Now advising · Sector 12, Greater Noida West

Eldeco La Vida Bella, Sector 12, Greater Noida West

An independent review, with the price route, the plans, the payment plan and the register record on this page.

Sold by
Vidastu Advisory, authorised channel partner for EldecoUP-RERA agent UPRERAAGT000309/01/2026, not the developer; basic price, Eldeco's cost sheet governs
UP-RERA registration
UPRERAPRJ136219/04/2024UP-RERA registration is not approval or endorsement; basic price, Eldeco's cost sheet governs
Price
in writing, from the deskon a dated cost sheet, super area; basic price, Eldeco's cost sheet governs
Homes
3 BHK 1,905 sq ft · 4 BHK 2,755 and 3,300 sq ftsuper area; basic price, Eldeco's cost sheet governs
RERA declared completion date
16 January 2029the date on the registration, not a possession commitment; basic price, Eldeco's cost sheet governs

Every figure here resolves to a dated, itemised cost sheet you can request. Floor plan PDFs come on WhatsApp.

Ask the desk

The dated cost sheet and the floor plans come from a person, not a download. Send two lines and you get them in writing.

Ask on WhatsApp Call +91 98114 05300

Eldeco La Vida Bella is a RERA-registered (UPRERAPRJ136219/04/2024, registered 26 April 2024) residential project by Eldeco Real Estate Limited (Eldeco Group) at Plot GH-02C, Sector 12, Greater Noida West. Five towers, all G+22 per the brochure master plan, Bellissimo 1 to 3 and Magnifico 1 and 2, on 14,998 sq. mtr (~3.71 acres), a corner plot fronting the 130-metre Noida to Greater Noida link road. Eight documented unit types, 1,425 to 3,300 sq ft super area. Desk-stated rate in writing, on a dated cost sheet. Declared completion on the register: 16 January 2029.

In writingDesk rate, on a dated cost sheet
5 × G+22Towers (brochure)
8Unit types
~3.71 acCorner plot
Jan 2029Declared completion

4.8 across 58 Google reviews as on 6 October 2026 · UP-RERA agent UPRERAAGT000309/01/2026 · CIN U68200UP2023PTC192378

Eldeco La Vida Bella price

No price figure is published on this page. The desk states its rate on super area and gives it to you in writing, on a dated, itemised cost sheet: tower, unit, super area, base rate and every charge head. Basic price; Eldeco’s cost sheet governs.

The rateIn writing, on the desk’s dated cost sheet, on super area
Charged on topGST, PLC, IFMS, parking, stamp duty and registration; power backup is mandatory at additional cost
Not in the priceFans, geysers, light fixtures and appliances are not provided
Last restatedThe desk’s working rate was restated for August 2026, per the desk log of 25 August 2026

Hold every portal number against the written cost sheet before you sign; the desk sends it on WhatsApp within office hours.

Weighing it against 7 Peaks, Eldeco's project in Sector Omicron 1A, Greater Noida: Eldeco 7 Peaks vs La Vida Bella, price, sizes and plan side by side.

Eldeco La Vida Bella floor plans and sizes

Eight unit types in the developer’s brochure, from 1,425 to 3,300 sq ft super area: two 2 BHK, four 3 BHK and two 4 BHK formats across five G+22 towers.

TypeConfigurationSuper area (sq ft)Towers
Type 013 BHK + 3T1,905Bellissimo 1 to 3
Type 022 BHK + 2T1,555Bellissimo 1 to 3
Type 032 BHK + 2T1,425Bellissimo 1 to 3
Type 044 BHK + 4T2,755Magnifico 1 and 2
Type 054 BHK + 4T + Servant3,300Magnifico 1 and 2
Type 063 BHK + 3T2,250Magnifico 1 and 2
Type 073 BHK + 3T2,340Magnifico 1 and 2
Type 083 BHK + 3T + Servant2,880Magnifico 1 and 2

Super areas as printed in the developer’s brochure. The carpet areas it prints: 3 BHK 1,104 to 1,667 sq ft, 4 BHK 1,597 to 1,912 sq ft, Type 02 902 sq ft and Type 03 826 sq ft. Official marketing positions the 3 and 4 BHK line as the premium offer, so ask the desk in writing for the current tower-wise unit mix.

