Yamuna Expressway · YEIDA Sector 20

House Construction in YEIDA Sector 20, a Dedicated Residential Sector

Vidastu Developers Pvt. Ltd. (CIN U68200UP2023PTC192378) is a construction contractor (nirmaankarta); its advisory desk is UP-RERA agent (UPRERAAGT000309/01/2026) building turnkey homes, renovations and interiors on YEIDA Sector 20 plots on the Yamuna Expressway, Gautam Buddh Nagar, Uttar Pradesh. Plan approvals are handled in-house as part of every build. Sector 20 is a dedicated, officially “ongoing” residential sector with larger 300 to 4000 sqm plots, ideal for a full independent home with a basement and garden. Incorporated 2023 by Ravi Shankar Sharma (building in Greater Noida since 2000), delivery led by Vidit Kaushik (BITS Pilani). WhatsApp +91 95404 45300 with your plot size.

  • Officially “ongoing” residential
  • 300–4000 sqm plots
  • Airport & Film City belt

Vidastu Build packages, all Vaastu-aligned by design — priced on call after a free site walk · UP-RERA UPRERAAGT000309/01/2026

Unlike mixed-use sectors, YEIDA Sector 20 is a dedicated residential sector — listed as officially “ongoing” on the Yamuna Expressway Authority’s site — with larger planned plots of 300, 500, 1000, 2000 and 4000 sqm. That makes it a natural fit for a full independent home with room for a basement, stilt parking and a garden. Vidastu Developers Pvt. Ltd. (CIN U68200UP2023PTC192378) is a construction contractor (nirmaankarta) building turnkey homes, renovations and interiors on Sector 20 plots — plan approvals handled in-house as part of every build. We build across Noida & NCR — HQ Greater Noida, minutes from this corridor.

Timeline, up front: map approval has to be in hand before construction can start, and the build itself is 5 to 8 months, so start early to beat the 31 December 2026 deadline. We price every home on call — one binding, itemised fixed quote after a free site walk, never a public rate card.

Updated June 2026
2023
Incorporated; two Directors · Greater Noida HQ
300–4000
sqm planned plot sizes · Sector 20
5–8
months · start on site to handover
5
accountable stages · design to keys
4.8★
Vidastu property advisory rating
—

days left · free construction window closes 31 Dec 2026

YEIDA’s 87th board meeting (November 2025) extended the free construction deadline to 31 December 2026 — 10,000+ lease-deed holders haven’t built, against only ~1,100 functional certificates issued. Sector 20’s Pocket N lease deeds have been executing since April 2025, so for many owners here the clock is already running.

See the full deadline plan & backward checklist →

The sector

Is YEIDA Sector 20 a confirmed dedicated residential sector?

Direct answer: Sector 20 is a confirmed, dedicated residential sector, listed as “ongoing” on YEIDA’s official website. That distinction matters: where some Yamuna Expressway sectors mix residential with commercial land, Sector 20 is a core plotted-residential belt — near Noida International Airport (Jewar) and the proposed Film City. Its planned plots run larger than the small plots in newer draw schemes, which suits owners building a full family home.

Planned plot sizes are 300, 500, 1000, 2000 and 4000 sqm. Older 2009-scheme plots in similar sizes also change hands on the resale market across the corridor.

A dedicated residential belt with larger plots — the kind of land where a basement, stilt parking and a garden actually fit.

FAR & coverage

How much can I build on a YEIDA Sector 20 plot — FAR and coverage?

Short answer: Sector 20’s larger plots support a full independent home — family floors plus a rental or guest floor, with a basement, stilt parking and a garden. Ground coverage and FAR are set by YEIDA byelaws and scale with plot size; decoding that grid is our job, not yours. At the design stage a CoA-registered architect sizes your drawings to your plot’s exact sanctioned figures, so nothing bounces at scrutiny.

Want to know what your plot can hold — floors, built-up area and budget? Send your plot size and we’ll tell you on the call, then put one binding, itemised fixed quote in writing after a free site walk. WhatsApp +91 95404 45300 →

What we build

What does Vidastu build in YEIDA Sector 20?

Turnkey homes

End-to-end construction on your Sector 20 plot — making full use of the larger plot sizes, within FAR, on a written milestone contract.

Approvals, in-house

Drawings by a CoA-registered architect, online BPMS sanction and the completion certificate — handled as part of every build. How the 5-stage build runs

Renovation & interiors

Additions, modernisation and full interior fit-out for existing homes in Sector 20.

NRI remote build

Build your Sector 20 home from abroad with photo/video updates and milestone-linked payments.

Mind the deadline. YEIDA requires construction completed and a completion/occupancy certificate obtained within about three years of possession; the common deadline now runs to 31 December 2026 (10,000+ allottees benefit). Late completion attracts an escalating annual penalty levied on the prevailing circle rate. On the larger Sector 20 plots a full build takes time, so start early.

Vidastu Developers Pvt. Ltd. is a registered construction firm (CIN U68200UP2023PTC192378) with UP-RERA-registered property advisory via sister brand Vidastu Advisory (Agent UPRERAAGT000309/01/2026), whose Director Ravi Shankar Sharma has built in Greater Noida since 2000, with delivery led by Director Vidit Kaushik (BITS Pilani) — the same team behind Vidastu’s 4.8★-rated property advisory. We serve the full Yamuna Expressway corridor and Greater Noida construction projects. We work only on a written contract — and once your build starts, you see your own site daily: photo and video updates on WhatsApp.

