Now advising · Sector 22D, Yamuna Expressway
Review by Vidastu Developers · Updated 15 September 2026
Ledger note, 10 August 2026: Eldeco's official creative announces an Independence Weekend Carnival at the Sector 22D Sales Gallery (15-16 August, 11 AM onwards) with a 2x* booking-amount offer valid till 16 August (capped at ₹2 lakh, T&C per developer). The basic sale price is ₹11,000 per sq ft* super area, plus other charges, as on 8 October 2026, and the unit-wise dated cost sheet comes on WhatsApp, in writing.
Every figure here resolves to a dated, itemised cost sheet you can request. Floor plan PDFs come on WhatsApp.
Eldeco Echoes of Eden (EOE) is a RERA-registered (UPRERAPRJ125342/02/2026) pre-launch premium residential project by Eldeco Sohna Projects Limited at Sector 22D, Yamuna Expressway, Greater Noida. Three 32-storey towers (Haven, Elysian, Caelum) on a 5-acre, 558-unit site with VRV centralised AC, ~15 minutes from Noida International Airport (Jewar). Haven and Elysian are fully booked; current availability is in Caelum tower only. 3/4 BHK from on the dated cost sheet (1,550 sq.ft 3 BHK; 2 BHK is sold out) at the current BSP ₹11,000 per sq ft* super area, plus other charges, as on 8 October 2026. Possession target January 2031 (per RERA filing). Booking is direct, up to 10% of BSP (Sec-13 cap), no separate EOI.
4.8 across 58 Google reviews as on 6 October 2026 · UP-RERA agent UPRERAAGT000309/01/2026 · CIN U68200UP2023PTC192378
Read next: the Yamuna Expressway register, 22 rows with each developer's published figure.
Eldeco Echoes of Eden is priced at ₹11,000/sq.ft* super area, plus other charges, 8 October 2026, and the dated cost sheet for the entry 3 BHK + 2T of 1,550 sq.ft comes on WhatsApp, in writing. Add GST, preferred-location charges, parking, club, IFMS, stamp duty and registration and the realistic all-in comes on the dated sheet from our desk on WhatsApp, in writing. Our review in one line: the RERA registration on file at launch, VRV air-conditioning in every home and a ten-to-fifteen minute drive to the Jewar terminal are what carry the case, and the January 2031 declared completion date is the part you have to be genuinely comfortable with before you sign.
Eldeco Echoes of Eden (EOE) is a premium 3/4 BHK VRV-air-conditioned residential project by Eldeco Group at Sector 22D, Yamuna Expressway, Greater Noida. UP RERA registered (UPRERAPRJ125342/02/2026). Three towers, 32 floors, 558 units, 80% open green space, 75,000 sqft clubhouse, 3-acre central greens. Haven and Elysian are fully booked, so current availability is in Caelum tower only, and the 2 BHK is sold out. 3 BHK on the dated cost sheet (current BSP ₹11,000 per sq ft* super area, plus other charges, as on 8 October 2026; all-in cost on the dated sheet from our desk on WhatsApp, in writing); 30:40:30 construction-linked payment plan; booking is direct (up to 10% of BSP, no separate EOI). Channel partner: Vidastu Advisory (UPRERAAGT000309/01/2026, our sister brand). This page carries Vidastu Developers’ review including Vastu analysis (unique angle), structural notes, and buyer-advisory framing. For the deepest project coverage including price-list calculator and 40+ blog posts, see eldecoeoe.com. Eldeco’s official August 2026 films, the Caelum tower opening and the full site plan, are shown unedited at eldecoeoe.com/eldeco-eoe-videos.
RERA number: UPRERAPRJ125342/02/2026. Developer: Eldeco Sohna Projects Limited (Eldeco Group). Verifiable on up-rera.in, searching by project name or registration number. The registration covers all three towers (Haven, Elysian, Caelum); as of July 2026, Haven and Elysian are fully booked and the 2 BHK is sold out project-wide, so current availability is 3/4 BHK in Caelum tower only. RERA registration mandates: (a) 70% of buyer collections held in an escrow account, (b) quarterly construction progress reports, (c) delivery by January 2031 or penalty under RERA Act 2016. Always verify the RERA portal directly before any payment: the registration number, developer entity and escrow account status are all published there. The project's public register file, every field of UPRERAPRJ125342/02/2026 as filed, stays current on our register-readout site at upreratracker.com.
