What you get when Vidastu builds on your Greater Noida plot
Turnkey construction of residential and industrial buildings on plots in YEIDA, Greater Noida and Noida: design, approvals, construction and handover.
Fixed contract
One binding, itemised quote after a free site walk, in writing before any money moves.
Milestone payments
You pay against completed, inspectable work, never ahead of it.
Daily site photographs to the owner
Photographs from your own site, every working day, wherever you are.
Built to meet YEIDA's construction timelines
Scheduled against the authority's deadline for your plot, not against ours.
How it works
A free site walk first, then one binding itemised quote. After you sign, the dated milestones are fixed in the written contract, and the money follows the work: design, approvals, construction, handover.
The proof, not the adjectives
Named work on the ground in Greater Noida: Jagat Farms, Alpha Commercial Belt Tower, NTPC Society. Both Directors are named on the company record, and the office is at 206, Second Floor, Meridian View Plaza, Block E, Alpha-I Commercial Belt, Greater Noida, Uttar Pradesh 201310.
Vidastu is a construction company and civil contractor in Greater Noida: turnkey house construction, renovation and interiors on your plot, run by an office right here at Meridian View Plaza, Block E, Alpha-I Commercial Belt (HQ Greater Noida; we build across Noida & NCR). The one thing most owners don’t realise: Greater Noida and the Yamuna Expressway are two different authorities, GNIDA and YEIDA, with separate building approvals. We build across both and file your plan with the right one.
Vidastu Build packages, all Vaastu-aligned by design — priced on call, one binding fixed quote after a free site walk. See inclusions →
The short answer
Looking for a construction company or contractor near you in Greater Noida? Vidastu Developers Pvt. Ltd. (CIN U68200UP2023PTC192378) is a 4.8★-rated construction company and civil contractor based at Meridian View Plaza, Block E, Alpha-I Commercial Belt, Greater Noida. We handle turnkey house construction, renovation, interiors and GNIDA / YEIDA building-plan approval in-house — across Greater Noida city, Greater Noida West / Noida Extension and the Yamuna Expressway sectors. There is no public price list; you get one binding, itemised fixed quote after a free site walk. WhatsApp your sector and plot size to +91 95404 45300.
GNIDA, YEIDA or Noida Authority — which one governs your plot?
Greater Noida is governed by GNIDA; the Yamuna Expressway corridor is governed by YEIDA; Noida city proper is governed by the Noida Authority. All three were created under the same parent law — the UP Industrial Development Act, 1976 — but they run independently, with separate notified areas, separate byelaws and separate building-plan approvals. The areas abut each other, which is exactly why owners mix them up. GNIDA covers Greater Noida city across a large notified area of many villages, including Greater Noida West / Noida Extension; YEIDA covers the Yamuna Expressway sectors, the Noida International Airport (Jewar) belt and the proposed Film City; the Noida Authority covers the older, denser sectors of Noida itself.
Why this matters before a single brick is laid: the building plan must be filed with the authority that actually notified your plot. File with the wrong one and the plan bounces, weeks evaporate, and on a YEIDA plot you can lose ground against the 31 December 2026 completion deadline. The byelaw grids differ too — ground coverage, FAR and height caps are not identical across the three — so a design legal on one authority’s plot may not sanction on another’s.
| GNIDA | YEIDA | Noida Authority | |
|---|---|---|---|
| Governs | Greater Noida city, including Greater Noida West / Noida Extension | Yamuna Expressway sectors, Jewar airport & Film City belt | Noida city sectors |
| Plan filed with | GNIDA — online Smart-DCR system; COA-registered architects empowered to sanction residential plots | YEIDA — online BPMS / Smart-DCR map approval | Noida Authority online system |
| Build deadline pressure | Per allotment / lease terms | Common completion deadline extended to 31 Dec 2026 | Per allotment / lease terms |
| Vidastu builds here? | Yes — across the city | Yes — across the corridor | Yes — see our Noida page |
Authority structure (all three created under the UP Industrial Development Act, 1976): GNIDA — Wikipedia; GNIDA — Approval of Building Plans. Byelaw figures are confirmed per plot at the sanction stage.
How does GNIDA building-plan approval work for a residential plot?
Short answer: a Council of Architecture (COA)-registered architect prepares your plan to the GNIDA byelaws and files it through GNIDA’s online system, which auto-checks the drawing before sanction. GNIDA has empowered COA-registered architects to sanction building plans and occupancy certificates on individual residential plots, and runs a Smart-DCR (Development Control Regulations) system that runs an automated compliance check against the byelaws — which is what has pulled approval times down from weeks to days for clean, compliant plans.
