Yamuna Expressway Live Index: Every Project, Verified

Also on our desk: Eldeco 7 Peaks Residences: desk review, floor plans and the register record.

One table, every status named plainly

This index tracks eighteen named projects: fourteen in YEIDA Sector 22D, Yamuna Expressway, two in Sector 22A and one in Sector 19, plus one adjacent-market comparison row in Sector 150. Three rows are directly bookable with no EOI step: Eldeco Echoes of Eden (Caelum tower), ACE Terra and ACE Arte. Gaur Chrysalis Phase 1 is reported sold out (founder-confirmed, 10 July 2026). Gaur Alaris (formerly Gaur Plume / “Chrysalis 2.0”) is RERA-registered, UPRERAPRJ950965/07/2026, and sold out, per the desk (11 November 2026). ACE Arte (formerly ACE Parkway 2.0, Sector 150, an adjacent Noida Authority market, not YEIDA) is now RERA-registered, UPRERAPRJ528653/07/2026. ATS Allure is largely possession-complete, with a documented 2023 delay order worth reading before you buy. Gaurs Studio Bento in Sector 19 is EOI-only. The rest (ACE Edit, ACE YXP, Ballads of Bliss, Whispers of Wonder, Purvanchal Sunbliss, Greenbay The Monarque, County, Orion and Arihant Seasons 22D, plus ACE Verde and ACE Hive in Sector 22A) carry either a real RERA gap or a status we could not independently verify, named as such rather than smoothed over. Every row below regenerates from the same open data file this page links to.

18Named projects tracked, one live index
3Directly bookable today, no EOI step
1Pre-RERA: Expression of Interest only
2Sold out per the desk (dated in each row): no fresh units
12Verify directly before trusting any figure

Data last verified 2026-07-30 · 18 named projects tracked across YEIDA Sector 22D and the Sector 150 adjacent market · regenerated from data/corridor.json (schema v2.0).

The live table: construction status, booking status and RERA for every tracked project

This one table answers the questions buyers actually type: which Yamuna Expressway projects are ready to move, which are bookable today, which are EOI-only, which the desk records as sold out, and each project's RERA registration alongside its current construction-status posture. Every row below is generated, not hand-typed; it comes straight from data/corridor.json (schema v2.0), the same open file our AI-citation and research pages cite. Filter and sort controls appear below once the page’s script runs; without JavaScript, or for any crawler, the table below is already the complete, current list; nothing is hidden behind an interaction.

Counted from data/corridor.json, the 18 tracked rows break down as: three bookable now (Eldeco Echoes of Eden, ACE Terra and ACE Arte); two sold out, per the desk (Gaur Chrysalis Phase 1, founder-confirmed 10 July 2026, and Gaur Alaris, 11 November 2026); one ready to move (ATS Allure); eleven unverified; and one EOI-only, the Sector 19 studio project Gaur Bento, which has no RERA number surfaced in its registration column; that gap is the current, verified state of the record, not a lookup we skipped.