RERA declared completion date: January 2031 (per UPRERAPRJ125342/02/2026). With the standard 6-month RERA grace period, the effective possession window extends to mid-2031. The registration covers all 558 units across three towers: Haven, Elysian and Caelum, each Basement + Stilt + 32 floors. Construction mobilisation and foundation/piling work were underway as of May 2026. Vidastu Developers recommends buyers plan for a 5-year horizon from a 2026 booking date and verify the current completion field on the UP RERA portal before signing the agreement to sell.
We feature exactly three Yamuna Expressway / Greater Noida projects on this site: Gaur Yamuna Expressway, SKA Destiny One, and Eldeco Echoes of Eden. EOE is on the shortlist for four reasons:
This is the section you won’t find elsewhere. Shri Ravi Shankar Sharma, our co-founder and senior Vastu consultant, has reviewed the standard 3 BHK and 4 BHK floor plates of Eldeco EOE. Summary observations:
Best units to ask for: East-facing and North-East-facing units offer the most balanced Vastu profile (entry direction, kitchen placement, master-bedroom corner). Acceptable with caveats: South-facing units are workable with specific entrance-threshold adjustments. Ask twice before booking: South-West-corner-facing units; SW corner Vastu requires careful interpretation in apartment layouts.
Best units to ask for: North-East-facing and corner units with two-side openings. Note on master bedroom: the standard 4 BHK puts the master bedroom in the South-West, which is Vastu-positive; confirm tower-direction so the SW positioning aligns to the actual cardinal direction (not just the “labeled” plan direction).
Important: the above is general guidance from a floor-plate review. Unit-specific Vastu (your shortlisted tower, floor, direction) requires an on-site Vastu visit. Book a Property Vaastu pre-purchase audit (₹11,000) before you book, for unit-specific recommendations.
Vidit Kaushik, our founder, holds a Civil Engineering degree from BITS Pilani. Notes from his structural review of EOE:
Yes. Floor plans are available for every Eldeco EOE configuration: 2 BHK+2T (1,250 sqft, sold out), 3 BHK+2T (1,550 sqft), 3 BHK+3T (1,850 sqft), 4 BHK Penthouse (2,700 sqft), and 4 BHK Grand Penthouse (3,150 sqft), all super built-up area, all VRV air-conditioned. We share the full floor-plan set on WhatsApp on request. Use the form below. Current availability (as of July 2026) is 3/4 BHK in Caelum tower only, because Haven and Elysian are fully booked. The table below uses super built-up areas; always verify RERA carpet area from the UP RERA portal (UPRERAPRJ125342/02/2026) before booking. For brochure PDFs and downloadable floor plans, see eldecoeoe.com/eldeco-eoe-floor-plan, the official channel-partner site for booking and full-project documentation.
RERA carpet area across the five Eldeco EOE floor plans runs from 700.31 sq.ft on the sold-out 2 BHK + 2T to approximately 1,819.20 sq.ft (plus approximately 604.93 sq.ft of terrace, per the developer's area table) on the 4 BHK Grand Penthouse; among configurations open for booking, carpet starts at 870.70 sq.ft on the 3 BHK + 2T. The full super area, built-up area and balcony breakdown for the 3 BHK plans is further down this page.
| Configuration | Super BUA (sqft) | RERA Carpet (approx.) | Current BSP | Entry Price* |
|---|---|---|---|---|
| 2 BHK + 2T | 1,250 sqft | 700.31 sqft | ₹11,000/sq.ft* super area, plus other charges, 8 October 2026 | Sold Out |
| 3 BHK + 2T | 1,550 sqft | 870.70 sqft | ₹11,000/sq.ft* super area, plus other charges, 8 October 2026 | on the dated cost sheet |
| 3 BHK + 3T | 1,850 sqft | 1,056.81 sqft | ₹11,000/sq.ft* super area, plus other charges, 8 October 2026 | on the dated cost sheet |
| 4 BHK Penthouse (duplex) | 2,700 sqft | 1,558.39 + 403.96 terrace | ₹11,000/sq.ft* super area, plus other charges, 8 October 2026 | on the dated cost sheet |
| 4 BHK Grand Penthouse | 3,150 sqft | 1,819.20 + 604.93 terrace | ₹11,000/sq.ft* super area, plus other charges, 8 October 2026 | on the dated cost sheet |
*BSP only, current rate as of July 2026 (the launch-era rate was ₹8,999/sqft). Add GST (5%), PLC, parking, club, IFMS, stamp duty, and registration for the all-in cost. The current figure comes on the dated sheet from our desk on WhatsApp, in writing. Exact carpet area from RERA. Get live per-unit pricing from Vidit.