All five towers are G+22 per the brochure master plan, which settles the older portal claims of G+25 to G+28; the rooftop pool is on the Magnifico towers only, per the developer’s brochure.

Eldeco La Vida Bella payment plan

No payment plan for La Vida Bella is stated on this site. The plan comes on the dated cost sheet, with the share and the due point of each instalment for your unit.

Two rules hold whatever the plan. By law, under the Section 13 rule, the promoter cannot collect more than 10% of the price before a registered agreement for sale is executed. And every payment goes only to ELDECO REAL ESTATE LIMITED, never to an individual.

Eldeco La Vida Bella possession date and RERA number

RERA number UPRERAPRJ136219/04/2024. RERA declared completion date 16 January 2029, against a 60-month project duration that started in February 2024. That register date, not any marketing estimate, is the number to hold the project to; it is not a possession commitment.

UP-RERA registrationUPRERAPRJ136219/04/2024
Registered on26 April 2024, project type New
Promoter of recordEldeco Real Estate Limited (Eldeco Group), CIN U45400DL2007PLC163848
Address as filedPlot GH-02C, Sector 12, Greater Noida West, tehsil Dadri, district Gautam Buddha Nagar
RERA declared completion date16 January 2029, the date on the registration, not a possession commitment
Project duration on the register60 months, from February 2024
Layout approvalGNIDA, no. SM-22-AUG-2023:19040 dated 17.01.2024 (brochure-stated)

Register entry as read from the register mirror on 29 July 2026. Registration is registration, not approval or endorsement. At least one portal credits a different Eldeco entity; your agreement and cheques should name the promoter on the registry, no other.

Verify it yourself on up-rera.in.

1. Open up-rera.in, go to the registered projects search and enter UPRERAPRJ136219/04/2024.

2. Match the promoter, Eldeco Real Estate Limited, and the declared completion date against the lines above before any paperwork.

Eldeco La Vida Bella location

Plot GH-02C, Sector 12, Greater Noida West, tehsil Dadri, district Gautam Buddha Nagar, Uttar Pradesh: the address from the RERA registry.

The developer’s brochure adds that it is a corner plot fronting the 130-metre Noida to Greater Noida link road and the FNG Expressway, with a 24-metre internal road, on 14,998 sq. mtr (about 3.71 acres). These are developer-stated figures.

This site states no drive times or distances for La Vida Bella, so none are given here. Ask the desk on WhatsApp, and time the drive yourself at your usual hour.

Eldeco La Vida Bella amenities and specifications

The brochure’s master plan lists a 27-item amenity legend.

Clubhouse and pools

A clubhouse with a rooftop swimming pool, kids’ pool and jacuzzi; the rooftop pool is on the Magnifico towers only, per the brochure.

Sport and leisure

Gymnasium, squash, billiards, pickleball, party hall, aerobics, indoor and outdoor table tennis, yoga and meditation zones, a cricket pitch, badminton, a multipurpose court, an amphitheatre, kids’ play areas, a pet park, a reflexology path, a party lawn, an outdoor kitchen, a chess court and a waterbody.

Security

Multi-tier security.

In the homes

RCC structure with aluminium formwork; premium stone or marble flooring in the living areas and kitchen; laminated wooden flooring in bedrooms; a granite or composite kitchen counter with a double-bowl sink; an 8-ft hardwood main door with a digital lock; UPVC or powder-coated aluminium windows; an all-weather air conditioner included.

Not provided

Power backup is mandatory at additional cost; fans, geysers, light fixtures and appliances are not provided. Price these into your budget at the start, not at fit-out.

Amenity lists on an under-construction project are developer-stated intent; ask which items sit in the sanctioned layout.