Project Sector Status RERA Indicative price Possession Verified Detail
Gaur Chrysalis (Phase 1) 22D · YEIDA Sold out UPRERAPRJ622344/11/2025 Confirmed ₹1.98 to 2.64 Cr band post-revision (sold out, founder-confirmed 10 July 2026) 2030-10 (per RERA filing, reported) verified 2026-07-11 Full review →
Gaur Plume / "Chrysalis 2.0" 22D · YEIDA Sold out (desk, 11 Nov 2026) UPRERAPRJ950965/07/2026 Confirmed 3 BHK; Phase 1 fully booked on 1 September 2026 2031-06-09 (Phase 1, per RERA registration) verified 2026-07-29 Gaur Alaris full review →
Eldeco Echoes of Eden (EOE) 22D · YEIDA Bookable now UPRERAPRJ125342/02/2026 Confirmed on the dated cost sheet 2031-01 verified 2026-07-11 Full review →
ACE Terra 22D · YEIDA Bookable now UPRERAPRJ683816/04/2024 Confirmed No dated price published; portal figures conflict, and the ranges as read on 10 July 2026 are in the ACE Terra review 2028-12 verified 2026-07-11 Full review →
ACE Edit 22D · YEIDA Unverified UPRERAPRJ467686/09/2025 Confirmed from ₹85.76 lakh Not stated verified 2026-08-05 Verify at up-rera.in
ACE YXP 22D · YEIDA Unverified UPRERAPRJ397607 Confirmed from ₹1.50 Cr Not stated verified 2026-08-05 Verify at up-rera.in
Whispers of Wonder 22D · YEIDA Unverified UPRERAPRJ752382/09/2025 Reported No dated price published; Vidastu is not the appointed channel 2030-07 (reported target, per RERA filing) verified 2026-07-11 Verify at up-rera.in
Ballads of Bliss 22D · YEIDA Unverified UPRERAPRJ921261/05/2025 Reported No dated price published; ask the developer's sales channel for the current cost sheet; Vidastu is not the appointed channel 2030-04 (reported target, per RERA filing, earliest of the three Eldeco Sector 22D projects) verified 2026-07-11 Verify at up-rera.in
ATS Allure 22D · YEIDA Ready to move UPRERAPRJ918 Confirmed Sources disagree materially: cited figures range ₹1.15 Cr to ₹1.53 Cr, possibly different unit types or resale vs primary listings Largely possession-complete per portals; a Feb 2023 UP-RERA order found delivery still incomplete for 19 complainants as of that date and ordered possession within 60 days plus delay interest at MCLR+1%; full compliance with that deadline not independently confirmed verified 2026-07-11 Full review →
Purvanchal Sunbliss 22D · YEIDA Unverified UPRERAPRJ746863/04/2025 Confirmed No dated price published; the developer's cost sheet governs 2030-01-29 (declared completion, confirmed directly on up-rera.in) verified 2026-07-11 Full review →
Greenbay The Monarque 22D · YEIDA Unverified UPRERAPRJ710489/10/2025 Confirmed Not published 2029-09-18 (declared completion, confirmed; 48-month period from proposed start 01-10-2025) verified 2026-07-11 Full review →
County (Yamuna Expressway) 22D · YEIDA Unverified No RERA number surfaced Gap Not published Not stated verified 2026-07-11 Full review →
Orion (Sector 22D) 22D · YEIDA Unverified No RERA number surfaced Gap "On request": no public figure Not stated verified 2026-07-11 Full review →
Arihant Seasons 22D 22D · YEIDA Unverified UPRERAPRJ974543/02/2026 Reported No dated price published; the developer's cost sheet governs Not stated verified 2026-07-11 Full review →
ACE Verde 22A · YEIDA Unverified UPRERAPRJ913692/03/2025 Confirmed from ₹2 Cr 2029-04 verified 2026-08-05 Verify at up-rera.in
ACE Hive 22A · YEIDA Unverified UPRERAPRJ939595/03/2025 Confirmed from ₹92 lakh Not stated verified 2026-08-05 Verify at up-rera.in
ACE Parkway 2.0 150 · Noida Authority (adjacent market) Bookable now UPRERAPRJ528653/07/2026 Confirmed BSP ₹21,995/sq.ft* super area, per the price list dated 21 August 2026; basic price, ACE's cost sheet governs. The worked total for a chosen size comes on the dated cost sheet. 2031-02-15 (per RERA registration) verified 2026-07-30 Full review →
Gaurs Studio Bento 19 · YEIDA EOI only (pre-RERA) No RERA number surfaced Gap No dated price published (studio, 650 to 675 sq.ft); the developer's cost sheet governs. Confirm the current cost sheet before quoting a buyer. Not stated verified 2026-07-11 Full review →

Status: Bookable now directly bookable today, no EOI step · EOI only pre-RERA, refundable Expression of Interest only, no booking language · Sold out reported/founder-confirmed fully sold, resale only · Ready to move largely possession-complete per portal/RERA status · Unverified RERA may be confirmed but current price/availability/booking was not independently confirmed by Vidastu. RERA confidence tags (Confirmed / Reported / Gap) are a separate dimension; a status can be Unverified even where the RERA number itself is Confirmed. Every RERA number should be checked directly at up-rera.in before any payment.

Methodology: how this index is built, and how to verify any row yourself

The corridor-level analysis behind this index (why booking status alone doesn’t set value, and which clocks actually do) is in The Jewar Effect, our honest map of the corridor’s next five years.

