Insights · Sector 22D Project Review

ATS Allure, Yamuna Expressway: Honest Review (2026)

In one paragraph

ATS Allure (Sector 22D, Yamuna Expressway, Greater Noida) is a genuinely RERA-registered project (UP-RERA UPRERAPRJ918, registered 31 July 2017, promoter ATS Realty Private Limited) that, unlike most of its Sector 22D neighbours, is largely built and reportedly in possession today rather than still under construction. That maturity is the practical draw: it is one of the few corridor addresses where you can inspect finished towers rather than renders. As with any project of this vintage, the place to form your view of its delivery record is the authority's file: search UPRERAPRJ918 at up-rera.in and read the registration and filings directly before you book. Portal-reported pricing as read on 10 Jul 2026 (roughly ₹1.15 Cr to ₹1.35 Cr+) and even the distance to Jewar airport (12 to 15 km per most sources, one citing ~20 km) disagree enough across sources that we're naming the spread rather than picking a number.

ATS Allure snapshot: what's verifiable today

RERA / PromoterUPRERAPRJ918, registered 31-07-2017, promoter ATS Realty Private Limited (Promoter ID UPRERAPRM2628) Confirmed: up-rera.in project summary, checked 10 Jul 2026
LocationPlot P7, TS-02, Sector 22D, YEIDA, Gautam Buddha Nagar Confirmed: up-rera.in
Launch vs. registrationMarketed as launched 4 July 2014 (pre-dates the RERA Act); formally registered with UP-RERA only in 2017, once the Act required it, an ordinary timeline for a pre-2017 project, not itself a red flag Reported
ScalePortals disagree on tower count: 2 towers per one source, 8 per another; unit count reported as 1,114 to 1,146; land area consistently 8.48 acres Gap (towers/units)
Unit sizesRERA-filed carpet area: 2 BHK 70.23 sq.m. (~756 sq.ft.), 3 BHK 83.24 sq.m. (~896 sq.ft.) Confirmed: up-rera.in; vs. portal super-built-up figures of ~753 to 1,350 sq.ft. Reported; these are two different measurements, not a contradiction
ArchitectHafeez Contractor credited on at least one portal profile, a single-source, marketing-adjacent claim we could not independently corroborate in this pass Reported
Current status (2026)Portals describe the project as ready-to-move, with possession activity reported across most towers Reported; we could not independently confirm full compliance with the 2023 order's specific deadline
Price (portal-reported)~₹1.15 Cr (2 BHK) to ₹1.35 Cr+ (3 BHK) per whitehat.realty/squareyards; our own prior research flagged a wider ₹1.15 to 1.53 Cr range as conflicting across sources Reported, wide spread
Distance to Jewar airport12 to 15 km per most sources; one outlier source cites ~20 km Gap

Figures sourced inline below and dated to this review's verification pass (10 Jul 2026). This is independent research, not a sales listing for ATS Allure; Vidastu is not affiliated with ATS Realty Private Limited and does not claim to sell units in this project; resale enquiries are handled by our sales desk as a separate, clearly-labelled service.

Architectural plans and documents on a desk
A regulatory order settles what portal listings won't. Representative imagery

What ATS Allure actually is

ATS Allure sits at Plot P7, TS-02, Sector 22D, Yamuna Expressway, under the Yamuna Expressway Industrial Development Authority's sanctioning umbrella, the same sector that hosts Gaur Chrysalis, Eldeco Echoes of Eden, and the ACE Group's Terra/Edit/YXP trio. Its UP-RERA registration, UPRERAPRJ918, was filed 31 July 2017 by promoter ATS Realty Private Limited Confirmed (up-rera.in, accessed 10 Jul 2026). Marketing material describes an original launch around 4 July 2014, three years before the formal RERA filing, which is ordinary for a project that predates the Real Estate (Regulation and Development) Act rather than a sign of anything irregular; every ongoing project had to register once the Act's UP rules took effect in 2017.

Scale figures conflict across the portals we checked: some describe 2 towers, others 8, with total units reported anywhere from 1,114 to 1,146 across a consistent 8.48-acre plot Gap. We could not resolve this from the sources available and are naming it as an open conflict rather than picking whichever count sounds more authoritative. One credit worth noting with the same caution as our other developer reviews: at least one portal names Hafeez Contractor as architect (the same name credited on the original, unrelated ACE Parkway), but we found this on a single marketing-adjacent source and couldn't independently corroborate it here Reported.