On the 1,550 sq.ft 3 BHK you are billed for 1,550 sq.ft of super area, but the developer’s own area table puts built-up at 1,193.73 sq.ft, RERA carpet at 870.70 sq.ft and the balconies at 218.40 sq.ft. Those four numbers describe the same home, and the gap between the first and the third is the single most misread thing in an Indian apartment purchase. The table below is the full breakdown for both 3 BHK types, transcribed from the Eldeco sales deck’s area sheets.
| Configuration | Super area (billed) | Built-up area | RERA carpet | Balcony area |
|---|---|---|---|---|
| 3 BHK + 2T | 1,550 sqft | 1,193.73 sqft | 870.70 sqft | 218.40 sqft |
| 3 BHK + 3T | 1,850 sqft | 1,492.73 sqft | 1,056.81 sqft | 326.40 sqft |
Read left to right, the three areas answer three different questions. Super area is what the price is calculated on: your home plus your share of lobbies, staircases, lifts and the clubhouse. Built-up area is the home itself including its own walls and balconies. RERA carpet is the floor you can actually lay a carpet on, measured to the inner walls, and it is the only one of the three defined in law, which is why it is the figure that must appear in your agreement to sell. Balcony area is stated separately because RERA excludes it from carpet even though you use it every day; on the 3 BHK + 2T that is a genuine 218 sq.ft, with every balcony drawn at five feet wide.
The practical use of this table is comparison. When a competing project quotes you a price per square foot, ask which area it is calculated on before you compare it with EOE’s ₹11,000/sq.ft* super area, plus other charges, 8 October 2026. A rate quoted on carpet and a rate quoted on super area are not the same currency, and the carpet figure here is roughly 44 per cent smaller than the super figure. Areas are transcribed from the developer’s sales deck; confirm the exact figures for your specific unit against the RERA filing (UPRERAPRJ125342/02/2026) before you sign anything.
Three official Eldeco creatives released for the May 2026 EOI window, plus a 25-second launch teaser:
As of May 2026, Eldeco EOE is in active site mobilisation phase. Foundation / piling work is in early stages. RERA registration (UPRERAPRJ125342/02/2026) is on file. Possession target: January 2031 (per RERA filing), with the standard 6-month grace period. Vidastu Developers does site visits every Wednesday. Call Vidit to join the next visit.
See detailed May 2026 construction update → | April 2026 update →
Eldeco EOE has its own dedicated landing site at eldecoeoe.com, operated by our sister brand Vidastu Advisory (UP RERA Agent UPRERAAGT000309/01/2026), the official channel partner for Eldeco Echoes of Eden. The deepest content on EOE on the internet lives there:
Every angle on Eldeco EOE, written by the channel-partner and advisory team:
Talk to the desk
3 BHK / 4 BHK options, floor-by-floor BSP, the 30:40:30 payment plan, or the 2 BHK sold-out waitlist. Tell us what you need and Vidit calls back directly. No call-centre, ever.
Call the desk · +91 98114 05300Sent only to Vidastu Developers, the same lead pipeline as eldecoeoe.com.
The desk is on it. Opening WhatsApp so we can talk now.
Vidastu Developers Pvt. Ltd., Greater Noida real estate consultancy and builder, building here since 2000. Vidit Kaushik: +91 98114 05300. Sister brand: Vidastu Advisory (UPRERAAGT000309/01/2026, channel partner for Eldeco EOE). Sources: UP RERA · Eldeco Group · eldecoeoe.com facts. Not investment advice. Past performance is not a guarantee, and values can fall. All prices are BSP on super area at time of writing and subject to change; GST, PLC, IFMS, parking, stamp duty and registration are additional. Verify RERA, carpet area and current pricing on the UP RERA portal before paying anything.