How Much Can You Build on a YEIDA Plot? Ground Coverage, FAR and Setbacks by Plot Size
What you can build on a YEIDA residential plot is set by two numbers in the YEIDA byelaws schedule: ground coverage, which caps the footprint, and Floor Area Ratio (FAR), which caps the total floor area across every floor. Both scale with plot size. On the notified table, YEIDA plots up to 300 sqm carry a maximum ground coverage of 75 per cent and a maximum FAR of 1.80 (Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010), and plots above 750 and up to 1,000 sqm take 55 per cent coverage and a FAR of 1.50 (Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010) - indicative band figures, not a sanctioned figure for any specific plot, and the schedule is periodically revised. This page is published by Vidastu, a Greater Noida construction desk building turnkey homes on YEIDA plots across the Yamuna Expressway corridor, with property advisory through sister brand Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026). Figures as stated on this site in September 2026. Vidastu Developers Pvt. Ltd. works these into a sanctionable plan before a design is committed to.
Two published bands, not a per-plot tableFAR runs out before coverage does31 Dec 2026 certificate window
Reviewed by Ravi Shankar Sharma (Director, building in Greater Noida since 2000) & Vidit Kaushik (Director, BITS Pilani ’22)Updated September 2026
Vidastu Build packages, all Vaastu-aligned by design - priced on call after a free site walk · UP-RERA Agent UPRERAAGT000309/01/2026 (Vidastu Advisory)
Ground coverage decides how much of your plot the building may sit on. FAR decides how much total floor area you may build across every floor put together. Almost every owner asks about coverage first, and almost every owner is asking about the wrong number - because on both of the band figures this desk publishes, the FAR runs out before the coverage does. That single fact is why a YEIDA plot rarely gives you three floors at full permitted footprint, and why the honest answer to "how many floors can I build" is a decimal rather than a whole number.
The short answer
Divide the FAR by the coverage fraction and you get the number of full-footprint floors the FAR will pay for. On the band up to 300 sqm (coverage 75 per cent, FAR 1.80) that is 1.8 ÷ 0.75 = 2.4 floors. On the 750 to 1,000 sqm band (coverage 55 per cent, FAR 1.50) it is 1.5 ÷ 0.55 = about 2.7 floors. Neither reaches three. A G+2 on a YEIDA plot therefore means giving area back somewhere - a set-back top floor, a terrace, or footprint surrendered to stilt parking. Indicative arithmetic on published band figures, not a sanctioned envelope.
Everything below is worked from figures already published on this site and from the schedule references it cites, and every derived number is labelled as indicative. This page does not host the YEIDA byelaws schedule, does not publish a per-plot-size FAR table, and does not publish a rear-setback figure. Where a number is not ours to give, the page says so and points at the authority’s own source instead of guessing.
Five numbers decide what fits on a YEIDA plot
Owners tend to think of this as one question. It is five, and they bind in a specific order - which is why two neighbours with identical plot areas can end up with visibly different houses.
1. Ground coverage - the footprint cap
A percentage of plot area. It says how much ground the building may cover, and nothing about floors. On the band figures published here, smaller YEIDA plots up to about 300 sqm typically reach up to about 75%; larger plots around 1,000 sqm typically ease to around 55%. Indicative, and read off the current schedule for your allotment category before design.
2. FAR - the total-area cap
A multiplier on plot area giving the total floor area across all floors combined. About 1.8 on the smaller band, about 1.5 on the larger band, on the figures published here. This is the number that actually decides your house size, and the number most owners never ask for.
3. Setbacks - the shape cap
Mandatory open strips between the building and the plot boundary. For a plot above 200 and up to 300 sqm the notified front setback is 3.25 m, and the side setback is set by the sector's zonal plan rather than by a single figure (Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010). The 4.00 m front setback begins in the 300 to 400 sqm band. Setbacks bite before coverage does on a narrow plot, because they fix the shape of the rectangle you are allowed to draw in.
4. The basement - the area that generally does not count
A basement is permissible up to 2 metres from the adjacent plot boundary, subject to a structural stability certificate issued by a licensed structural engineer, and is generally excluded from FAR calculations when used for parking, utilities or storage. On a large plot that exclusion is worth more than any other decision on this list.
