Purvanchal Sunbliss snapshot: what's verifiable today
| RERA / Promoter | UPRERAPRJ746863/04/2025, registered 08-04-2025, promoter Purvanchal Projects Private Limited Confirmed: up-rera.in project summary, checked 11 Jul 2026 |
| Location | Plot GH-1A/1, Sector 22D, Yamuna Expressway Industrial Development Authority (YEIDA), Gautam Buddha Nagar Confirmed: up-rera.in |
| Declared completion | 29-01-2030 per RERA filing Confirmed: up-rera.in |
| Scale | ~10.5 acres, 7 towers × 25 floors, 1,112 units, consistent across squareyards.com, 99acres.com and mores.in Reported |
| Configurations (portals) | Studio 725 sq.ft.; 3 BHK 1,720 to 2,395 sq.ft. (portals disagree on the exact upper bound); 4 BHK 3,695 sq.ft., reads as super/saleable area Reported |
| Configurations (marketing site) | 1 BHK carpet 366 sq.ft.; 3 BHK carpet 1,054 / 1,241 / 1,485 sq.ft. (three variants); 4 BHK carpet 2,250 sq.ft., materially smaller than the portal cluster, unreconciled Gap |
| Price (portal-reported) | Overall ~₹10,000/sq.ft.* (*portal estimate as read on 11 Jul 2026; reads as a super-area basis; the developer’s cost sheet governs); 4 BHK “starting ₹3.6 Cr*” per the project-branded marketing site Reported, wide spread |
| Amenities | Clubhouse with spa, indoor games, party halls; three-tier swimming pools; gym; tennis/basketball/badminton courts; jogging & cycling tracks; family & kids zones Reported |
| Construction method | Reported use of Mivan formwork, marketed as “100% earthquake-resistant” Reported |
| Brand vs. RERA filing | Marketed as “Purvanchal Sunbliss”; RERA filing names the project “Purvanchal Sunbliss Plot No. GH-1A/1 Sector 22D YEIDA” Confirmed: up-rera.in |
| Developer group | Purvanchal Group / Purvanchal Projects Private Limited; founding cited as ~1994 by one industry profile, “30+ years” by another; total delivered-project/unit counts conflict materially across sources (50 projects/3,500+ flats vs. 10,000+ units) Gap, unreconciled |
Figures sourced inline below and dated to this review's verification pass (11 Jul 2026). This is independent research, not a sales listing for Purvanchal Sunbliss; Vidastu has no channel-partnership with Purvanchal Group or Purvanchal Projects Private Limited and does not sell units in this project; our sales desk handles enquiries as a separate, clearly-labelled service.
What Purvanchal Sunbliss actually is
Purvanchal Sunbliss occupies Plot GH-1A/1, Sector 22D, on the Yamuna Expressway, the same YEIDA-sanctioned pocket that hosts Gaur Chrysalis, Eldeco Echoes of Eden, ACE Terra and eight other named projects in our full comparison matrix. Its UP-RERA registration, UPRERAPRJ746863/04/2025, was registered 8 April 2025 by promoter Purvanchal Projects Private Limited, with a declared completion date of 29 January 2030 Confirmed (up-rera.in, accessed 11 Jul 2026). The filing itself names the project “Purvanchal Sunbliss Plot No. GH-1A/1 Sector 22D YEIDA”, a formal registered name that lines up cleanly with the marketing name, unlike some corridor projects where the two diverge.
Portal listings (cross-checked across squareyards.com, 99acres.com and mores.in) describe a scheme of 7 towers rising to 25 floors across roughly 10.5 acres, holding 1,112 units in configurations from a compact studio through a spacious 4 BHK Reported. That studio-through-4-BHK spread is, on paper, the widest configuration range of any project in our Sector 22D set; most of the sector's other registered projects offer only 3 and 4 BHK.
The configuration figures that don't agree
Gap Portal listings describe a studio at 725 sq.ft., a 3 BHK spanning 1,720 to 2,395 sq.ft. (the portals themselves disagree on the exact upper bound: 2,380 vs. 2,395 sq.ft.), and a 4 BHK at 3,695 sq.ft., figures that read as super or saleable area. A separate, project-branded marketing site (purvanchalsunbliss.com) instead lists a smaller, differently-labelled set: a 1 BHK at 366 sq.ft. carpet, three 3 BHK carpet variants (1,054 / 1,241 / 1,485 sq.ft.), and a 4 BHK at 2,250 sq.ft. carpet, with a quoted starting price of ₹3.6 Cr* for that top unit, as read on 11 Jul 2026.
We could not independently reconcile these two configuration sets. Part of the gap may simply be the standard carpet-area-vs-super-built-up-area distinction we documented in detail on our ATS Allure review (a carpet figure is always smaller than a super-area figure for the same physical unit), but the labelling itself differs too (“studio” vs. “1 BHK”, and three distinct 3 BHK sizes on one site vs. a single range on the others), which could equally reflect a genuinely different unit mix. Rather than guess which reading is correct, we're naming the conflict: ask for the RERA-filed carpet-area breakup directly, and confirm which figure any quoted rate is actually built on, before comparing this project's price to any other on a per-sq.ft. basis.
