Where does Sector 15C sit on the Yamuna Expressway corridor?
Sector 15C is a brand-new plotted residential sector on the Yamuna Expressway in Gautam Buddh Nagar; it entered the market as one of the three sectors in YEIDA’s RPS-10/2026 scheme, alongside the more established Sector 18 and the RERA-registered Sector 24A. Scheme coverage places 15C in the Noida International Airport (Jewar) influence zone, near planned institutional and hospitality clusters, and reports it as the closest of the three RPS-10 sectors to the airport (reported: confirm on the ground; we walk the site with you before quoting).
Because the sector is new, its first wave of houses will set its character. Internal roads, services and neighbours arrive together.
What allottees here will typically build: a G+1 or G+2 independent house within the plot’s sanctioned coverage and FAR on the 162 to 290 sqm RPS-10 modules : ground floor for the family, an upper floor to live in or let out. That is exactly the build our fixed-price packages are sized for.
Key fact
A first-owner sector: everyone in Sector 15C starts from the same allotment letter.
Sector 15C at a glance
Sector profile per RPS-10/2026 scheme coverage; figures marked “reported” are not an official YEIDA count; verify against your allotment letter and brochure. YEIDA portal →
RPS-10/2026: the draw that gave Sector 15C its first owners
The short answer
The RPS-10/2026 draw was held on 18 June 2026 at India Expo Centre & Mart, Greater Noida, allotting 973 residential plots across Sectors 15C, 18 and 24A against more than 1 lakh applications; reported figures range from 1,05,842 to 1,10,034, roughly 108+ applicants per plot (as reported in scheme coverage; verify your allotment letter and result on the official YEIDA portal). The scheme rate is ₹36,260 per sq m, a YEIDA land allotment rate (clause 4 of the scheme brochure, dated 4 April 2026), and the full premium is payable within 60 days of the allotment letter (clause 8); your own allotment letter states your plot’s premium.
Your construction clock has not started. The RPS-10/2026 brochure gives three years to build from the date the lease deed is executed (clause 14). The lease deed follows possession, which YEIDA offers after completing development, approximately five years on (clause 13(iv)); clause 22(i) says possession is handed over after five years from the allotment letter. What is due now is the premium: 100 per cent within 60 days of the allotment letter (clause 8).
Scheme terms, rate and plot table read on 15 November 2026 in YEIDA’s RPS-10/2026 brochure (clauses 4, 8, 13, 14 and 22; table 1(A)). Application counts and the draw venue are as reported in scheme coverage, not an official YEIDA figure we confirmed. Result check: yamunaexpresswayauthority.com
New Sector 15C allottee? Your sequence from letter to keys
Short answer
Verify the allotment letter, clear dues and take possession, register the lease deed, get the naksha sanctioned on BPMS, then build to a completion certificate. Each step gates the next: you cannot file a building plan without an executed lease deed, and you cannot get utilities, a loan against the built house or a clean resale without the completion certificate. For the full walk-through of all five stages, see our 5-stage build journey.
- Verify the allotment letter: check plot number, size, rate and payment schedule against YEIDA records before paying anyone. Full checklist: YEIDA plot allotment: next steps.
- Pay the premium, then wait for the possession offer: 100 per cent within 60 days of the allotment letter (clause 8). YEIDA offers possession after development, approximately five years on (clause 13(iv)).
- Execute & register the lease deed: stamp duty, IGRS-UP registration and mutation to your name. Guide: YEIDA lease deed after allotment.
- Get the naksha (map) sanctioned: filed online on YEIDA’s BPMS portal by a CoA-registered architect, through Smart-DCR scrutiny. Guide: YEIDA building plan approval.
- Build on a written milestone contract: structure, finishes and the completion certificate. Packages: Vidastu Build.
Deadline context: earlier allottees are building against the extended 31 December 2026 window. Your own RPS-10 deadline is three years from your lease deed, and the lease deed follows the possession offer. Use the wait: settle the design and the budget now, so the map can go to BPMS the week your lease deed is registered. WhatsApp +91 95404 45300 →
What it costs to build in YEIDA Sector 15C
Short answer: what a house in Sector 15C costs follows from the area your plot size allows, so it is worked out plot by plot, not from a generic per-sq-ft rate. For the six RPS-10/2026 plot sizes in table 1(A) of the scheme brochure (162, 183, 184, 200, 223 and 290 sqm), each with its own size guide, the table gives the Table 1 band’s maximum ground coverage and FAR, the built-up area of a G+1 and a G+2 house, and a link to that size’s cost build-up.