Eldeco La Vida Bella brochure

The brochure and the full 8-type floor-plan set come to your WhatsApp from the desk within office hours. A site visit at Sector 12, Greater Noida West is free, with no obligation.

The project’s dedicated site: eldecoflats.com

Eldeco La Vida Bella: questions buyers ask

What is the Eldeco La Vida Bella price?
No price figure is published on this page. The desk states its rate on super area and gives it to you in writing, on a dated cost sheet: tower, unit, super area and every charge head. Basic price; Eldeco's cost sheet governs. Ask for the sheet before you compare any portal number.
Is there an Eldeco La Vida Bella price list?
The desk's rate comes on a dated, itemised cost sheet for your unit rather than a published list. GST, PLC, IFMS, parking, stamp duty and registration are additional, and power backup is mandatory at additional cost.
What are the Eldeco La Vida Bella floor plans and sizes?
The developer's brochure documents 8 unit types across five G+22 towers: 2 BHK at 1,425 and 1,555 sq ft super area, 3 BHK from 1,905 to 2,880 sq ft super area (1,104 to 1,667 sq ft carpet), and 4 BHK at 2,755 and 3,300 sq ft super area (1,597 to 1,912 sq ft carpet). Bellissimo 1 to 3 host Types 01 to 03, and Magnifico 1 and 2 carry Types 04 to 08.
What is the Eldeco La Vida Bella payment plan?
No payment plan for La Vida Bella is stated on this site; the plan comes on the dated cost sheet for your unit. Whatever the plan, the promoter cannot collect more than 10% of the price before a registered agreement for sale, and every payment goes only to ELDECO REAL ESTATE LIMITED.
What is the Eldeco La Vida Bella possession date?
The RERA declared completion date is 16 January 2029, against a 60-month project duration that started in February 2024. It is the date on the registration, not a possession commitment; verify it live at up-rera.in before booking.
What is the RERA number of Eldeco La Vida Bella?
UPRERAPRJ136219/04/2024, registered with UP-RERA on 26 April 2024. The promoter of record is ELDECO REAL ESTATE LIMITED, the plot is GH-02C, Sector 12, Greater Noida West, and the declared completion date on the register is 16 January 2029. Verify every field yourself at up-rera.in before any paperwork.
Where exactly is Eldeco La Vida Bella located?
Plot GH-02C, Sector 12, Greater Noida West, tehsil Dadri, district Gautam Buddha Nagar, Uttar Pradesh; that address is from the RERA registry. The developer's brochure adds that it is a corner plot fronting the 130-metre Noida to Greater Noida link road and the FNG Expressway, with a 24-metre internal road; these are developer-stated figures.
Is there an Eldeco La Vida Bella brochure PDF?
Yes. The desk sends the brochure and the 8-type floor-plan set to your WhatsApp on request. Use Request the brochure on this page.
What amenities does Eldeco La Vida Bella include?
The brochure's master plan lists a 27-item amenity legend: a clubhouse with a rooftop swimming pool, kids' pool and jacuzzi, gymnasium, squash, billiards, pickleball, party hall, aerobics, indoor and outdoor table tennis, yoga and meditation zones, a cricket pitch, badminton, a multipurpose court, an amphitheatre, kids' play areas, a pet park, a reflexology path, a party lawn, an outdoor kitchen, a chess court, a waterbody and multi-tier security. Amenity lists on an under-construction project are developer-stated intent, ask which items sit in the sanctioned layout.
What do Eldeco La Vida Bella reviews say?
This page is the desk's own review: the live registration, the January 2029 clock and Eldeco's delivery record carry the case, and the rate prices above older Greater Noida West resale, so what you pay for is the timeline and the fresh build. The desk itself is rated 4.8 across 58 Google reviews as on 6 October 2026, a rating of the desk, not of the project.
When was Eldeco La Vida Bella launched?
Eldeco La Vida Bella was registered with UP-RERA on 26 April 2024 as a new project, and its 60-month project duration on the register started in February 2024.
Does Eldeco La Vida Bella have 2 BHK flats?
Yes, the official brochure documents Type 02 (902 sq ft carpet / 1,555 sq ft super) and Type 03 (826 sq ft carpet / 1,425 sq ft super) as 2BHK+2T units in Bellissimo 1 to 3. Official marketing still positions the 3 and 4 BHK line as the premium offer, so ask the desk in writing for the current tower-wise unit mix before you shortlist.
Which towers host which units in La Vida Bella?
