The 8-point checklist for any construction company in Greater Noida
Each point can be checked in a day or two. Ask for every answer in writing, and ask every firm the same questions, including us. A builder who welcomes the checks is the one to keep talking to.
- Registration and GST. Ask for the full registered name, the CIN and the GST number, and check that all three belong to the same company. Look the CIN up on the MCA portal and the GST number on the GST portal. Then check that the same company is named in the contract, word for word. One brand name can sit over several separate companies, so the question is always which company signs your contract. RERA is not the test here: it registers projects sold to the public, and it does not register a contractor building on a plot you already own.
- A written, fixed-scope contract. The contract should state the scope, an itemised quote with inclusions and exclusions, dated milestones, a change-order process, who pays approval and statutory charges, and how disputes are settled. A fixed total should move only when you change the scope. Each change should be priced and signed before the work is done. Oral promises are hard to prove. The contract clauses to insist on.
- Payments linked to stages. Money should follow verified physical progress. The usual sequence is agreement, foundation and plinth, RCC structure, brickwork and plaster, finishes, then handover, with a small retention commonly held until the snag list is cleared. Release each payment only against a stage that you, or someone you trust, has inspected.
- Materials named by brand and grade. Cement, TMT steel, wiring, pipes, sanitaryware and tiles should be named in the contract by brand and grade, or by a clear equivalent-grade clause. “Best quality” said out loud is not a specification. The concrete grade comes from the structural design. Each steel delivery should arrive with the maker’s test certificate for that lot.
- Site supervision you can name. Ask who will supervise your plot, by name, how often that person will be on site, and who takes your call. Ask for dated photos and video from your own plot on a fixed schedule, and put the schedule in the contract. A promise of regular updates with nothing fixed is not supervision.
- A structural engineer and an architect. Greater Noida and the YEIDA sectors sit in seismic zone IV under IS 1893. The frame should be designed by a qualified structural engineer, with ductile detailing to IS 13920. You should receive cube test reports at 7 and 28 days for every pour, and a structural stability certificate at the end. The building plan must come from a Council of Architecture registered architect. On a YEIDA plot, that architect must also be registered with YEIDA on the BPMS portal. The tests a zone IV frame should pass.
- Warranty terms in writing. Get the defect liability and any structural warranty into the contract: what is covered, for how long, and who pays for a defect found after handover. Ask whether structure, waterproofing, electrical and plumbing carry separate terms. A verbal promise to fix anything protects nobody.
- Completed homes you can visit. Walk a live site and a finished home, and speak to the owner without the builder in the room. Ask whether the dates held, whether the bill moved, and how snags were handled after handover. Brochure photos are not a reference.
The five kinds of builder a plot owner meets
A plot owner in Greater Noida usually meets five kinds of builder. None is better in the abstract. The difference is scope: who buys the materials, who coordinates the trades, and who carries the programme risk. The descriptions below are general, so run each firm through the checklist whatever it calls itself.
Large contractors
Who they are: firms that run many builds at once, often in more than one city, with a standard process, standard specifications and their own project staff.
Who it suits: owners who want a set process and are comfortable with a standard specification.
What to check: who supervises your plot by name, where that person is based, and whether your contract is a standard form or written for your plot.
Local civil contractors
Who they are: on this corridor the term usually means the party that executes the structural work: excavation, foundation, the RCC frame, brickwork and plaster. The engagement is commonly on a labour-rate or item-rate basis. The owner buys and holds the materials and coordinates the electrical, plumbing and finishing trades.
Who it suits: owners with the time, the site access and the appetite to run procurement and coordination themselves.
What to check: who owns the structural design, and who answers for the work the contractor does not do.
Turnkey firms
Who they are: companies that take the whole job from bare plot to handover, finishes included, for one agreed price under one contract. Procurement, sequencing and programme risk sit with the firm.
Who it suits: first-time builders, owners short of time, and owners who live abroad.
What to check: what the fixed price excludes, and whether the plan sanction and the completion certificate sit inside the contract.
Design-and-build firms
Who they are: firms whose own architects design the house and whose own team then builds it, so one party answers for the drawing and for the construction.
Who it suits: owners starting from a bare plot with no drawings, who want design questions and site questions to land on the same desk.
What to check: the architect’s Council of Architecture registration, the GNIDA or YEIDA filing route, and whether design and construction are one contract or two.
Labour-only contractors
Who they are: the contractor supplies labour only, and you buy every bag of cement, every bar of steel and every box of tile. An item-rate contract is a close relative: you pay agreed unit rates for the quantities actually measured, so the total is not fixed in advance.
Who it suits: hands-on owners who can procure materials and be on site every day.
