Plot Brief · Yamuna Expressway / YEIDA

Building on a 162 sqm YEIDA plot: cost, coverage, FAR, setbacks and the certificate minimum

A 162 sqm (about 194 sq yd or gaj, 1,744 sq ft) YEIDA residential plot sits in the “above 120 and up to 200 sqm” band of Table 1: ground coverage up to 75 per cent (a footprint of about 121.5 sqm), FAR 1.80 (about 291.6 sqm across all floors), a 15 m height cap and a 3.0 m front setback (Regulation 24.1, YEIDA Building Regulations 2010). The completion certificate needs at least about 60.75 sqm built with a working toilet and kitchen, the map must be sanctioned on BPMS before work starts, and for allottees with an executed lease deed the certificate must be in hand by 31 December 2026.

Sources: The Yamuna Expressway Industrial Development Area Building Regulations, 2010, Notification No. 311/77-3-09-8X/09 dated 20 December 2010 (Regulation 24.1 and Table 1, Regulations 10, 13(2), 15, 20.1 and 24.8(16)), as transcribed on our YEIDA building regulations page, read 6 October 2026; YEIDA’s 87th board meeting of 7 November 2025, as reported by the Times of India, 8 November 2025; the YEIDA BPMS portal. Derived areas are our own arithmetic on the band figures, converted at 1 sqm = 10.7639 sq ft and rounded. Your allotment letter, lease deed, sector zonal plan and the current byelaws govern your own plot.

The numbers for a 162 sqm plot

Everything on this page follows from the Table 1 band the plot falls in. The figures in the middle column are the band limits; the areas are our arithmetic on them, indicative and not a sanctioned envelope.

RuleOn a 162 sqm plotWhere it comes from
Table 1 bandAbove 120 and up to 200 sqmRegulation 24.1, Table 1
Maximum ground coverage75 per cent: about 121.5 sqm (1,308 sq ft) of footprintTable 1, as transcribed on our regulations page
Maximum FAR1.80: about 291.6 sqm (3,139 sq ft) across all floorsTable 1
Maximum height15 m, counted from the top of the drain to the top of the buildingTable 1 and its notes
Front setback3.0 mTable 1
Side open spaceTable 1 prints no plain side setback or ramp pocket for this band; the side open space follows the sector zonal planTable 1 and its note on the zonal plan
Minimum rear open spaceAn envelope pocket of 5.2 m x 2.4 m on the envelope planTable 1
Dwelling unitsUp to three dwelling units (the band above 100 and up to 500 sqm)Regulation 24.1(2)
Certificate minimumAbout 60.75 sqm (654 sq ft) built, with a working toilet or bath and a kitchenRegulation 24.1(2)(x): the higher of 40 sqm and 50 per cent of permissible coverage

Band figures from Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010 (Notification No. 311/77-3-09-8X/09, 20 December 2010), as transcribed on our regulations page and gathered on YEIDA plot construction rules. Table 1 notes that specific setbacks follow the zonal plan, and that where the permissible coverage cannot be reached within the setbacks, the setbacks of the next smaller category may be followed. YEIDA has amended its rules since 2010; your sector zonal plan and the current byelaws govern.

What the FAR buys: floors on a 162 sqm plot

FAR 1.80 divided by 75 per cent coverage pays for about 2.4 full-footprint floors. Two full floors use about 243 sqm and leave about 48.6 sqm for a third, roughly 40 per cent of the footprint: a set-back top floor opening onto a terrace, not a third full floor. The Regulations set no fixed floor count; the 15 m cap and the FAR do the limiting. Our build guides plan G+1 or G+2 homes inside the sanctioned FAR, coverage and height.

Stilt parking up to 2.4 m to beam bottom is FAR-free on plots of 112 sqm and above (Regulation 24.1(2)), so a stilt ground floor moves the living floors up without spending FAR. A single basement equal to the ground coverage is excluded from FAR when it is used for parking, services or storage, and balconies up to 1.5 m wide are excluded too; a wider balcony counts one fourth of its area. Enclosing a balcony in any form is prohibited and cannot be compounded (Regulation 24.8(16)). The method behind these figures is worked through on how much can I build on a YEIDA plot.