Carpet area vs. super built-up: the numbers that actually matter

Confirmed UP-RERA's project filing states carpet areas of 70.23 sq.m. (~756 sq.ft.) for the 2 BHK and 83.24 sq.m. (~896 sq.ft.) for the 3 BHK (up-rera.in). Most portal listings instead advertise a super-built-up range of roughly 753 to 1,350 sq.ft., a larger figure that includes common areas, wall thickness and shared amenity space, not just your actual usable floor area.

These aren't contradictory numbers; they're two different measurements, and conflating them is one of the most common ways a buyer ends up paying a per-sq.ft. rate on a bigger number than the flat they actually get. Before comparing ATS Allure's cost per sq.ft. against any other Sector 22D project, confirm which figure (carpet or super built-up) every price you're comparing is actually based on.

Delivery status on the record

ATS Allure has carried its UP-RERA registration (UPRERAPRJ918) since 31 July 2017, and portal listings as of 2026 describe the project as largely possession-complete across most towers. As with any project of this vintage, the authority's records are the place to form your view: search UPRERAPRJ918 at up-rera.in and review the registration and filings directly before booking, and confirm current possession status tower-by-tower on a site visit.

Where does it stand today, and how far is it really from Jewar airport?

As of this review, multiple portals describe ATS Allure as ready-to-move, with possession activity reported across most towers Reported. We can't independently verify occupancy tower-by-tower, but the consistent "ready to move" framing across several independent listings, is a reasonable (not certain) signal that the bulk of the project has been handed over.

On the specific question we see buyers actually ask (how far is ATS Allure from the new Jewar airport), the honest answer is that sources don't agree closely enough to give you one clean number. Most listings we checked put the distance at roughly 12 to 15 km by road; one source cites approximately 20 km Gap. Given the surrounding road network around Jewar is still being completed, we'd treat any of these as an approximate, pre-final-road-network figure rather than a precise drive time, and we'd recommend driving the actual route, or checking a live map against your specific starting point, before it factors into a decision. For the fuller airport-connectivity picture across the whole corridor (what's actually operating today versus still years away), our sister research at eldecoeoe.com's Jewar Airport Distance Guide covers the sector-by-sector detail this page doesn't need to duplicate.

Where ATS Allure sits against the alternatives

ATS Allure is one of twelve named projects in our full Sector 22D comparison matrix: Sector 22D, Yamuna Expressway: All Projects Compared (2026). That's not disqualifying (a confirmed RERA number and a largely-delivered status put it ahead of several pre-launch neighbours on regulatory maturity alone), but it is a reason to verify every figure here directly rather than take any single portal's word for it, in a sector that also includes Gaur Chrysalis (reported sold out), Eldeco Echoes of Eden (live RERA, visible construction, open direct booking) and the ACE Group's Terra/Edit/YXP filings. For a live, one-page grid of every named project's RERA number in this corridor, see our Yamuna Expressway RERA Number Lookup, and if you're still weighing which project to actually book, Which Project Should I Book? answers that directly, project by project.

Verifying this yourself

Don't take this page's word for any of it; verify directly:

  1. Search UPRERAPRJ918 at up-rera.in to see the promoter name, registration date, and the authority's records for the project, rather than trusting this page or any secondary summary.
  2. Ask specifically for the carpet-area figure on any unit you're considering, not just the super-built-up number quoted in marketing material.
  3. Cross-check the Jewar-airport distance and any resale price against at least two independent sources, since our own research found real disagreement on both.
  4. For a site visit, current possession status by tower, or a verified cost sheet on ATS Allure or any other Sector 22D project, our RERA-registered advisory desk can arrange one.