Bellissimo 1, 2 and 3 host Types 01 to 03, the 1,905 sq ft 3 BHK and both 2 BHK formats, while Magnifico 1 and 2 carry the larger Types 04 to 08, from the 2,250 sq ft 3 BHK to the 3,300 sq ft 4 BHK with servant room. All five towers are G+22 per the brochure master plan, which settles the older portal claims of G+25 to G+28.
What are the specifications inside the homes?
Per the brochure: RCC structure with aluminium formwork, premium stone or marble flooring in the living areas and kitchen, laminated wooden flooring in bedrooms, a granite or composite kitchen counter with a double-bowl sink, an 8-ft hardwood main door with a digital lock, UPVC or powder-coated aluminium windows, and an all-weather air conditioner included in the homes. Power backup is mandatory at additional cost, and fans, geysers, light fixtures and appliances are not provided; price these into your budget at the start, not at fit-out.
Is Eldeco La Vida Bella a good buy in 2026?
No honest answer promises returns, so here is the shape of it: at the desk-stated rate, which comes in writing on the dated cost sheet, it prices above older Greater Noida West resale, but it buys a new-build Eldeco with a declared completion of 16 January 2029 on the UP-RERA register, the nearest-term new-launch timeline in this market. If timeline certainty and a fresh build lead your list, it is a strong fit; if the lowest rate per sq ft leads, nearby resale will beat it. Verify the record at up-rera.in and get the exact quote in writing before deciding.
How do I book a flat in Eldeco La Vida Bella?
Contact our sales desk on WhatsApp or phone (+91 98114 05300), because the project carries a live registration (UPRERAPRJ136219/04/2024), the desk runs the booking end-to-end: a unit shortlist, the exact price as a written cost sheet, and the agreement for sale reviewed against the registry record before you sign. By law, the promoter cannot collect more than 10% of the price before that registered agreement is executed, and every payment goes only to ELDECO REAL ESTATE LIMITED, never to an individual.
Who sells Eldeco La Vida Bella?
This desk sells it as an authorised channel partner for Eldeco: a UP-RERA registered agent, UPRERAAGT000309/01/2026, not the developer. Message the desk on WhatsApp at 98114 05300.
Can NRIs buy Eldeco La Vida Bella?
Yes. NRIs and PIOs can purchase residential property in India under FEMA rules through normal banking channels from NRE or NRO accounts, generally without RBI approval. GST, stamp duty and registration charges apply equally, and the same Section 13 rule holds, no more than 10% of the price before a registered agreement for sale. Call the desk for NRI-specific documentation requirements.
What is the relationship between vidastu.com and eldecoflats.com?
Both are operated by Vidit Kaushik. vidastu.com is Vidastu Developers Pvt. Ltd., multi-project consultancy and builder, building here since 2000. eldecoflats.com is the project's dedicated site, run by our sister desk, a UP RERA-registered channel partner (UPRERAAGT000309/01/2026). Same office, same Vidit Kaushik on calls, separate brands.
Eldeco La Vida Bella ka price kya hai?
Hamare desk ka stated rate likhit cost sheet par milta hai, is page par publish nahin hota. 1,555 sq.ft 2 BHK aur 1,905 sq.ft 3 BHK ka basic price desk ki dated cost sheet par, likhit mein milta hai. Likhit cost sheet desk se maangiye, tower, unit, har charge head ke saath, aur kisi bhi portal number ko final maan kar mat chaliye.
Eldeco La Vida Bella kaisa project hai?
Sector 12, Greater Noida West mein Eldeco ka RERA-registered project hai, paanch G+22 towers, 8 unit types, registration UPRERAPRJ136219/04/2024, aur declared completion 16 January 2029, yaani corridor ke 2030 aur 2031 waale naye launches se kaafi pehle. Desk ka stated rate likhit cost sheet par milta hai, is page par publish nahin hota; cost sheet desk se maangiye, aur record up-rera.in par khud verify kijiye.
Are Eldeco 7 Peaks, Eldeco La Vida Bella and Eldeco Echoes of Eden the same project?
No, three separate projects with three separate UP-RERA registrations under three different promoter companies within the Eldeco group. Eldeco 7 Peaks Residences: UPRERAPRJ106523/01/2026, promoter Eldeco Homes Developers Limited, Sector Omicron 1A, Greater Noida, completion on record 14-11-2030. Eldeco La Vida Bella: UPRERAPRJ136219/04/2024, promoter Eldeco Real Estate Limited, Plot GH-02C, Sector 12, Greater Noida West, declared completion 16-01-2029. Eldeco Echoes of Eden: UPRERAPRJ125342/02/2026, promoter Eldeco Sohna Projects Limited, Sector 22D, Yamuna Expressway. Each is verifiable on up-rera.in under its own number. Eldeco registers other projects under these and other promoter entities, check each project's own number on up-rera.in.