How the build runs — and what each stage involves

  1. Design & layout. A CoA-registered architect plans within your plot’s ground coverage and FAR — floors, rooms, parking, basement.
  2. YEIDA map approval. The building plan is filed online via the BPMS portal and cleared through Smart-DCR scrutiny — in-house, as part of the build.
  3. Structure. Foundation, RCC frame, brickwork and slabs to the sanctioned design, built to the structural-stability certificate.
  4. Finishes & interiors. Plaster, flooring, electrical, plumbing, paint and fit-out to the finish level priced in your quote.
  5. Completion & handover. We assist with the YEIDA completion/occupancy certificate (needed for utilities, loans, registry and resale), then hand over the keys. A turnkey build is typically 5 to 8 months from start on site to handover, depending on plot size, floors and finish level; the dated milestones are fixed in the written contract.

Payments are stage-wise — 10% on agreement & design sign-off, 20% at foundation & plinth, 35% at RCC structure & brickwork, 25% at finishes, 10% at handover (indicative split; exact milestones fixed in your written contract).

Location

Where is YEIDA Sector 20 on the Yamuna Expressway?

Sector 20 is on the Yamuna Expressway in Gautam Buddh Nagar, in the Noida International Airport (Jewar) and proposed Film City corridor — commercial flights from the airport begin 15 June 2026.

Questions

Sector 20 construction FAQ

Do you work as a construction contractor near me in YEIDA Sector 20?
Yes. Vidastu Developers Pvt. Ltd. (CIN U68200UP2023PTC192378) is a construction contractor (nirmaankarta) building turnkey homes, renovations and interiors on YEIDA Sector 20 plots, with plan approvals handled in-house. Our Greater Noida HQ is minutes away. Sector 20 is a dedicated, officially “ongoing” residential sector with larger 300–4000 sqm plots, about 12 minutes from Noida International Airport (Jewar) — so we size full family homes with a basement, stilt parking and garden. WhatsApp +91 95404 45300 with your plot size.
Is YEIDA Sector 20 a confirmed residential sector?
Yes. Sector 20 is a dedicated residential sector listed as officially “ongoing” on the Yamuna Expressway Authority’s site, under the development of residential Sector 20. It is a core plotted-residential belt near Noida International Airport (Jewar) and the proposed Film City, with planned plot sizes of 300, 500, 1000, 2000 and 4000 sqm.
What plot sizes are available in Sector 20?
Planned plot sizes are 300, 500, 1000, 2000 and 4000 sqm — larger, dedicated residential plots compared with the smaller 162–290 sqm plots in newer schemes like RPS-10/2026. Older 2009-scheme plots in this size range also trade on the resale market.
How much can I build on a Sector 20 plot — FAR and coverage?
Under YEIDA byelaws, coverage and FAR scale with plot size — on Sector 20’s larger plots that typically means a full independent home with a basement, stilt parking and a garden. Decoding the exact grid is our job: a CoA-registered architect sizes your design to your plot’s sanctioned figures. Send your plot size on WhatsApp and we’ll tell you what fits.
What does it cost to build a house on a 300 sqm Sector 20 plot?
Every plot and design is different, so we don’t publish rates. Share your plot size, floors and finish level and you get one binding, itemised fixed quote after a free site walk — priced on call, agreed in writing before work begins.
When must I complete construction on my Sector 20 plot?
YEIDA requires construction completed and a completion/occupancy certificate obtained within about three years of physical possession. The common construction deadline has been extended by one year to 31 December 2026, benefiting 10,000+ allottees. Confirm your specific date from your lease deed, and plan early — map approval has to be in hand before construction can start, and the build itself is 5 to 8 months.
What are the construction payment stages, and how are payments released?
A Vidastu build runs in five accountable stages: design & layout, YEIDA map approval, structure, finishes & interiors, and completion & handover. Payments are milestone-linked — money is released against completed stages, never one large lump sum up front — with the milestone-linked timeline and itemised costs fixed in your written contract before a single rupee changes hands.
What are the Vidastu Build packages in Sector 20?
Vidastu Build runs three packages — Essential, Premium and Luxe — all Vaastu-aligned by design. Essential uses branded cement, ISI TMT steel, UPVC windows, copper wiring and CPVC plumbing; Premium adds Jaquar-tier CP, Asian Paints premium emulsion and Hindware-tier fixtures; Luxe adds imported tile and stone options. Each is priced on call: one binding, itemised fixed quote after a free site walk — see what each package includes.
Can an NRI build a house on a Sector 20 plot remotely?
Yes. We run remote-build management with regular photo/video updates, online progress reports and milestone-based payments, so you can build your Sector 20 home from abroad without being on-site.

Keep reading

Explore more

Also building in: Sector 18 · Sector 22D · Gaur Yamuna City · Greater Noida · Jewar Airport

Vidastu Build — three packages: Essential · Premium · Luxe, all Vaastu-aligned by design. Priced on call — one binding, itemised fixed quote after a free site walk. See what each package includes →

Sector 20 plot?

Got a plot in YEIDA Sector 20?

Send your plot size and the floors you want. We’ll share one binding, itemised fixed quote, a timeline to beat the 31 Dec 2026 deadline, and a nearby site you can visit.

The delivery lead calls you back — not a call centre.

Or get a callback in 24 hours

The delivery lead calls you back — not a call centre.