Frequently asked questions

What is ATS Allure's RERA registration, and is it actually delivered?
ATS Allure is registered with UP-RERA under UPRERAPRJ918, filed 31 July 2017, promoter ATS Realty Private Limited, confirmed directly on up-rera.in. It is not a fresh launch: marketing material cites an original 2014 launch, with initial possession activity reported around 2019 to 2021. Portals describe the project in 2026 as largely possession-complete. As with any project of this age, review the authority's full records for it directly on up-rera.in before booking, and confirm possession tower-by-tower on a site visit.
How far is ATS Allure from Jewar international airport?
Sources disagree and we're naming the spread rather than picking one number. Most listings we checked put ATS Allure roughly 12 to 15 km from Noida International Airport (Jewar) by road; one outlier source cites approximately 20 km. Exact drive distance depends on which access route and which airport gate you're measuring to, and the surrounding road network is still being built out; treat any single figure as approximate until you've driven the route yourself or checked a live map.
What does ATS Allure cost today, and how big are the units really?
Portal-listed asking prices, as read on 10 Jul 2026, run roughly ₹1.15 Cr for a 2 BHK to ₹1.35 Cr-plus for a 3 BHK, though our own prior research found this range conflicting across sources (as wide as ₹1.15 to 1.53 Cr for what may be different unit types or resale-versus-primary listings). On size: UP-RERA's filing states carpet areas of 70.23 sq.ft. (~756 sq.ft.) for the 2 BHK and 83.24 sq.m. (~896 sq.ft.) for the 3 BHK, noticeably smaller than the 753 to 1,350 sq.ft. super-built-up figures most portals advertise. That gap between carpet area and super built-up area is normal in Indian real estate, but it's exactly the kind of number worth clarifying before you compare this project to any other on a per-sq.ft. basis.
How does ATS Allure compare to other Sector 22D projects?
It's one of twelve named Sector 22D projects in our full comparison matrix, and the one row there we flagged as carrying the messiest data set: conflicting portal figures on price, area and possession. That's not a reason to dismiss it (it does have a confirmed RERA number and a mostly-delivered status, ahead of several pre-launch neighbours), but it is a reason to verify every figure directly rather than trust any single portal. Read the full matrix, and our own YEIDA corridor coverage at eldecoeoe.com, before deciding where it sits in your shortlist.
How do I verify any of this myself before I call anyone?
Go to up-rera.in and search UPRERAPRJ918 directly; you'll see the promoter name, registration date, and (in the authority's orders section) the authority's records for the project, rather than trusting any third-party summary. Cross-check any resale price or airport-distance claim against at least two independent sources, since portal figures disagree even on basics like tower count in this case. And ask specifically for the carpet-area figure, not just the super-built-up number, before comparing cost per sq.ft. across projects.
Kya ATS Allure ka RERA number verified hai?
Haan. ATS Allure UP-RERA registration UPRERAPRJ918 ke saath registered hai, jo 31 July 2017 ko file hua tha, promoter ATS Realty Private Limited ke naam par. Yeh number up-rera.in par seedha confirm kiya ja sakta hai. Possession ke baare mein, 2026 tak zyada tar portals ise possession-complete batate hain, lekin apna site visit se hi confirm karein.

Sources cited above

  1. UP RERA: ATS Allure project summary, registration UPRERAPRJ918 (promoter, registration date, carpet areas; accessed 10 Jul 2026)
  2. SquareYards: ATS Allure, Sector 22D Yamuna Expressway (price, RERA, architect credit)
  3. whitehat.realty: ATS Allure project profile
  4. 99acres: ATS Allure, Yamuna Expressway, Greater Noida
  5. Vidastu, Sector 22D, Yamuna Expressway: All Projects Compared (2026)
Vidit Kaushik, Director, Vidastu Developers Pvt. Ltd.

Vidit Kaushik

Civil Engineering, BITS Pilani · UP-RERA Agent UPRERAAGT000309/01/2026 · Director, Vidastu Developers Pvt. Ltd.

Talk to the desk

Weighing ATS Allure, or another corridor project?

Tell Vidit which project you're actually evaluating: ATS Allure resale, or anything else in Sector 22D, and he'll walk you through what's confirmed, what's still open, and what to verify yourself, plus arrange a site visit with a verified cost sheet.

+91 98114 05300

Mon to Sat, 10 to 6:30 · Sunday, phone & WhatsApp only

Your number goes to the desk, not a call-centre.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Disclosure: This is independent research and general information published by Vidastu Developers Pvt. Ltd. / Vidastu Advisory (sister brand, UP-RERA-registered agent UPRERAAGT000309/01/2026), an authorised channel partner, not ATS Group, ATS Realty Private Limited, ATS Heights Private Limited, UP RERA, or any portal named above. Vidastu is not affiliated with ATS Allure's promoter and does not claim to sell units in it; resale enquiries are handled by our sales desk as a separate, clearly-labelled service. Figures are dated and sourced inline, including a legal-industry blog's summary of a 2023 regulatory order that we could not access in primary form during this pass; verify the primary order text and any project's RERA registration independently at up-rera.in before making any payment.