What to check: who measures the work, who checks each delivery, and who absorbs wastage and price changes. Under this model, you do.
| Kind of builder | Who buys materials | Who coordinates the trades | Usually suits |
|---|---|---|---|
| Large contractor | The firm | The firm | Owners who want a standard process |
| Local civil contractor | Usually you | You, for everything after the structure | Owners who can run procurement |
| Turnkey firm | The firm | The firm | First-time and remote owners |
| Design-and-build firm | The firm | The firm, design included | Owners starting with no drawings |
| Labour-only contractor | You | You | Owners on site every day |
General descriptions for comparing models, not a statement about any firm. The contract you sign decides the real split.
Our guide to turnkey, labour-rate and item-rate contracts sets out who carries which risk under each model, and how to hire a contractor explains what the words civil contractor and construction company usually mean here.
How to compare two quotes line by line
Put the two quotes on the same lines before you look at either total. Two honest quotes for the same plot can differ widely because they price different scopes. A much lower quote is a prompt to ask which lines it leaves out. It is not proof of a better deal.
- Match the contract model first. A labour-rate quote leaves materials out. An item-rate quote is not a fixed total. A turnkey quote is one price for an agreed scope. Compare like with like. Turnkey vs labour-rate vs item-rate.
- Match the drawing. Ask both firms to price the same drawing, the same number of floors, the same basement or stilt, and the same finish level.
- Go through the lines in the table below. Ask each firm to state, in writing, where its number sits on every line.
- Price the gaps. If one quote leaves a line out, ask that firm to price it. Then compare the totals again.
- Run every quote through the same checker. Put each company’s quote, ours included, through the construction quote checker and compare what it flags.
| Line | Ask each firm | Why it matters |
|---|---|---|
| Concrete grade and mix | Which grade, and is it a design mix certified by a lab or a nominal mix batched on the plot? | The structural design fixes the grade, and the pour is tested against it. |
| Ductile detailing | Is detailing to IS 13920 priced in? | It is a zone IV requirement and puts more steel in more places. |
| Steel | Which brand and grade, and is there a bar schedule? | A single tonnage figure hides what the engineer designed. |
| Testing | Are cube tests and lab charges inside the quote? | If they are not, they come back to you as an extra. |
| Structural design | Who calculates the frame, who signs the stability certificate, and is that fee included? | A quote can leave the engineer out entirely. |
| Curing, cover and waterproofing | What curing period and method, what cover, and what waterproofing by area and method? | Each needs labour and material for its full period, so a quote can thin them out. |
| Finishes | Which brands for sanitaryware, fittings, tiles, paint, wiring and switches? | “Or equivalent” with no named brand leaves the choice to the firm. |
| Approvals and certificates | Who files the plan, who obtains the completion certificate, and who pays authority charges and fees? | One quote may include the paperwork while the other leaves it to you. |
| Exclusions and changes | What is excluded, and how is a change priced? | Mid-build changes are the single biggest source of billing disputes. |
| Payment schedule | How much before work starts, and which stage releases each payment? | A large advance moves the risk to you before a brick is laid. |
Lines drawn from this site’s guides to construction quality and contractor hiring. A way to read any quote, not a statement of any firm’s terms.
The way to compare companies’ quotes is to read each one the same way, and the construction quote checker does that for a quote on a YEIDA, Greater Noida or Noida plot. It lists the line items a quote leaves out, reads the escalation clause, the advance and the payment stages, restates the quoted rate on built-up area and places it against three dated published ranges, and on a YEIDA plot shows the area the plot may legally have. It runs in your browser and sends nothing while you check. Run each company’s quote through it, then set the gaps it shows beside the lines in the table above.
One tool on this site has a similar name and a different job. Is that quote fair? checks the price of a flat or a YEIDA plot you are buying against a dated reference. It does not price a build.
YEIDA and Greater Noida authority checks
Before you sign, confirm which authority governs your plot, who files the building plan, and who obtains the completion certificate. Greater Noida city plots fall under GNIDA. The Yamuna Expressway sectors fall under YEIDA. The two run separate byelaws and separate plan approvals, so a plan filed with the wrong authority goes nowhere.
Map sanction
On a YEIDA plot, every sanction and completion application has gone through the online BPMS portal since 1 August 2024, according to the portal’s own notice. The allottee logs in and picks an architect from a list inside the portal. Only architects registered with the Council of Architecture and with YEIDA are on that list. Ask each builder which architect will file your plan, and check the name. The BPMS sanction, step by step.
On a GNIDA plot, a Council of Architecture registered architect files the plan through GNIDA’s online system, which checks the drawing against the byelaws before sanction. Building in Greater Noida under GNIDA.
No structural work should start before the sanction is in hand. Without a sanctioned plan, YEIDA will not issue a completion certificate.
The build-by deadline
YEIDA’s 87th board meeting on 7 November 2025 extended the no-charge construction window to 31 December 2026 for residential allottees who have executed their lease deeds (Times of India, 8 November 2025). After that date, an unbuilt plot moves to formal time extensions and extension charges under the scheme terms. Ask any builder for a dated, written plan that works back from your deadline, and read the YEIDA deadline guide on phased completion. On a GNIDA plot, the build-by date sits in your own allotment and lease terms.