5. The certificate minimum - the floor, not the ceiling
YEIDA’s completion / functional certificate has a minimum standard: at least 40 sqm or 50% of permissible ground coverage, whichever is more, with a functional toilet and kitchen, flooring done, wiring complete and the boundary wall constructed. Because it is written against permissible coverage, this floor rises as your plot gets bigger.
Items 1 to 3 are ceilings. Item 4 is the exemption that quietly moves the ceiling. Item 5 is a floor, and it is the one that catches owners who assumed a token structure would close their obligation. The rest of this page works each of them against plot sizes YEIDA has actually offered.
What plot sizes has YEIDA actually offered, sector by sector?
Before any FAR arithmetic is useful you need to know which size bracket you are in. Below are the plot sizes published on this site’s own sector pages, with the scheme each came from. These are as reported in scheme coverage; confirm your own plot area from your allotment letter, which is the document that governs.
YEIDA sector
Scheme and plot sizes as published
Which published band the size falls in
What this desk publishes as the typical build
Sector 15C
RPS-10/2026 - 973 plots across Sectors 15C, 18 and 24A in the 162-290 sqm range, computerised draw 18 June 2026; reported as four modules of 162, 200, 223 and 290 sqm per scheme coverage of the brochure reported
Entirely inside the “up to about 300 sqm” band
G+1 or G+2 independent home with stilt or surface parking
Sector 16
RPS-07/2023 - 1,184 plots shared across Sectors 16, 17 and 20, sized 60-2,000 sqm. RPS-08/2024 - 361 residual plots shared across Sectors 16, 18, 20 and 22D, sized 120-4,000 sqm. Common Sector 16 plots run 120-300 sqm
Spans both published bands
G+1 or G+2 on the common 120-300 sqm plots
Sector 17
Part of RPS-07/2023, sized 60-2,000 sqm; a typical Sector 17 plot runs 60-200 sqm
The typical sizes sit at the small end of the “up to about 300 sqm” band
G+1 or G+2 with stilt or surface parking
Sector 18
RPS-10/2026 (162-290 sqm, draw 18 June 2026) and the RPS-08/2024 residual scheme (120-4,000 sqm)
New RPS-10 allotments sit inside the smaller band; residual-scheme plots can reach the larger one
G+1 or G+2, usually with a basement and stilt parking
Sector 20
Planned plot sizes are 300, 500, 1000, 2000 and 4000 sqm; older 2009-scheme plots in similar sizes also change hands
300 sqm sits at the top of the smaller band; 1,000 sqm is the size the larger band is published against
Full family home - family floors plus a rental or guest floor, with basement, stilt parking and garden
Sector 22D
Included in the RPS-08/2024 residual scheme, sized 120-4,000 sqm
Spans both published bands
G+1 or G+2, usually with a basement and stilt parking
Sector 24A
RPS-08(A)/2024 - RERA-registered under UPRERAPRJ653132/10/2024, which the UP-RERA register carries under the scheme name RPS08/2024, registered 28 October 2024 (register read 29 July 2026); reported as 451 plots in five sizes: 120, 162, 200, 250 and 260 sqm, on a 90-year lease; also one of the three RPS-10/2026 sectors RERA no.
Entirely inside the “up to about 300 sqm” band
120-200 sqm suits a compact 2-3 BHK within FAR; 200 sqm and above suits a larger 3-4 BHK with a parking area
These are the YEIDA sectors this desk publishes dedicated build pages for; it is not a statement of every sector YEIDA has allotted. Scheme codes, plot counts and size ranges are as reported in scheme coverage and are reproduced here from this site’s sector pages. Verify the RERA registration for any scheme at up-rera.in and your own plot area from your allotment letter.
Which limit runs out first - ground coverage or FAR?
FAR does, on both published bands. The proof is one division. Coverage is expressed as a fraction of plot area; FAR is expressed as a multiple of plot area. Divide one by the other and the plot area cancels out entirely - which means the answer does not depend on how big your plot is, only on which band it sits in.
On the smaller band: 1.8 ÷ 0.75 = 2.4. On the larger band: 1.5 ÷ 0.55 = about 2.7. Both are short of three. Both are also short of what most owners picture when they hear "G+2".