Desk log

  1. Desk verification of every figure on this page against the developer's documents; the desk's working rate was restated for August 2026 and is sent, with the unit-wise cost sheet, in writing.
  2. Register mirror read: UPRERAPRJ136219/04/2024, promoter Eldeco Real Estate Limited, declared completion 16 January 2029.

The desk’s read on La Vida Bella

Direct answer

Eldeco La Vida Bella is priced at the rate our sales desk states in writing, and the basic price for the 1,905 sq.ft 3 BHK and the 1,555 sq.ft 2 BHK is on the dated cost sheet from the desk, and Eldeco’s cost sheet governs. The project is UP-RERA registered (UPRERAPRJ136219/04/2024) with a declared completion of 16 January 2029, the nearest-term new-launch timeline on the register in this market, across five G+22 towers on a corner plot fronting the 130-metre Noida to Greater Noida link road in Sector 12, Greater Noida West. Our review in one line: the live registration, the January 2029 clock and Eldeco's delivery record carry the case; the rate prices above older resale nearby, so what you are paying for is the timeline and the fresh build, hold every quote against the desk's written cost sheet before you sign.

Eldeco La Vida Bella is a 2/3/4 BHK residential project by Eldeco Group at Sector 12, Greater Noida West. UP RERA registered (UPRERAPRJ136219/04/2024), promoter of record Eldeco Real Estate Limited. Five G+22 towers, Bellissimo 1 to 3 and Magnifico 1 and 2, on ~3.71 acres, 8 documented unit types from 1,425 to 3,300 sq ft super, an all-weather air conditioner and a digital main-door lock in the specification, and a declared completion of 16 January 2029 on the register. The desk states its rate on super area; the exact price is issued as a written, itemised and dated cost sheet rather than published here. This page carries our desk's review, the register record, the full brochure unit table, the tower guide and the Vastu framing.

In writing
Desk rate, on a dated cost sheet
5 × G+22
Towers / floors
8
Unit types (brochure)
~3.71 ac
Land (14,998 sqm)
Jan 2029
Declared completion
2/3/4
BHK formats
130 m
Link-road frontage
AC
All-weather, included
27
Amenity legend items

Why our desk features La Vida Bella

vidastu.com features a short list of projects, each walked and vetted before it appears here. La Vida Bella is on the list for four reasons:

  1. A live UP RERA registration since April 2024. UPRERAPRJ136219/04/2024, not a pre-launch bet. The registration, the promoter entity and the declared completion date are all public and verifiable on up-rera.in.
  2. The nearest-term clock. Declared completion 16 January 2029, meaningfully earlier than the 2030 and 2031 dates carried by most new launches we track.
  3. Eldeco Group's delivery record. The group's count runs 200+ projects and 30,000+ customers since 1985 (developer-stated). Our desk's read of the record is on the Eldeco builder page.
  4. A specification with substance. RCC aluminium-formwork structure, an all-weather air conditioner included, digital main-door locks, stone or marble living-and-kitchen flooring, all brochure-stated and itemised in the amenities section above.