This page and its underlying data file share one status vocabulary. BOOKABLE means directly bookable today through the project’s own official channel: no EOI step, no pre-RERA posture. EOI_ONLY means pre-RERA or pre-launch: only a refundable Expression of Interest is being collected, and this page never uses booking language for those rows. SOLD_OUT means reported or founder-confirmed as fully sold, with no fresh developer availability. RTM (ready to move) means largely possession-complete per portal listings and/or the RERA filing itself. UNVERIFIED means the RERA registration may well be confirmed, but current price, availability or booking mechanics were not independently confirmed by Vidastu, most often because Vidastu is not that project’s appointed sales channel. Status is deliberately a separate axis from RERA confidence: a project can carry a Confirmed RERA number and still show Unverified status.

Every figure on this page traces back to data/corridor.json, a free-to-reuse, source-tagged data file; the same file’s own disclaimers apply here: prices, unit sizes and possession dates are asking/developer-published figures, not verified transactions, and change frequently. Before paying anything toward any project on this page, search its RERA number directly at up-rera.in and ask for the current, RERA-filed cost sheet; never rely on a portal listing, a broker’s claim, or this page’s own price column as a substitute for that step. For every named project’s RERA number gathered on one page (number, confidence tag and a direct up-rera.in link, per project), see the RERA Number Lookup. And for the wider investment picture behind this corridor’s registration activity, see UP-RERA’s H1 2026 Report, Broken Down: Noida and Ghaziabad took 61% of the state’s H1 2026 real-estate investment, per UP-RERA via the Times of India. For the filing itself rather than a column in a table, our desk publishes each Gautam Buddh Nagar registration as its own page on UP RERA Tracker.

And before you weigh any price here against another, see what it actually costs once the statutory charges are added: the All-In Cost Calculator turns a sticker price into an estimated all-in figure: stamp duty, GST and registration, each rate dated and sourced.

Why some rows say "Unverified" instead of a number County and Orion carry a genuine RERA gap: no registration number surfaced anywhere in our source set. Ballads of Bliss, Whispers of Wonder, Purvanchal Sunbliss, Greenbay The Monarque and Arihant Seasons 22D do have a reported RERA number, but Vidastu is not the appointed sales channel for any of them, so their current price and booking mechanics are named as Unverified rather than assumed. We could have rounded any of these off with a plausible-sounding figure. We didn’t: a wrong number dressed up as confident advice is worse than an honest "verify this yourself."