There is a second, less obvious reading here. The larger band has a lower headline coverage and a lower headline FAR - and yet it buys more full-footprint floors, 2.7 against 2.4. The two numbers fell by different proportions. So on the published figures, the owner of a larger YEIDA plot loses less of the third floor than the owner of a small one, even though both headline percentages look worse on paper. That is the kind of result you only get by doing the division rather than reading the percentages.
Everything in the table below is indicative arithmetic applied to the two band figures published on this site as of September 2026. It is not a sanctioned figure, not a quotation, and not a statement of what any specific plot will be permitted. Your sanctioned ceiling comes off the current YEIDA byelaws schedule for your allotment category, checked against your plot’s real dimensions at design stage. Areas are converted at 1 sqm = 10.7639 sq ft and rounded.
Plot size
Footprint ceiling
Total floor-area ceiling, all floors
Full-footprint floors the FAR pays for
120 sqm
~90 sqm (~969 sq ft) at 75%
~216 sqm (~2,325 sq ft) at FAR 1.8
2.4
162 sqm
~121.5 sqm (~1,308 sq ft) at 75%
~291.6 sqm (~3,139 sq ft) at FAR 1.8
2.4
200 sqm
~150 sqm (~1,615 sq ft) at 75%
~360 sqm (~3,875 sq ft) at FAR 1.8
2.4
250 sqm
~187.5 sqm (~2,018 sq ft) at 75%
~450 sqm (~4,844 sq ft) at FAR 1.8
2.4
260 sqm
~195 sqm (~2,099 sq ft) at 75%
~468 sqm (~5,038 sq ft) at FAR 1.8
2.4
290 sqm
~217.5 sqm (~2,341 sq ft) at 75%
~522 sqm (~5,619 sq ft) at FAR 1.8
2.4
300 sqm
~225 sqm (~2,422 sq ft) at 75%
~540 sqm (~5,813 sq ft) at FAR 1.8
2.4
1,000 sqm
~550 sqm (~5,920 sq ft) at 55%
~1,500 sqm (~16,146 sq ft) at FAR 1.5
~2.7
Read the last column as design instruction rather than as a rule. At 2.4 floors on a 200 sqm plot you have roughly 360 sqm of floor area to place. Take the full 150 sqm footprint on the ground and first floors and you have spent 300 sqm, leaving about 60 sqm for the second floor - enough for a compact top-floor suite opening onto a terrace, not a third full floor. Give the ground floor to stilt parking and the maths shifts again. Which of those you want is a conversation with an architect, and it happens before drawings, not after.
Sizes between the two published bands are the honest gap on this page. The schedule is banded and revised periodically, and this site publishes the two anchor bands rather than a row for every category, so a 500 sqm plot sits between the two figures shown here and this page will not guess where. That number comes off the current schedule.
What the setbacks take before FAR is even counted
Coverage tells you how much area you may cover. Setbacks tell you where, and on a narrow plot they are the constraint that actually binds. A 200 sqm plot at 75% coverage is allowed a 150 sqm footprint - but if the setbacks leave a buildable rectangle smaller than 150 sqm, the rectangle wins and the coverage percentage is academic.
For a plot above 200 and up to 300 sqm the notified front setback is 3.25 m, and the side setback is set by the sector's zonal plan rather than by a single figure (Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010). The 4.00 m front setback begins in the 300 to 400 sqm band, and setbacks rise with every band above it. Two further allowances matter at design stage: open vehicle ramps are permitted in the side setback only, and canopy projections of up to 4.5 m by 2.4 m are permitted in front or side setbacks where the front setback is 4.5 m or more. The ramp rule in particular decides where a basement entry can physically go, which is why basements and setbacks are one conversation, not two.
What this page does not hold, plainly: it does not publish a rear-setback figure for YEIDA residential plots, and it does not publish the frontage and depth of any allotted plot. Without both, no honest page can compute your buildable rectangle. Your frontage and depth are on the site plan YEIDA issues with your allotment; the rear setback for your category is in the current byelaws schedule. Bring both to your architect and the rectangle is a five-minute calculation. Anyone who quotes you a buildable area without asking for either has not done it.
The basement is the area that generally does not count against FAR
This is the single largest lever on a YEIDA plot, and it is the one owners most often discover late. A basement is generally excluded from FAR calculations when used for parking, utilities or storage. It is permissible up to 2 metres from the adjacent plot boundary, subject to a structural stability certificate issued by a licensed structural engineer. Soil borings and a waterproofing strategy are mandatory for any basement build.