Setbacks and the buildable rectangle

Coverage says how much of the plot the house may cover. Setbacks say where. On this band the front setback is 3.0 m. For the side, Table 1 prints no plain side setback or ramp pocket for this band; the side open space follows the sector zonal plan. The minimum rear open space is an envelope pocket of 5.2 m x 2.4 m on the envelope plan. If the setbacks leave a rectangle smaller than 121.5 sqm, the rectangle wins and the coverage percentage is academic.

Two things this page cannot hold: your plot’s frontage and depth, which are on the YEIDA-issued site plan, and your sector’s zonal plan. Bring both to a Council of Architecture registered, YEIDA-empanelled architect and the buildable rectangle is a short calculation. Open vehicle ramps are permitted in the side setback only, which decides where a basement entry can go.

The certificate minimum on this plot

Regulation 24.1(2)(x) sets the floor, not the ceiling: at least 40 sqm, or 50 per cent of the maximum permissible ground coverage, whichever is more, with a functional toilet or bath and a kitchen. On a 162 sqm plot at 75 per cent coverage that is about 60.75 sqm (654 sq ft), indicative only. An empty plinth or a bare frame does not count.

The occupancy certificate adds flooring and electrical wiring (fittings not mandatory); plumbing and fittings in at least one toilet and the kitchen; trees per Table 6 or current directions and a number plate; a boundary wall; internal and external finishing (plastering and whitewashing not mandatory); a lockable house with all external doors and windows fitted; and no violation of the Regulations, the Zonal Plan or the Master Plan at the time of the certificate (Regulations 20.1.1 and 20.1.2, as read on our regulations page). For allottees with an executed lease deed, YEIDA’s 87th board meeting extended the no-charge construction window to 31 December 2026, and the certificate itself, not the filing, is what meets it. With under two months left as this page is published, the route our deadline guide sets out is a phased build: the qualifying block built and certified first, the remaining floors finished under the same sanctioned plan. Who issues the certificate, the steps and the documents are on YEIDA completion certificate.

Where 162 sqm YEIDA plots are

162 sqm is a module in RPS-10/2026 (Sectors 15C, 18 and 24A; 162, 200, 223 and 290 sqm, draw of 18 June 2026) and in RPS-08(A)/2024 in Sector 24A, as our Sector 15C, Sector 18 and Sector 24A pages report from scheme coverage. Your plot area comes from your allotment letter, not from a scheme brochure or this page.

From allotment to certificate on a 162 sqm plot

  1. Lease deed and dues. Execute and register the lease deed, mutate the plot to your name and clear YEIDA dues on PIMS; a sanction cannot proceed while dues are pending (lease deed guide; BPMS guide).
  2. Design inside the band. Footprint up to about 121.5 sqm, total area up to about 291.6 sqm, height within 15 m, setbacks per Table 1 and the zonal plan, dwelling units within the cap.
  3. Map sanction on BPMS. Only an architect registered with the Council of Architecture and with YEIDA can file; Smart-DCR checks the drawing before an officer does; the sanction is valid for 5 years (BPMS guide, drawing requirements).
  4. Build to the sanctioned plan. Any departure from it is the first ground on which a certificate is refused (completion certificate guide).
  5. Completion on BPMS. At least about 60.75 sqm built to the occupancy list, the architect’s certification, YEIDA’s inspection, and the certificate (completion certificate guide).

Plot size, floors, soil and finish level drive the cost; the next section works them through for this plot against dated published ranges, and the fixed price comes as one itemised quote after a free site walk.

What it costs to build on a 162 sqm plot

A generic rate does not fit a plot, so this section starts from the plot: the area a house here can have under Table 1, the per-sq-ft ranges three publishers print for Greater Noida and Noida applied to that area, what those ranges leave out, and what moves the number. None of it is a Vidastu rate or a quote.