In practice the steps are:
- Drawings to byelaw. A COA-registered architect sizes the plan to your plot’s sanctioned ground coverage, FAR and height limit — floors, setbacks, parking, basement.
- Online filing. The plan is uploaded to GNIDA’s online portal with the required architect declaration and the checklist documents from the building regulations.
- Smart-DCR compliance check. The system auto-verifies the drawing against the zonal plan and byelaws; clean plans clear quickly, while flagged items are corrected and re-submitted.
- Sanction, then build. Once sanctioned, construction can begin to the approved drawing — and at the end, the occupancy / completion certificate is obtained the same way.
For Yamuna Expressway plots the route is YEIDA’s online map-approval system rather than GNIDA’s — same principle, different authority. Either way, Vidastu handles the filing end to end as part of every build; you don’t chase the portal. The full corridor process, including YEIDA, is on our YEIDA building-plan approval guide.
GNIDA process per GNIDA — Building Plan Approval & Occupancy Certificates. Exact documents, fees and timelines are confirmed on the official portal at filing.
What does Vidastu build in Greater Noida?
From a vacant plot to a finished, move-in home — one accountable contractor on a written milestone contract, across both authorities.
Turnkey independent houses
End-to-end construction on your plot — structure, finishing and handover — within the FAR, coverage and setback norms of the governing authority.
Renovation & remodelling
Extensions, layout changes, kitchen and bathroom upgrades, waterproofing and structural repair for existing Greater Noida homes.
Interior fit-out
Full interiors for new flats and houses — modular kitchens, wardrobes, false ceilings, flooring, paint and finishing electrical/plumbing.
Plan approvals, in-house
Drawings and sanction through the right authority — GNIDA for Greater Noida, or YEIDA for the corridor — with a CoA-registered architect, handled as part of every build.
On a ready-mixed pour you get the batch slips naming the grade and quantity, and on either route the cube test reports at 7 and 28 days from your own pour, handed over with the house rather than quoted at you.
What types of house can you build in Greater Noida?
Whatever sits on your plot — or whatever you want built on it — the same Vidastu team and contract cover it. House construction in Greater Noida usually takes one of these forms; each is sized to your plot’s sanctioned FAR, ground coverage and height limit by a COA-registered architect.
Independent house (ground / G+1 / G+2)
The most common build — a single-family home on a vacant residential plot, sized to your sanctioned coverage and FAR. G+1 gives you a second full floor for family or rental; G+2 adds a third where your plot’s FAR and the height limit allow it. We model both in your quote so you compare on real area.
G+1 duplex construction
A duplex links two levels into one home with an internal stair — ideal where you want generous ceiling volume and a connected family layout rather than separate floors. Planned around the structural and FAR limits of the governing authority. See duplex construction →
Villa & kothi construction
A larger plot, lower coverage, more garden, setback and façade — a villa or kothi is the premium end of plotted construction, usually finished to Premium or Luxe spec with imported stone, structural glazing and landscaped frontage. See villa construction →
Basement & stilt parking
A basement adds usable area below ground (store, utility, parking) and needs extra foundation, retaining-wall and waterproofing design; stilt parking lifts the home a level and changes how floors count toward the height limit. Both are sized at the design stage and priced explicitly — never assumed.
Renovation & floor addition
Adding a floor, reworking a layout or fully renovating an existing Greater Noida house — a structural feasibility check on the existing frame comes first, then a fixed-scope quote. The right move when the plot already carries a building you want to keep and extend.
Interiors & fit-out
For a new flat, a fresh shell or a tired home — modular kitchen, wardrobes, false ceilings, flooring, paint and finishing services. Can run as a standalone scope or as the final stage of a turnkey build, on the same written contract.
How does a turnkey build run, bare plot to keys?
“Turnkey” means one contractor takes your plot from empty to move-in — design, approval, material, labour, finishing and certification — on a single written contract, so there’s no gap between an architect, a labour contractor and a finishing crew for you to manage. A turnkey build runs on dated milestones fixed in the written contract, whichever authority governs your plot. These are the working durations we plan against, each stage milestone-linked in your contract:
- Site walk & jurisdiction check — week 0. We confirm GNIDA / YEIDA / Noida jurisdiction from your allotment papers, read the plot and put a binding, itemised fixed quote in writing — before any money moves.