Work that against the arithmetic above. On a 1,000 sqm plot at the published 55% figure, the footprint ceiling is around 550 sqm - and a basement can repeat much of that below ground without spending a single unit of the 1,500 sqm FAR budget. On a 200 sqm plot the same principle is worth around 150 sqm of parking, services and storage that would otherwise have eaten into a floor you wanted for bedrooms. In both cases the exclusion is worth more than any argument about a coverage percentage.
Two cautions that belong in the same paragraph as the benefit. The exclusion as published is use-conditional - parking, utilities, storage. If you intend the basement as habitable space, treat the FAR position as an open question for your architect to settle against the current schedule rather than an assumption to design around. And the extra foundation, structural design and waterproofing are real costs; a basement is a strong move on a large plot and a considered one on a small plot. Our Yamuna Expressway construction cost guide sets out what drives the number, and why we price every build on call after a free site walk rather than off a public rate card.
The floor, not the ceiling: what the completion certificate needs you to build
Every section above answers "how much may I build". This one answers the question that actually has a deadline attached: how much must I build. YEIDA’s minimum standard for the completion / functional certificate is at least 40 sqm or 50% of permissible ground coverage, whichever is more, with a functional toilet and kitchen, flooring done, wiring complete and the boundary wall constructed. An empty plinth or a bare structure does not count - the certificate is issued against a habitable house.
Notice what the test is written against: permissible ground coverage, not a fixed area. That means the floor scales with your plot. Worked on the published band figures, indicative only:
Plot size
Permissible coverage on the published band
50% of that
Minimum that applies (the higher of 40 sqm and 50%)
120 sqm
~90 sqm at 75%
~45 sqm
~45 sqm (~484 sq ft)
162 sqm
~121.5 sqm at 75%
~60.75 sqm
~60.75 sqm (~654 sq ft)
200 sqm
~150 sqm at 75%
~75 sqm
~75 sqm (~807 sq ft)
300 sqm
~225 sqm at 75%
~112.5 sqm
~112.5 sqm (~1,211 sq ft)
1,000 sqm
~550 sqm at 55%
~275 sqm
~275 sqm (~2,960 sq ft)
The 40 sqm figure in the rule only becomes the operative number on genuinely small plots. On the published 75% coverage figure, 50% of permissible coverage falls below 40 sqm only where the plot is under roughly 107 sqm - so for every plot size in the sector table above, the percentage test is the one that binds, not the 40 sqm one. An owner of a 1,000 sqm plot planning a token build to close an obligation is, on these figures, looking at something closer to 275 sqm of covered area with a working kitchen, a working toilet, floors, wiring and a boundary wall.
That is the number worth carrying into your build planning, because it converts a compliance question into a construction programme. The window itself is covered in full on a separate page rather than re-argued here.
…
days left · free construction window closes 31 Dec 2026
YEIDA’s 87th board meeting (7 November 2025) extended the no-charge construction window to 31 December 2026 for allottees who had executed lease deeds for residential plots (Times of India, 8 November 2025). As of that meeting, around 1,100 functional certificates had been issued against more than 10,000 executed lease deeds. Your own obligation runs from your possession or lease-deed date under your scheme terms - confirm it on your allotment letter.
Nothing here should be taken on our word, and none of it replaces a drawing. Five checks, all runnable from your own documents and the authority’s own portals:
Open the current YEIDA building byelaws and find the residential schedule for your plot category. The authority publishes it on its own site at the YEIDA building byelaws page. Vidastu does not host or republish that schedule, and it is periodically revised - the authority’s copy is the current one, this page is not.
Read your plot area, sector and scheme code off your allotment letter. Scheme coverage and property portals get sizes wrong; your letter does not. The YEIDA-issued site plan that comes with it carries the frontage and depth this page cannot supply.
Log in to the BPMS portal with your PIMS / CCP credentials.bpms.yamunaexpresswayauthority.com has been the mandatory channel for map sanction since 1 August 2024, and it is where your plot’s own record lives. Payments made outside BPMS are not accepted for sanctioning.