The built-up area

BuildBuilt-up areaHow it is worked out
G+1, two full floors243 sqm
(2,616 sq ft)
2 x 121.5 sqm footprint at 75 per cent coverage; inside the FAR area of 291.6 sqm
G+2, to the FAR cap291.6 sqm
(3,139 sq ft)
FAR 1.80 caps the total at 291.6 sqm, so the second floor is about 48.6 sqm, roughly 40 per cent of the footprint

Our arithmetic on this page’s own Table 1 figures (75 per cent coverage, FAR 1.80), at 1 sqm = 10.7639 sq ft. A stilt floor (FAR-free on plots of 112 sqm and above), a basement and balconies up to 1.5 m wide sit outside FAR but are still built, and a contractor may bill them: ask any quote to state the area it charges on.

At published per-sq-ft ranges

Publisher, range, basis, date and exclusionsG+1, 2,616 sq ftG+2, 3,139 sq ft
Aarna Constructions, Greater Noida, basic to premium: Rs 1,650 to 2,400 per sq ft of built-up area, with material (turnkey); updated 7 November 2026
Excludes: land, government fees (map approval, development charges), compound wall and gate, overhead water tank and boring, landscaping and driveway, interiors and architect fees, which the page lists as usually not included; GST extra
Rs 43 to 63 lakh
indicative*
Rs 52 to 75 lakh
indicative*
Bajaj Finance, Noida, economy to premium (standard Rs 1,800 to 2,200): Rs 1,400 to 3,000 per sq ft of built-up area (BUA); no date on the page, read 11 November 2026
Excludes: Noida Authority approval fees, architect fees and soil testing, which the page says are additional to its construction-only rate
Rs 37 to 78 lakh
indicative*
Rs 44 to 94 lakh
indicative*
BrickNBolt, Noida, overall, basic to premium (turnkey Rs 2,500 to 4,500): Rs 1,900 to 4,500 per sq ft; the page's cost-by-size tables are by built-up area; updated 9 June 2026
Excludes: architectural design and approval fees, waterproofing, soil testing, material transportation, boundary wall, staircase railing and facade detailing
Rs 50 to 118 lakh
indicative*
Rs 60 to 141 lakh
indicative*
BrickNBolt, Noida, grey structure only: Rs 1,300 to 2,000 per sq ft; the page's cost-by-size tables are by built-up area; updated 9 June 2026
Excludes: the exclusions above plus electrical, flooring, paint and kitchen: a shell of foundation, RCC frame, brickwork, plaster, staircase, underground tank and basic piping
Rs 34 to 52 lakh
indicative*
Rs 41 to 63 lakh
indicative*

*Indicative: each publisher’s per-sq-ft range multiplied by this plot’s built-up area above, rounded to the nearest lakh. Basis: per sq ft of built-up area, as each publisher states it. Dates: Aarna Constructions, updated 7 November 2026; Bajaj Finance, no date on the page, read 11 November 2026; BrickNBolt, updated 9 June 2026; all three read on their pages on 11 November 2026. The ranges are published for Greater Noida and Noida; none is specific to YEIDA sectors, and Aarna’s rate card says it assumes a 200 to 300 sqm plot built G+2 with stilt parking. Not a quote, not a Vidastu rate, and no statement about what any builder charges you. Every input is in data/construction.json.

What a quote for this plot must itemise

On a 162 sqm plot the completion certificate needs about 60.75 sqm built with a working toilet or bath and a kitchen, and the occupancy list adds a boundary wall, trees, a number plate and finishing (Regulations 24.1(2)(x), 20.1.1 and 20.1.2). The published ranges do not all cover those lines. A quote you can compare names each one, with brand, quantity or allowance:

Line item, and why it is its own lineAarna, 7 Nov 2026Bajaj Finance, read 11 Nov 2026BrickNBolt, 9 Jun 2026
Structure: foundation, RCC frame, slabs
The engineered part, set by the structural drawing. Aarna Constructions puts structure at 40 to 45 per cent of total cost (7 November 2026).
In the rateNot itemised: construction onlyIn the rate, grey and turnkey
Masonry: brick or block walls
Brick or AAC block, and the wall thickness, should be named on the quote.
In the rateNot itemisedIn the rate, grey and turnkey
Plaster, inside and outside
Internal and external plaster, with the number of coats, should be a line of its own.
In the rateNot itemisedIn the rate, grey and turnkey
Flooring
Aarna says the flooring choice alone can swing cost by Rs 100 to 200 per sq ft (7 November 2026); name the tile or stone and its allowance.
In the rate: vitrified tile at basicNot itemisedTurnkey only
Doors and windows
Door type (flush or engineered) and window make and section (aluminium or UPVC) belong in writing.
In the rateNot itemisedTurnkey only
Electrical: wiring, switches, MCB, earthing
Wire and switch brands, the number of points and the earthing should be listed.
In the rateNot itemisedTurnkey only
Plumbing and sanitary
Pipe type, fitting brands and the number of bathrooms; Aarna's basic tier assumes two bathrooms (7 November 2026).
In the rateNot itemisedTurnkey only; grey has basic provision
Kitchen
A platform with tiles is not a modular kitchen; the quote should say which.
Platform and tiles; modular extraNot itemisedTurnkey: modular kitchen setup
Waterproofing: roof and wet areas
Roof and bathroom waterproofing protect the slab and the floor below.
Bathrooms in; roof not statedNot itemisedExcluded
Boundary wall and gate
The occupancy certificate needs a boundary wall (Regulations 20.1.1 and 20.1.2), so a quote without it leaves a certificate item unpriced.
Excluded: compound wall and gateOutside the rate: its own 3 BHK example adds itExcluded
Water tanks and boring
Underground sump, overhead tank and any boring are separate lines.
Excluded: overhead tank and boringNot statedUnderground tank in grey scope; overhead not stated
Septic tank or sewer connection
Whether the plot connects to a sewer line or needs a septic tank decides this line; none of the three ranges states it.
Not stated: internal drainage onlyNot statedNot stated
Soil test
The soil report decides the foundation, and Aarna Constructions prices a pile foundation as an adder on top of its range.
Not stated: pile foundation is an adderAdditionalExcluded
BPMS sanction and architect
Only a Council of Architecture registered, YEIDA-empanelled architect can file on BPMS; the fees and the architect's charge are separate lines.
Excluded: government fees; architect fees usually separateAdditional: approval and architect feesExcluded: design and approval fees
Completion certificate
Only the certificate meets the 31 December 2026 deadline for executed lease deeds; its filing and the occupancy list's items (trees, number plate, boundary wall) belong in scope.
Not stated: government fees excludedNot statedNot stated
GST
Whether the total is before or after GST changes it by the tax; the quote should show GST as its own line.
ExtraNot statedNot stated

Each cell is what that publisher’s page states its per-sq-ft range includes or excludes; “not stated” means the page does not say. The schedule belongs in the quote too: a straightforward G+1 takes typically 5 to 8 months on site (build timeline).

What moves this plot’s cost

Your fixed price comes as one itemised quote after a free site walk. Get my fixed quote · Holding a builder’s quote already? Check it line by line.