- Design & layout. A COA-registered architect sizes the drawings to your plot’s FAR, coverage and setbacks under the governing authority’s norms, working in your room programme and Vaastu.
- Building-plan approval. Filed with the right authority: GNIDA for Greater Noida city plots, or YEIDA for expressway sectors — we handle the filing end to end.
- Foundation & structure. Excavation, foundation to soil, RCC frame, brickwork and slabs to the sanctioned design — the load-bearing core of the build.
- Finishes & interiors. Plaster, flooring, electrical, plumbing, paint, kitchen and fit-out to the finish level priced in your quote.
- Completion & handover. Completion / occupancy formalities with the governing authority (needed for utilities, loans, registry and resale), then the keys.
Vidastu Developers Pvt. Ltd. builds under Vidastu’s UP-RERA-registered advisory umbrella (Agent UPRERAAGT000309/01/2026, Vidastu Advisory).
No big advance — pay as it rises
Indicative split; exact milestones fixed in your contract.
How much can you build on a Greater Noida plot — FAR, coverage & height?
Short answer: ground coverage and FAR are set by GNIDA’s building byelaws and scale with plot size — smaller plots get higher coverage and FAR, larger plots a little lower — with a height limit on independent residential plots. The principle is consistent: a compact plot is allowed to cover more of its footprint and stack more floor-area ratio so a usable home fits; a larger plot covers a smaller share, leaving setback and garden. The same logic applies on the YEIDA side, under YEIDA’s byelaws.
What this means in practice is that two owners with the same plot size, governed by the same authority, can usually build a broadly similar envelope — but the exact sanctioned figures for your plot depend on your sector, zonal plan and current byelaw revision, which is why we don’t put a single number on a webpage. Decoding the grid is the architect’s job, not yours: at the design stage a COA-registered architect sizes your drawings to your plot’s exact sanctioned coverage, FAR and height, so nothing bounces at scrutiny and you don’t over- or under-build.
Where do you build — which Greater Noida sectors & sub-areas?
As a Greater Noida-based construction company we cover the whole GNIDA city, the adjoining Greater Noida West / Noida Extension belt, and the YEIDA corridor on the Yamuna Expressway. our Alpha Commercial Belt office is central to all three, which keeps site supervision close. Owners come to us from across:
Greater Noida West / Noida Extension
A construction company in Greater Noida West (Noida Extension) — GNIDA jurisdiction; turnkey houses, floor additions and interiors across the fast-growing extension.
GNIDA Alpha, Beta, Gamma, Delta, Swarn Nagari
The established GNIDA residential sectors around our Alpha Commercial Belt office — close enough for daily supervision.
YEIDA / Yamuna Expressway sectors
Sectors 18, 20, 22D and 24A, Gaur Yamuna City and the Jewar airport belt — YEIDA jurisdiction, on the 31 Dec 2026 build clock.
Noida city
Under the Noida Authority next door — we build, renovate and fit out homes there too. See our Noida construction page →
What materials and structural basics should a homeowner understand?
You don’t need to be an engineer, but knowing what sits behind a quote stops you being sold a vague “good quality” promise. A house is built in two layers: the structure, which is load-bearing and effectively permanent, and the finishes, where most of the visible budget — and most of the swing between Essential, Premium and Luxe — actually lives.
RCC frame — cement & TMT steel
Modern homes here use a reinforced-cement-concrete frame: columns and beams cast with branded cement and ISI-marked TMT (thermo-mechanically treated) steel, which gives the strength and earthquake resilience a load-bearing brick wall can’t. The steel grade and the concrete mix should be named in your contract, not left open.
Foundation sized to soil
The foundation transfers the whole building’s load into the ground, so its depth and type are set by your plot’s soil — not a copy-paste from the last site. This is why a site walk matters before any number: soil and water-table conditions move the structural cost before a single finish is chosen.
Waterproofing & plumbing
Roof and wet-area (bathroom, kitchen, balcony) waterproofing is where corners get cut and leaks start years later — it should be included, with coverage stated in your contract. Plumbing should be concealed CPVC; electrical should be copper wiring with ISI modular switches.
Envelope & finishes
UPVC windows and quality doors seal the envelope; then flooring (vitrified tile up to imported stone), the kitchen, bathrooms, paint and façade set the look and the price. This is the finish ladder that Essential, Premium and Luxe climb — specified line by line in your itemised quote.
The single most useful thing to insist on: a named material specification for every line, attached to a fixed-price contract. A rate with no spec behind it is a number you’ll renegotiate at slab level. The full cost logic is on our Greater Noida & Yamuna Expressway construction cost guide.
