastu practice. Every paid Property Vaastu visit is conducted personally by him; there are no junior consultants, no franchise arrangements, and no third-party referrals. The Vastu service has been running, with paying clients, since before Vidastu Developers was incorporated in 2023.
One more thing worth knowing: homes Vidastu builds don’t need this audit. Every Vidastu Build home is Vaastu-aligned by design; Shri Ravi Shankar Sharma resolves orientation, entrance and room placement on the drawing board before construction begins.
How it works
Booking process.
| Step | What happens | Time |
|---|---|---|
| 1. Initial enquiry | WhatsApp with property address and preferred date | 2 min |
| 2. Slot confirmation | We confirm Shri Ravi Sharma’s availability and lock the slot | Same day |
| 3. Payment | UPI / IMPS / NEFT: ₹11,000 to Vidastu Developers | 5 min |
| 4. Visit | Shri Ravi Sharma arrives on time, conducts 1-hour audit | Booked time |
| 5. Report | Written remediation plan delivered same day via WhatsApp/email | Same evening |
Cancellation & reschedule policy.
To cancel or reschedule, please call at least 24 hours in advance on +91 98114 05300. Same-day cancellations are subject to a 50% retention charge to compensate the consultant’s blocked slot. Rescheduling within 24 hours is free; we’ll find another mutually-convenient time.
Frequently asked
Questions before you book.
Is the ₹11,000 price all-inclusive?
Can I book before I buy a property?
What if Shri Ravi Sharma is not available on my preferred date?
Do you do Vastu for commercial properties?
What if you find major Vastu issues that require structural changes?
Do you sell remedial items (yantras, pyramids, crystals)?
Book a Property Vaastu visit
WhatsApp the address. Get a slot.
Vidit replies with available dates and the payment link. The whole booking takes 5 minutes; a same-day written remediation plan follows the visit.
Call · +91 98114 05300Same-day written report on every visit.
Got it, we’re on it.
We confirm your slot the same day. Opening WhatsApp so we can start now.