Related guides

Building on a 162 sqm YEIDA plot: frequently asked questions

How much can I build on a 162 sqm YEIDA plot?
On Table 1 of the YEIDA Building Regulations 2010, a 162 sqm residential plot (above 120 and up to 200 sqm) takes a maximum ground coverage of 75 per cent and a maximum FAR of 1.80: a footprint of about 121.5 sqm (1,308 sq ft) and about 291.6 sqm (3,139 sq ft) across all floors, with a 15 m height cap. Indicative arithmetic on the band figures; your sanctioned envelope comes from the BPMS scrutiny of your own drawing.
What does it cost to build a house on a 162 sqm YEIDA plot?
A G+1 at 75 per cent coverage has about 243 sqm (2,616 sq ft) of built-up area, inside the FAR area of 291.6 sqm. At published per-sq-ft ranges for built-up area that reads Rs 43 to 63 lakh at Aarna Constructions’ Greater Noida range of Rs 1,650 to 2,400 (updated 7 November 2026; GST, land, government fees, boundary wall and interiors excluded), Rs 37 to 78 lakh at Bajaj Finance’s Noida range of Rs 1,400 to 3,000 (no date on the page, read 11 November 2026; approval, architect and soil-testing fees additional) and Rs 50 to 118 lakh at BrickNBolt’s Noida range of Rs 1,900 to 4,500 (updated 9 June 2026; design and approval fees, waterproofing, soil testing and the boundary wall excluded). All indicative, rounded to the nearest lakh, and none is a Vidastu rate. Your fixed price comes as one itemised quote after a free site walk.
How many floors can I build on a 162 sqm YEIDA plot?
The Regulations set no fixed floor count; height is capped at 15 m and total area by FAR. FAR 1.80 divided by 75 per cent coverage pays for about 2.4 full-footprint floors, so a G+2 gives some area back as a set-back top floor, a terrace or stilt parking. Stilt parking up to 2.4 m to beam bottom is FAR-free on plots of 112 sqm and above (Regulation 24.1(2)), so a stilt ground floor moves the living floors up without spending FAR.
What setbacks apply on a 162 sqm YEIDA plot?
The front setback in this band is 3.0 m. For the side, Table 1 prints no plain side setback or ramp pocket for this band; the side open space follows the sector zonal plan. The minimum rear open space is an envelope pocket of 5.2 m x 2.4 m on the envelope plan. Table 1 itself says specific setbacks follow the zonal plan, so read your sector’s zonal plan and the YEIDA-issued site plan with your architect before a line is drawn.
What is the minimum I must build on a 162 sqm plot for the completion certificate?
At least 40 sqm or 50 per cent of the maximum permissible ground coverage, whichever is more, with a functional toilet or bath and a kitchen (Regulation 24.1(2)(x)). At 75 per cent coverage on 162 sqm that is about 60.75 sqm, indicative only. The occupancy certificate also needs flooring, wiring, plumbing, trees, a number plate, a boundary wall, finishing and a lockable house.
How many dwelling units are allowed on a 162 sqm YEIDA plot?
Up to three dwelling units (the band above 100 and up to 500 sqm), under Regulation 24.1(2) as transcribed on our regulations page. Up to 100 sqm the cap is two units plus a servant quarter; above 100 and up to 500 sqm it is three; above 500 sqm it is four.
Does the 31 December 2026 deadline apply to my 162 sqm plot?
If the plot is residential and your lease deed is executed, yes: YEIDA’s 87th board meeting (7 November 2025) extended the no-charge construction window to 31 December 2026, and the completion certificate, not the filing, is what meets it. After that, scheme terms move an unbuilt plot onto time extensions with escalating charges. Industrial plots run their own 48-month clock.

Talk to the construction desk

Have a 162 sqm YEIDA plot? Get its envelope read for you.

Send your sector, lease-deed date and map status. We read your plot against Table 1 and your zonal plan, tell you where you stand on 31 December 2026, and give one binding, itemised fixed quote after a free site walk.

Call +91 95404 45300

Your number goes to the construction desk, not a call-centre.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Disclaimer: Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026) is the RERA-registered agent desk. Vidastu Developers Pvt. Ltd., the construction entity on this page, is not itself RERA-registered and files and executes YEIDA building plans as a contractor. Coverage, FAR, height, setback and certificate figures are from the YEIDA Building Regulations 2010 as transcribed on this site; the footprint, floor-area and minimum-build figures are our own indicative arithmetic on those band figures, not a sanctioned envelope for any plot. YEIDA has issued amendments and directions since 2010, and setbacks follow the sector zonal plan. Deadline mechanics are per YEIDA scheme terms and the sources cited above. Cost figures are third-party per-sq-ft ranges, attributed and dated where they appear, multiplied by our area arithmetic: indicative, not a quote and not a Vidastu rate. Your allotment letter, lease deed, YEIDA-issued site plan, sector zonal plan and the BPMS portal govern your own plot. General guidance, not legal advice.