Are you a civil contractor, or a full construction company?
Looking for the best civil contractor in Greater Noida? There is no independently audited “best” ranking to hand you — the honest test is verified registration, a named team you meet, a written milestone contract, weekly site proof and written defect-liability terms, judged the same way for any firm (the full eight-point method is on our choosing a builder guide). On that test, Vidastu works as both a civil contractor and a full construction company — and the distinction is worth understanding when you brief a build. Beyond full turnkey homes, Vidastu takes on the civil contractor scope that owners and architects need in Greater Noida — foundation and RCC structure, brick and block work, plaster, waterproofing and structural repair — all on a written, itemised contract rather than a verbal day rate. So whether you need a complete construction company to deliver a finished house, or a civil contractor in Greater Noida for a defined structural scope (say, you have your own architect and finishing crew and need only the shell built right), it runs under one accountable team with weekly photo proof.
The thing that doesn’t change between the two is accountability: written scope, named spec, milestone-linked payments and defect-liability terms. A “civil contractor” on a verbal day rate with no contract is exactly the arrangement that drifts on cost and time — which is why we don’t work that way, even on a partial scope.
How do you vet a construction contractor in Greater Noida — and what are the red flags?
Use the same checklist on every quote you receive — ours included. A trustworthy construction contractor will pass all six without flinching:
- A written, itemised contract. Not a verbal day rate. Every inclusion and exclusion named — boundary wall, gate, tanks, connections, approval fees and GST are the usual “extras” that ambush owners later.
- A named material spec. Steel grade, cement, tile and fittings allowance, wiring and plumbing brands — written down. “Good quality” is not a spec.
- Milestone-linked payments, no big advance. Money released against completed stages, never one large lump sum up front.
- A fixed timeline with a penalty clause. A date you can hold them to, in writing.
- Registration you can check. A UP-RERA registration, a real office, and completed sites you can visit.
- Approvals scope stated. Who files the GNIDA / YEIDA plan, and is it inside the price.
The red flags are the inverse: a demand for a large advance, a vague spec, no written contract, no registration, no site you can visit, and a refusal to put the timeline on paper. The deeper guide — with the exact contract clauses and safe payment stages — is on our how to hire a contractor page.
Why pick a named local RERA team over a national construction marketplace?
A national construction marketplace sells a brand and a glossy app, then usually sub-contracts your build to a rotating local crew you never chose — and when something goes wrong, you’re escalating through a call centre that has never seen your site. The economics push toward volume, not your one house.
A named, UP-RERA-registered local team works the other way. You sign one written contract with the company that actually builds; the people supervising your slab are the people you spoke to. We know GNIDA and YEIDA approvals first-hand because we file them every month, our office is at Meridian View Plaza, Block E, Alpha-I Commercial Belt so supervision stays close, and you get weekly photo and video proof from your own site on WhatsApp — you judge the work as it happens, not a brand on faith. That accountability is the whole product.
Based in Greater Noida
Our office is at Meridian View Plaza, Block E, Alpha-I Commercial Belt — site supervision stays close for jobs across the GNIDA city and the YEIDA corridor alike.
UP-RERA registered
A registered company (UPRERAAGT000309/01/2026), written contracts and itemised quotes — not a verbal handshake.
Your site, weekly
Photo and video updates from your own build, every week on WhatsApp — judge the work as it happens, wherever you are.
Delivery is led by Vidit Kaushik (BITS Pilani ’22; LinkedIn) alongside Director Ravi Shankar Sharma, who has built in Greater Noida since 2000 — the same team behind Vidastu’s 4.8★-rated property advisory.
What drives the cost — and how do we price it?
There is no public Vidastu price list, because no two plots cost the same to build on — a per-sqft rate on a webpage is either padded or quietly renegotiated later. Five things actually set the number:
Plot size & built-up area
The single biggest lever — total built-up area sets the scale of everything else.
Number of floors
G+1 vs G+2 changes structure, staircases and services — we run both options in your quote so you compare on area, not guesswork.
Soil & structure
Foundation depth, steel design and site conditions set the structural base before a single finish is chosen.
Finish level
Flooring, kitchen, bathrooms, doors, façade — where budgets swing most. Pick Essential, Premium or Luxe.
Approvals & site logistics
GNIDA / YEIDA byelaws cap your buildable area; access road, water and power availability nudge the rate — measured on the walk, not guessed.