The completion certificate
The completion certificate is the document that closes the obligation. On a YEIDA residential plot, the minimum you must build to get it is 40 sqm or 50 per cent of the maximum permissible ground coverage, whichever is more, with a functional toilet or bath and a kitchen (Regulation 24.1(2)(x), YEIDA Building Regulations 2010). The certificate is needed for utilities, a home loan, registry and resale. Get it in writing whether the builder files it, and whether that filing is inside the contract. See the YEIDA completion certificate guide, the regulation with its full table and the whole build sequence on a YEIDA plot.
Red flags
Any one of these is a reason to stop and ask again, in writing.
- A single rate per square foot quoted over the phone before anyone has walked the plot. A bare headline rate hides exclusions.
- A large advance before work starts. Published contractor-hiring guides treat a demand for more than roughly 30 to 40 per cent upfront as a red flag.
- A contract in the name of a company that does not match the GST number or the name on the visiting card.
- “You arrange the approval”, or no named architect for the plan.
- Materials described as best quality, with no brand and no grade.
- One salesman who handles everything, and no named site supervisor.
- No live site to walk and no past owner to call.
- Defect liability promised out loud and missing from the document.
- An offer to start work before the plan is sanctioned.
- A RERA number offered as proof that a firm’s construction work is checked. RERA registers projects for sale; a contract to build on your own plot sits outside it.
How Vidastu measures up
Everything above applies to us too. Below is how Vidastu Developers Pvt. Ltd. answers each point, as this site already states it, with the page where each statement sits. Test it the way you would test any other firm.
| Checklist point | What Vidastu states | Where |
|---|---|---|
| Registration and GST | Vidastu Developers Pvt. Ltd., incorporated in 2023, CIN U68200UP2023PTC192378, GST registered. It is a construction company and is not itself UP-RERA registered. The UP-RERA agent registration UPRERAAGT000309/01/2026 belongs to sister brand Vidastu Advisory, for property advice only. | About |
| Written fixed-scope contract | A written contract is signed before any payment. It states one total for the agreed scope and a per-item rate card. The total moves only if you change the scope, and any change is re-quoted in writing before work continues. | Vidastu Build |
| Stage-linked payments | Each payment is tied to a completed, inspectable stage: foundation, slabs, brickwork, finishes, handover. The stage percentages are printed in the contract before you sign. | Vidastu Build |
| Materials by brand and grade | Branded cement and ISI TMT steel in the RCC frame. Brand tiers are specified in the itemised quote, which comes with a line-by-line inclusion sheet. | Vidastu Build |
| Site supervision | Director Vidit Kaushik (Civil Engineering, BITS Pilani) runs each build day to day and walks the plots. Director Ravi Shankar Sharma anchors the practice. The firm does not take work it cannot walk weekly. Photos and video from your own site arrive on WhatsApp every week. | About |
| Engineer and architect | A registered architect draws the concept plan. The soil test, structural drawings, plan sanction and completion certificate are filed in-house. Cube test reports at 7 and 28 days from your own pours are handed over with the house. | Vidastu Build |
| Warranty terms | Defect-liability terms are in the contract. A structural warranty is written into every Vidastu Build contract, with the term agreed at signing. | Vidastu Build |
| Homes you can visit | Live sites at different stages can be walked, and owners who hired Vidastu can be called. Builds were running in Sectors 18, 20 and 22D and in Gaur Yamuna City in October 2026. A client’s project is published only with that client’s written consent. | Portfolio |
Each statement is reproduced from the page linked beside it, as published on 2 November 2026.
Years and place. Director Ravi Shankar Sharma has built in Greater Noida since 2000. The company was incorporated in 2023, and both of its practices predate that. The office is at 206, Second Floor, Meridian View Plaza, Block E, Alpha-I Commercial Belt, Greater Noida 201310. Vidastu builds on plots the client already owns, across Noida and the NCR, with its deepest base on YEIDA and Greater Noida plots; the GNIDA approval route, the city sectors and the published cost range for Greater Noida are on its page as a construction company in Greater Noida. There is no rate card: one binding, itemised fixed quote follows a free site walk. WhatsApp +91 95404 45300.
Where we build, in detail: Greater Noida, Sector 15C, Sector 16, Sector 17, Sector 18, Sector 20, Sector 22D, Sector 24A, Gaur Yamuna City, Jewar Airport corridor and YEIDA industrial plots. Building inside Noida Authority limits instead? See construction company in Noida. More: turnkey construction overview · what drives a build cost · Vidastu Build packages · contact the project desk. Hindi में पढ़ें: यमुना एक्सप्रेसवे निर्माणकर्ता.