Have a Council of Architecture registered, YEIDA-empanelled architect run the calculation against your actual dimensions. The Smart-DCR engine inside BPMS checks drawings against the byelaw limits at pre-check and flags anything outside them immediately, so the sanctioned envelope is whatever that engine accepts - not a figure on any website, ours included. Under the YEIDA Building Regulations, if the authority raises no refusal within 60 days of a duly certified application the plan stands sanctioned, and the building permit remains valid for 5 years (Regulations 13.0 and 15.0, byelaws on the BPMS portal). The BPMS map sanction guide sets out that process.
Verify who is telling you this. Vidastu Advisory’s UP-RERA agent registration is UPRERAAGT000309/01/2026 and is searchable at up-rera.in. Run the same check on anyone else quoting you a buildable area.
Filing for a factory rather than a house? Industrial plots use their own FAR and coverage table (byelaws regulation 24.3) and sit inside a longer compliance ladder - fire NOC, UPPCB, factory licence, functional certificate. Nothing on this page applies to them; see industrial construction on YEIDA plots instead.
Where each figure on this page comes from
Stated plainly, so you can weigh each number for yourself rather than treating the page as one block of authority:
The coverage, FAR, setback and basement figures
Band figures as published on this site’s YEIDA building plan approval page, which cites the authority’s own byelaws page as the source to confirm against. Described there as indicative for common plot categories and subject to periodic revision. Reproduced here unchanged.
The arithmetic in the three tables
Ours, worked from those band figures and labelled indicative wherever it appears. Multiplication and division only - no additional assumption is introduced, and no figure in these tables is a sanctioned or quoted number.
The sector plot sizes and scheme codes
From this site’s dedicated sector pages for 15C, 16, 17, 18, 20, 22D and 24A, which attribute them to scheme coverage. Your allotment letter governs over all of it.
The certificate minimum and the construction window
From this site’s YEIDA construction deadline page, which sources the extension to YEIDA’s 87th board meeting of 7 November 2025 as reported by the Times of India on 8 November 2025, and the certificate-versus-lease-deed counts to the same board meeting.
What is deliberately absent
A per-plot-size FAR table, a rear-setback figure, plot frontage and depth dimensions, a maximum-height figure for YEIDA residential plots, and any downloadable copy of the byelaws schedule. This desk does not hold current, sourced versions of those, so it does not publish them. Ask us for one and the honest answer is a pointer to the authority’s page, not a number.
Vidastu Developers Pvt. Ltd. is a construction firm (CIN U68200UP2023PTC192378) building turnkey homes on owners’ plots across the Yamuna Expressway corridor and Greater Noida, whose Director Ravi Shankar Sharma has built in Greater Noida since 2000 with delivery led by Vidit Kaushik (BITS Pilani). Property advisory sits with sister brand Vidastu Advisory, a UP-RERA-registered agent desk rated 4.8 across 58 Google reviews as on 6 October 2026, as shown on Google in September 2026. Send your plot size and sector and the architect’s answer comes back on one call.
What ground coverage and FAR apply to a YEIDA residential plot?
Ground coverage and FAR are set by the YEIDA byelaws schedule and both scale with plot size. On the notified table, plots up to 300 sqm carry a maximum ground coverage of 75 per cent and a maximum FAR of 1.80, and plots above 750 and up to 1,000 sqm take 55 per cent coverage and a FAR of 1.50 (Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010). These are indicative band figures, not a sanctioned figure for your plot. The schedule is periodically revised, so the exact number for your allotment category is read off the current byelaws before design begins.
Which limit runs out first on a YEIDA plot - ground coverage or FAR?
FAR runs out first. Divide the FAR by the coverage fraction and you get the number of full-footprint floors the FAR pays for. On the smaller-plot band this desk publishes, 1.8 divided by 0.75 is 2.4 floors. On the larger-plot band, 1.5 divided by 0.55 is about 2.7 floors. Either way you do not get three floors at full permitted footprint, so a G+2 on a YEIDA plot means giving area back somewhere - a set-back top floor, a terrace, or footprint surrendered to stilt parking. This is indicative arithmetic on published band figures, not a sanctioned envelope.
How much built-up area does a 200 sqm YEIDA plot allow?