How the quote works: you share plot size, sector and floors → we walk the site free → you get one binding, itemised fixed quote in writing — every inclusion and exclusion named, GST invoiced, no lump sums. It moves only if you change the scope. The full breakdown of what drives the number is in the 2026 cost guide.
Vidastu Build — the three packages
Three tiers, all Vaastu-aligned by design: Essential (branded cement, ISI TMT steel, UPVC windows, copper wiring, concealed CPVC plumbing), Premium (adds Jaquar-tier CP, Asian Paints premium emulsion, Hindware-tier fixtures) and Luxe (adds imported tile & stone). Each is priced on call after the free site walk. Full inclusion lists on Vidastu Build.
Why is 2026 the moment to build?
The corridor that wraps around Greater Noida is reaching milestones that pull demand — and, on the YEIDA side, there’s a hard deadline.
For plots in YEIDA sectors, the construction-completion deadline was extended by a year to 31 December 2026, benefiting 10,000+ allottees. (This applies to YEIDA plots, not GNIDA city plots.)
Noida International Airport (Jewar) was inaugurated 28 March 2026; commercial domestic flights are expected from mid-2026 — lifting the whole Greater Noida–Yamuna Expressway belt.
Hold a YEIDA-sector plot?
YEIDA’s free construction window closes 31 Dec 2026 — — days left
YEIDA’s 87th board meeting (Nov 2025) extended the free-build window to 31 Dec 2026 for allottees with executed lease deeds — 10,000+ haven’t built, with far fewer completion certificates issued so far. The deadline applies to YEIDA allottees, not GNIDA city plots — if you hold one of each, the YEIDA plot is the one on the clock. Read the YEIDA deadline 2026 guide →
YEIDA deadline per the 87th board meeting, as reported by Millennium Post. Airport status: Noida International Airport. Flight date is the announced schedule.
Where is Vidastu in Greater Noida?
We’re at 206, Second Floor, Meridian View Plaza, Block E, Alpha-I Commercial Belt, Greater Noida, Uttar Pradesh 201310 — central to the GNIDA city, Greater Noida West / Noida Extension and the Yamuna Expressway corridor.
Greater Noida construction — FAQ
Are you a construction contractor near me in Greater Noida / Yamuna Expressway?
We're based in Greater Noida (Meridian View Plaza, Block E, Alpha-I Commercial Belt) and build across the GNIDA city, Greater Noida West / Noida Extension and the YEIDA / Yamuna Expressway corridor — so for plot owners searching for a construction contractor near them in Greater Noida, Noida or along the expressway, we cover your area. WhatsApp +91 95404 45300 with your sector and plot size.
Which authority approves my house plan — GNIDA, YEIDA or Noida Authority?
It depends on where the plot sits. All three were created under the UP Industrial Development Act, 1976 and run independently. Greater Noida city, including Greater Noida West / Noida Extension, is governed by GNIDA; the Yamuna Expressway sectors are governed by YEIDA; Noida city proper is governed by the Noida Authority. Filing on the wrong one loses weeks — we confirm jurisdiction from your allotment papers and file on the correct portal for you.
How does GNIDA building-plan approval work for a residential plot?
GNIDA has empowered architects registered with the Council of Architecture (COA) to sanction building plans and occupancy certificates on individual residential plots, and runs an online Smart-DCR system that auto-checks the drawing against the byelaws. A COA-registered architect prepares the plan, files it online with the required declaration and checklist documents, the system runs a compliance check, and the sanction follows. Vidastu’s architect handles this filing end to end as part of every build — see the approval guide for the corridor route.
Do you build in Greater Noida West / Noida Extension too?
Yes. Greater Noida West (Noida Extension) falls under GNIDA, and we build, renovate and fit out homes there as we do across the rest of Greater Noida.
What types of house construction do you do in Greater Noida?
Independent house construction (ground / G+1 / G+2), duplex construction, villa and kothi construction, basement and stilt-parking builds, plus renovation, floor additions and interiors on existing homes — all in Greater Noida and the YEIDA sectors. Each is built to your plot’s sanctioned FAR and coverage, on one written contract.
Are you a civil contractor, or a full construction company?
Both. Vidastu works as a full turnkey construction company — design, approval, structure and finishing to a move-in house — and also takes defined civil contractor scopes in Greater Noida (foundation, RCC structure, brickwork, plaster, waterproofing, structural repair) on a written, itemised contract. Tell us what you need on WhatsApp.
Who is the best civil contractor in Greater Noida?