FAQ

What does "live index" mean, and how is it kept current?
This table is regenerated directly from Vidastu’s open data file, data/corridor.json (schema v2.0); every row’s status, RERA number, price, possession and verified-date comes from that file, not typed independently onto this page. A separate freshness monitor checks the underlying data weekly and flags this page’s own "Live" claim if the data goes stale (the JSON file’s updatedAt is more than 14 days old, or any single row’s verified-date is more than 30 days old); see the methodology section above for the exact rule.
Is Gaur Chrysalis Phase 1 really sold out?
Yes: sold out per the desk, founder-confirmed on 10 July 2026, with no fresh availability (RERA UPRERAPRJ622344/11/2025, granted 4 Nov 2025). Any listing offering to "book" Phase 1 today is reselling, not a primary purchase from the developer; portals that still show it as bookable are stale. The reported exit BSP was ₹11,000/sq.ft*, revised from a launch BSP of ₹8,000/sq.ft* with effect from 22 December 2025 (*basic prices; area basis, super or carpet, not confirmed; Gaurs’ cost sheet governs).
What’s the difference between Gaur Chrysalis Phase 1 and Gaur Alaris (formerly Gaur Plume)?
Two separate projects by the same developer group. Gaur Chrysalis Phase 1 is the already-registered, reported-sold-out original (RERA UPRERAPRJ622344/11/2025). Gaur Alaris, formerly marketed as Gaur Plume / "Chrysalis 2.0", is a distinct, later phase, now RERA-registered under UPRERAPRJ950965/07/2026 (July 2026), BSP of record ₹12,000/sq.ft* super area as on 7 September 2026 (basic price; Gaurs' cost sheet governs), its Phase 1 bookings having closed on 1 September 2026 at ₹9,000/sq.ft* super area (basic price; Gaurs' cost sheet governs). Neither project’s registration covers the other; never accept Phase 1’s RERA number as cover for a Gaur Alaris booking.
Is Eldeco Echoes of Eden still bookable?
Yes, for the Caelum tower only; Haven and Elysian are fully booked, and the 2 BHK configuration is sold out project-wide, per the desk (July 2026). Current BSP is ₹11,000/sq.ft* super area, 8 October 2026 (Caelum; basic price, Eldeco's cost sheet governs), direct booking with no separate EOI step, RERA UPRERAPRJ125342/02/2026, declared completion January 2031.
Are Ballads of Bliss and Whispers of Wonder the same project as Echoes of Eden?
No. All three are separate, independently RERA-registered Eldeco Group projects on adjacent Sector 22D plots. Echoes of Eden is UPRERAPRJ125342/02/2026 (the one Vidastu represents); Ballads of Bliss is UPRERAPRJ921261/05/2025; Whispers of Wonder is UPRERAPRJ752382/09/2025. Vidastu is not the appointed sales channel for Ballads of Bliss or Whispers of Wonder, so both carry an Unverified status here; confirm current price and booking mechanics directly with their own sales channel.
Is ACE Arte (formerly ACE Parkway 2.0) part of the YEIDA / Yamuna Expressway corridor?
No. It’s included here only as an explicitly labelled adjacent-market comparison row. ACE Arte (formerly ACE Parkway 2.0) sits in Sector 150 on the Noida Expressway, under Noida Authority, not YEIDA, and is not on the Yamuna Expressway corridor covered by the other rows. It is now RERA-registered, UPRERAPRJ528653/07/2026 (registered July 2026); BSP ₹21,995/sq.ft* super area, per the price list dated 21 August 2026; basic price, ACE's cost sheet governs.
What does "Unverified" mean if a project already has a RERA number?
Status and RERA confidence are two different things on this page. A project can have a confirmed RERA registration and still show "Unverified" status if Vidastu is not its appointed sales channel and its current price, availability or booking mechanics were not independently confirmed by us; that’s the case for Ballads of Bliss, Whispers of Wonder, Purvanchal Sunbliss, Greenbay The Monarque and Arihant Seasons 22D here. Always verify directly with that project’s own sales desk, and always check the RERA number itself at up-rera.in.
Sources cited above
  1. Vidastu: corridor.json, raw source data behind this index, free to reuse with attribution (schema v2.0)
  2. Vidastu, The 5 Money-Safety Checks: every named project on this index scored against RERA portal lookup, possession holding, price sourced, EOI-stage escrow and confidence tag
  3. Vidastu, Sector 22D, Yamuna Expressway: All Projects Compared (2026), companion editorial matrix
  4. Vidastu: Eldeco Echoes of Eden review
  5. Vidastu: Gaur Alaris ("Chrysalis 2.0") review
  6. Vidastu, ACE Terra, Yamuna Expressway: Honest Review (2026)
  7. Vidastu, ATS Allure, Yamuna Expressway: Honest Review (2026)
  8. Vidastu: ACE Parkway 2.0 & ACE Group Noida, Advisor’s Guide
  9. Vidastu: UP-RERA’s H1 2026 Report, Broken Down; every district figure, sourced to the Times of India
  10. UP RERA: official project registration search
Vidit Kaushik, Director, Vidastu Developers Pvt. Ltd.

Vidit Kaushik

Civil Engineering, BITS Pilani · UP-RERA Agent UPRERAAGT000309/01/2026 · Director, Vidastu Developers Pvt. Ltd.

Want the live cost sheet for any row above?

Tell our advisory desk which project you’re tracking; we’ll pull the current RERA filing and cost sheet before you visit any sales gallery.

Disclaimer: This is independent research by Vidastu Developers Pvt. Ltd. / Vidastu Advisory (sister brand, UP-RERA-registered agent UPRERAAGT000309/01/2026), an authorised channel partner, not the developer of any project named above. Status reflects Vidastu’s verification tier, described in the methodology section above, not a guarantee of any project’s actual availability. "Reported" means one or more named sources, not independent confirmation by us against the live RERA filing; "Gap" means no verifiable figure was found, not that nothing exists; "Confirmed" means two or more independent sources agree, or the developer’s own official site states it consistently. This page states no assured returns and does not solicit bookings for any pre-RERA project; verify every RERA registration directly at up-rera.in and every price against the live, RERA-filed cost sheet before paying anything.