On the notified table for plots up to 300 sqm, a maximum ground coverage of 75 per cent and a maximum FAR of 1.80 (Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010), a 200 sqm plot works out to a footprint ceiling near 150 sqm (about 1,615 sq ft) and a total floor-area ceiling near 360 sqm (about 3,875 sq ft) across all floors, indicative only. Your sanctioned figure comes from the current YEIDA byelaws schedule for your allotment category, checked against your plot’s actual frontage and depth from the YEIDA-issued site plan.
What setbacks does YEIDA require on a residential plot?
Setbacks scale with plot size. For a plot above 200 and up to 300 sqm the notified front setback is 3.25 m, and the side setback is set by the sector's zonal plan rather than by a single figure (Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010). The 4.00 m front setback begins in the 300 to 400 sqm band. Open vehicle ramps are permitted in the side setback only. Canopy projections of up to 4.5 m by 2.4 m are permitted in front or side setbacks where the front setback is 4.5 m or more. This page does not publish a rear-setback figure or your plot’s frontage and depth, so it cannot compute your buildable rectangle - those come from the byelaws schedule and the YEIDA-issued site plan.
Does a basement count against FAR on a YEIDA plot?
A basement is generally excluded from FAR calculations when used for parking, utilities or storage, which makes it the largest single lever on a bigger plot. A basement is permissible up to 2 metres from the adjacent plot boundary, subject to a structural stability certificate issued by a licensed structural engineer, and soil borings plus a waterproofing strategy are mandatory for any basement build. If the basement is designed as habitable space, treat the FAR position as an open question for your architect to settle against the current schedule.
What is the minimum I must build to get a YEIDA completion certificate?
YEIDA’s minimum standard for the completion / functional certificate is at least 40 sqm or 50% of permissible ground coverage, whichever is more, with a functional toilet and kitchen, flooring done, wiring complete and the boundary wall constructed. An empty plinth or bare structure does not count. Because the test is written against permissible coverage, the floor rises with plot size: on the published 75% figure a 200 sqm plot needs about 75 sqm built, and on the published 55% figure a 1,000 sqm plot works out near 275 sqm. Indicative arithmetic on published band figures - confirm your own position on the BPMS portal. See the deadline page →
Where do I check the official FAR and ground coverage for my own plot?
The current YEIDA building byelaws page on the authority’s own site carries the residential schedule, and it is periodically revised. Vidastu does not host or republish that schedule. Read your plot area, sector and scheme code off your allotment letter, take frontage and depth off the YEIDA-issued site plan, and have a Council of Architecture registered, YEIDA-empanelled architect run the calculation. The Smart-DCR engine inside the BPMS portal flags anything outside the byelaw limits at pre-check, so the sanctioned envelope is the one that engine accepts.
Send your plot size. Get the arithmetic worked for your plot, not a brochure.
Plot area, sector and scheme code is all we need to start. Our empanelled architect reads your category off the current byelaws schedule, checks it against your site plan, and tells you the floors, the footprint and what the basement can hold - before any drawing is paid for.
Delivery lead calls back within 24 hours - not a call centre.
Got it. The delivery lead will call you within 24 hours.
Opening WhatsApp as confirmation…
Disclaimer: This page is general guidance, not legal advice, and not a sanctioned building envelope. Every coverage, FAR, setback and basement figure here is reproduced from figures published elsewhere on this site as indicative band figures for common plot categories; the YEIDA byelaws schedule is periodically revised and the authority’s own building byelaws page is the version that governs. All footprint, floor-area and certificate-minimum figures in the tables are our own indicative arithmetic on those band figures as stated in September 2026, converted at 1 sqm = 10.7639 sq ft, and are not sanctioned figures, quotations or a statement of what any specific plot will be permitted. Plot sizes, plot counts and scheme codes are as reported in scheme coverage and reproduced from this site’s sector pages; your allotment letter and the YEIDA-issued site plan govern. Construction services are provided by Vidastu Developers Pvt. Ltd. (CIN U68200UP2023PTC192378, GST registered), a construction company that is not itself UP-RERA registered; construction contracts do not require RERA registration. Vidastu Advisory is a UP-RERA-registered agent (UPRERAAGT000309/01/2026) and is a channel partner and independent research desk for property advisory only - not a developer, not a government authority, and not the official website of YEIDA or of any developer. Verify the registration at up-rera.in.