| Plot size | Max coverage, FAR | G+1 built-up area | G+2 built-up area | Cost |
|---|---|---|---|---|
| 162 sqm | 75 per cent, FAR 1.80 | 243 sqm (2,616 sq ft) | 291.6 sqm (3,139 sq ft) | cost build-up |
| 183 sqm | 75 per cent, FAR 1.80 | 274.5 sqm (2,955 sq ft) | 329.4 sqm (3,546 sq ft) | cost build-up |
| 184 sqm | 75 per cent, FAR 1.80 | 276 sqm (2,971 sq ft) | 331.2 sqm (3,565 sq ft) | cost build-up |
| 200 sqm | 75 per cent, FAR 1.80 | 300 sqm (3,229 sq ft) | 360 sqm (3,875 sq ft) | cost build-up |
| 223 sqm | 75 per cent, FAR 1.80 | 334.5 sqm (3,601 sq ft) | 401.4 sqm (4,321 sq ft) | cost build-up |
| 290 sqm | 75 per cent, FAR 1.80 | 435 sqm (4,682 sq ft) | 522 sqm (5,619 sq ft) | cost build-up |
Coverage and FAR: Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010, for each plot’s size band (Table 1, transcribed). Built-up area: as worked out on each size page, at 1 sqm = 10.7639 sq ft; G+2 is three full floors or the FAR cap, whichever is smaller. A basement, balconies up to 1.5 m wide and, on plots of 112 sqm and above, a stilt floor sit outside FAR but are still built, so ask any quote to state the area it charges on.
The brochure’s table 1(A) counts 476 plots of 162 sqm, 4 of 183, 4 of 184, 481 of 200, 6 of 223 and 2 of 290 sqm across Sectors 15C, 18 and 24A, and does not say which sector carries which size; your allotment letter states yours. The scheme’s other figures are on our RPS-10/2026 data sheet.
How each cost build-up works. On each size page, the per-sq-ft ranges three publishers print for Greater Noida and Noida (Aarna Constructions, updated 7 November 2026; Bajaj Finance, no date on the page, read 11 November 2026; BrickNBolt, updated 9 June 2026) are applied to that plot’s G+1 and G+2 area, with what each range leaves out: approval fees and the boundary wall sit outside all three. None of the ranges is specific to YEIDA sectors, and none of it is a Vidastu rate. Vidastu’s price for your Sector 15C plot comes as one binding, itemised fixed quote after a free site walk; if a builder has already priced your plot, you can check a quote you already have line by line, and the cost guide sets out the plot-by-plot method in full.
What does Vidastu build in YEIDA Sector 15C?
Plot to keys
- Independent-house construction on your own plot
- Within FAR, on a written milestone contract
- Finished to a completion certificate
Approvals, in-house
- Drawings by a CoA-registered architect
- Online BPMS sanction, Smart-DCR scrutiny
- Completion certificate handled as part of every build
Allottee paperwork walkthrough
- Letter verification & lease-deed sequence
- BPMS filing mapped to your own dates
- No guesswork for first-time allottees
NRI remote build
- Photo/video updates on WhatsApp
- Milestone-linked payments
- Build your Sector 15C home from abroad
Vidastu Developers Pvt. Ltd. is a registered construction firm (CIN U68200UP2023PTC192378), with UP-RERA-registered property advisory via sister brand Vidastu Advisory (Agent UPRERAAGT000309/01/2026), whose Director Ravi Shankar Sharma has built many homes in Greater Noida since 2000, with delivery led by Director Vidit Kaushik (BITS Pilani), the same team behind Vidastu’s 4.8★-rated property advisory. We serve the full Yamuna Expressway corridor and Greater Noida. We work only on a written contract, and once your build starts, you see your own site daily: photo and video updates on WhatsApp.
How the build runs: approval to handover on dated milestones
- Design & layout (stage 1): we plan within your plot’s ground coverage and FAR (floors, rooms, parking, basement) with a CoA-registered architect.
- YEIDA map approval (stage 2): the building plan is filed online via the BPMS portal and cleared through Smart-DCR scrutiny.
- Structure (stage 3): foundation, RCC frame, brickwork and slabs to the sanctioned design, built to the structural-stability certificate.
- Finishes & interiors (stage 4): plaster, flooring, electrical, plumbing, paint and fit-out to the finish level priced in your quote.
- Completion & handover: we assist with the YEIDA completion/occupancy certificate (needed for utilities, loans, registry and resale), then hand over the keys.
Every stage runs on a written milestone contract, with money released against completed stages and milestone updates on WhatsApp, never one large advance. Indicatively: 10% on agreement & design sign-off · 20% foundation & plinth · 35% RCC structure & brickwork · 25% plaster, flooring & finishes · 10% handover.
Where is YEIDA Sector 15C on the Yamuna Expressway?
Sector 15C is on the Yamuna Expressway in Gautam Buddh Nagar, in the Noida International Airport (Jewar) influence zone, reported in scheme coverage as the closest of the three RPS-10/2026 sectors to the airport.
Map shows the broader Sector 15 area; Sector 15C’s exact plot layout is in your allotment letter and the scheme layout plan on the YEIDA portal.