There is no independently audited “best civil contractor in Greater Noida” list — the honest way to choose is the same eight-point method used for any construction company: verified registration, a named delivery team, weekly site proof, a written milestone contract, a site visit, an itemised fixed quote, in-house map approval and post-handover defect-liability terms in writing. Vidastu Developers Pvt. Ltd. (CIN U68200UP2023PTC192378) meets each point, and Vidastu Advisory holds the UP-RERA Agent registration (UPRERAAGT000309/01/2026) — but judge us, and anyone else you shortlist, against the checklist rather than a ranking. Full eight-point method: choosing a builder guide.
How much can I build on my Greater Noida plot — FAR and ground coverage?
Ground coverage and FAR are set by GNIDA’s building byelaws and scale with plot size — smaller plots get higher coverage and FAR, larger plots a little lower — with a height limit on independent residential plots. The exact figures for your plot are confirmed by a COA-registered architect at the sanction stage, so nothing bounces at scrutiny. Send your plot size on WhatsApp and we’ll tell you what fits.
What does it cost to build here in 2026?
Every plot and design is different, so we don’t publish rates. Share your plot size, floors and finish level and you get one binding, itemised fixed quote after a free site walk — priced on call, agreed in writing before work begins. Read what drives your build cost, then message us.
What drives the cost of building a house in Greater Noida?
Five things move the number: plot size and total built-up area, the number of floors (G+1 vs G+2), soil and structural conditions, the finish level you choose (Essential, Premium or Luxe), and the approvals plus site logistics. Two identical-looking plots can finish far apart, which is why the real figure comes from a site walk, not a price-per-sqft table.
Can one contractor handle a plot in YEIDA and a renovation in Greater Noida?
Yes — that’s exactly why owners use us. The construction standard is the same; only the approval route changes by authority. We manage both under one written contract and one point of contact.
How do I vet a construction contractor in Greater Noida — what are the red flags?
Insist on a written, itemised contract with a named material spec, milestone-linked payments (never a big advance), a fixed timeline and written defect-liability terms. The red flags are a verbal day-rate with no contract, a demand for a large up-front lump sum, a vague “good quality” spec, and no registration or completed sites you can visit. Use the same six-point checklist on every quote, including ours — full version on how to hire a contractor.
I’m an NRI — can you build remotely?
Yes. We run the build on a written milestone schedule with photo and video updates, so you approve and release payment stage by stage from anywhere. A Power of Attorney holder signs local paperwork on your behalf — see NRI home construction.
How long does a turnkey build take in Greater Noida?
Design, plan approval, structure, finishes, then handover: the dated milestones are fixed in your written contract before work starts; plot size, floors and finish level decide them.
What materials and structural basics should I understand before building?
The load-bearing essentials are an RCC frame built with branded cement and ISI-marked TMT steel, a foundation sized to your soil, concealed CPVC plumbing, copper electrical wiring, UPVC windows, and roof and wet-area waterproofing. Above the structure, finishes — flooring, kitchen, bathrooms, doors and façade — are where budgets swing most. A named spec sheet for every line beats a vague “good quality” promise.
Do you build basements and stilt parking in Greater Noida?
Yes, where the plot size and the governing authority’s byelaws permit it. Basements need extra foundation, waterproofing and structural design, and stilt parking affects how floors are counted toward height — both are sized by the architect at the design stage and priced explicitly in your itemised quote.
Why pick a named local RERA team over a national construction marketplace?
A national marketplace usually sub-contracts your build to a rotating local crew and hands you a call centre. A named, UP-RERA-registered local team is accountable on one written contract, knows GNIDA and YEIDA approvals first-hand, supervises from a Greater Noida office, and sends weekly photo and video proof from your own site. You judge the work as it happens — not a brand on faith.
How are payments structured — do you take a big advance?
No big advance. Payments are milestone-linked and released against completed stages — indicatively around 10% on agreement and design sign-off, 20% at foundation and plinth, 35% at RCC structure and brickwork, 25% at finishes and 10% at handover. The exact split is fixed in your written contract before a single rupee changes hands.
What are the Vidastu Build packages?
Three tiers, all Vaastu-aligned by design: Essential (branded cement, ISI TMT steel, UPVC windows, copper wiring, concealed CPVC plumbing), Premium (adds Jaquar / Asian Paints / Hindware-tier finishes) and Luxe (adds imported tile and stone). Each is priced on call — one binding, itemised fixed quote after a free site walk. Full inclusion lists on Vidastu Build.