Vastu on your shortlisted unit (how this desk works)

Our co-founder Shri Ravi Shankar Sharma is a senior Vastu consultant, and unit-level Vastu is part of how this desk closes: shortlist first, then a Vastu read on the specific tower, floor and facing you are considering, not a generic chart. As general doctrine, East- and North-East-facing entries with a South-West master bedroom read best; corner units with two-side openings widen the options. The five-tower layout here means facing varies unit by unit, so treat direction as a per-unit question, not a project-level one.

Important: unit-specific Vastu (your shortlisted tower, floor, direction) requires the actual floor plate in front of the consultant. Book a Property Vaastu pre-purchase audit (₹11,000) before you book the flat, for unit-specific recommendations.

Get the written cost sheet

Tower, unit, super area, base rate, every charge head, dated and itemised, plus the full floor-plan set. The desk sends it on WhatsApp within office hours.

What to check before you book

  1. Search UPRERAPRJ136219/04/2024 at up-rera.in and match the promoter, Eldeco Real Estate Limited; at least one portal credits a different Eldeco entity.
  2. Ask the desk in writing for the current tower-wise unit mix before you shortlist.
  3. Budget for power backup, mandatory at additional cost, and for fans, geysers, light fixtures and appliances, which are not provided.
  4. Pay no more than 10% of the price before a registered agreement for sale, and only to ELDECO REAL ESTATE LIMITED.
Cross-references
→ Eldeco 7 Peaks Residences (Omicron 1A, separate promoter, separate RERA) → Eldeco Echoes of Eden (Sector 22D, Yamuna Expressway) → Eldeco Group, builder track record → Booking through a UP-RERA registered agent → Property Vaastu pre-purchase audit (₹11,000) → About Vidit Kaushik (founder) & Shri Ravi Shankar Sharma (co-founder)

Talk to the desk

Get the written cost sheet, floor plans, or an honest read.

The 8-type floor-plan set, the itemised cost sheet at the current desk rate, or a straight answer on whether the January 2029 clock fits your plan, tell us what you need and Vidit calls back directly. No call-centre, ever.

Call the desk · +91 98114 05300

Sent only to Vidastu Developers, same lead pipeline as eldecoflats.com.

No spam, the desk that does the work calls you back.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Vidastu Developers Pvt. Ltd., Greater Noida real estate consultancy and builder, building here since 2000. Vidit Kaushik: +91 98114 05300. This page is an authorised channel partner’s review, not the official Eldeco site. The developer is Eldeco Real Estate Limited (Eldeco Group; official site eldecogroup.com), and the project's registration is UPRERAPRJ136219/04/2024 (registered 26-04-2024; declared completion 16-01-2029). Sister brand: Vidastu Advisory, UP-RERA Agent UPRERAAGT000309/01/2026, channel partner, which runs the project's dedicated site, eldecoflats.com. "Eldeco" and related marks are the property of their respective owners, used here only for identification. Sources: UP RERA · Eldeco Group · eldecoflats.com. Not investment advice, values can fall. The desk-stated rate is issued in writing on a dated cost sheet, applies to super area and is the basic price; Eldeco’s cost sheet governs, and GST, PLC, IFMS, parking, stamp duty and registration are additional. Brochure figures are developer-stated; the RERA registry and filed documents prevail where they overlap. Verify RERA, carpet area and current pricing on the UP RERA portal before paying anything.