Price: what's actually public
We found no single, current, RERA-filed cost sheet for Purvanchal Sunbliss in this pass. What we found instead is two source clusters that don't fully agree on either size or price basis:
| Source | Reported figures | Notes |
|---|---|---|
| Portal cluster (squareyards.com, 99acres.com, mores.in) | ~₹10,000/sq.ft.* overall estimate, on a 725 to 3,695 sq.ft. size range | *As read on 11 Jul 2026. Reads as a super-area basis; no per-configuration price ladder published; the developer’s cost sheet governs Reported |
| purvanchalsunbliss.com (project-branded) | 4 BHK (2,250 sq.ft. carpet) starting ₹3.6 Cr*, as read on 11 Jul 2026; other configs unpriced | Carpet-area basis; only the top configuration carries a quoted price Reported, single source |
None of the above is a confirmed transaction price. As a rough cross-check (our own arithmetic on the two cited figures, not a claim from either source), a 3,695 sq.ft. super-area 4 BHK at the portal estimate of ~₹10,000/sq.ft.* (as read on 11 Jul 2026; the developer’s cost sheet governs) and a 2,250 sq.ft. carpet-area 4 BHK at ₹3.6 Cr land in roughly the same total-price ballpark (~₹3.6 to 3.7 Cr) despite disagreeing on the rate basis, which is at least internally consistent even though neither is a RERA-filed cost sheet. Before treating any number here as a benchmark, ask Purvanchal Projects Private Limited directly for the current price list and the carpet-area breakup, not a WhatsApp-forwarded rate card.
What Purvanchal Group's delivery record shows
Confirmed The promoter registered against Purvanchal Sunbliss, Purvanchal Projects Private Limited, is the same entity behind Purvanchal Group's long-running NCR portfolio. We independently traced two of its completed, occupied projects for this review: Purvanchal Royal City (Plot GH-05, Sector Chi-V, Greater Noida, RERA UPRERAPRJ3137, 22 acres) launched Phase 1 in June 2015 and had handed Phase 1 over in full by March 2019, with a later Phase 2 (RERA UPRERAPRJ295195, reported) delivered by December 2023; and Purvanchal Silver City (Sector 93, Noida; 21 towers, 9 floors, 644 units across ~12.13 acres) has been occupied since 2007, predating the RERA Act entirely.
That gives Purvanchal Sunbliss something genuinely rarer in this specific reported-tier cluster of Sector 22D projects: a promoter with a real, checkable delivery history rather than only a launch brochure. Resident sentiment on Royal City, per multiple portal review sections, is generally positive; residents describe “a safe and sound township” with well-used amenities, alongside minor, ordinary complaints about balcony size and maintenance response times. Gap Beyond these two named projects, the group's claimed scale conflicts sharply across the sources we found (one industry profile cites roughly 50 delivered projects and 3,500+ flats, while a portal describes the group as having delivered “over 10,000 residential units”), and we could not reconcile the two, so we're naming the gap rather than repeating either figure as settled.
Honest pros and cons versus the rest of Sector 22D
In its favour:
- Genuinely RERA-registered and directly confirmable on up-rera.in, unlike County and Orion, which surfaced no independently verifiable RERA number at all in our review.
- The widest reported configuration spread in the sector (studio through 4 BHK), against a set of neighbours that mostly offer only 3 and 4 BHK.
- A promoter with an independently-traceable, multi-decade NCR delivery record (Royal City, Silver City), a genuinely checkable thing, not just a claim.
- Possession target (January 2030) sits mid-pack for the sector: behind ACE Terra and Greenbay The Monarque, but ahead of Gaur Chrysalis Phase 1 and Eldeco Echoes of Eden.
Open gaps, honestly stated:
- Configuration and area figures conflict materially between portal listings and the project's own marketing site, unreconciled as of this review.
- No independently-fetched, RERA-filed cost sheet; every price figure is portal-reported or single-source marketing, with no live BSP confirmed.
- The developer's claimed delivered-project count and total-unit figures conflict across sources by a wide margin, a basic fact that should be easy to state consistently and isn't.
- Vidastu has no channel-partnership with Purvanchal Group and does not sell units here; we cannot independently vouch for on-site construction progress; a site visit remains the only way to confirm that.
Who should actually consider this project
Purvanchal Sunbliss is worth a look for buyers who specifically want configuration flexibility (a studio or compact entry unit alongside a full-size 4 BHK) in a sector where most projects offer only 3/4 BHK, and who take some reassurance from a promoter with a genuine, independently-checkable multi-decade delivery record rather than a first-time or purely reported-tier name. It's a weaker fit for buyers who want the earliest possible possession date (January 2030 sits mid-pack, not at the front) or who want a single, fully-reconciled cost sheet today; get the carpet-vs-super-area conflict resolved in writing before signing anything.
“We're naming the conflict, not picking a side; ask for the RERA-filed carpet-area breakup before comparing any project on a per-sq.ft. basis.”
Where Purvanchal Sunbliss sits against the alternatives
Purvanchal Sunbliss is one of twelve named projects in Sector 22D alone. Our full comparison matrix lines up every one of them (RERA status, configuration, indicative price, possession and an honest take) side by side: Sector 22D, Yamuna Expressway: All Projects Compared (2026). For a continuously-updated, single-page view of every corridor project's current bookable/EOI/sold-out/unverified status, see our Yamuna Expressway Corridor Live Index.
Verifying this yourself
Don't take this page's word for any of it; verify directly:
- Search UPRERAPRJ746863/04/2025 at up-rera.in to see the promoter name, registration date, declared completion and any complaint history for yourself.
- Ask for the RERA-filed carpet-area breakup and get the portal-vs-marketing-site configuration conflict resolved in writing before comparing per-sq.ft. rates against any other project.
- Cross-check any price figure against at least two independent sources, and ask Purvanchal Projects Private Limited directly for the current, dated cost sheet rather than trusting a portal listing or a broker's forward.
- For a site visit or a verified cost sheet on Purvanchal Sunbliss or any other Sector 22D project, our RERA-registered advisory desk can arrange one.