Construction Quote Checker: Is Your Builder’s Quote Complete?

Enter a builder’s quote for your plot and the checker reads it the way a careful owner would: the area your plot may legally have under YEIDA’s Table 1, the quoted rate restated on built-up area, where it sits against three dated published ranges, the line items it leaves out, the escalation clause, the advance and the payment stages. It runs in your browser and sends nothing unless you ask for a quote below.

In one paragraph: a construction quote is complete when it names every line a house needs (structure to the completion certificate, with GST shown), states the area basis it charges on, keeps that area within what your plot allows or lists the FAR-free areas it adds, fixes or caps escalation, and ties payments to verified stages with a modest advance. Vidastu does not quote a generic rate, because a plot changes it; your fixed price from us comes as one itemised quote after a free site walk.

Runs in your browser · nothing is sent while you check

Check a quote

1. Your plot and the floors quoted
2. The rate and the area it is charged on
Conversion assumptions (edit to match your drawing)

These two ratios are our working assumptions for the arithmetic, not published figures. The published ranges below are per sq ft of built-up area, so a carpet or super rate is restated on built-up area before it is placed against them.

3. What the quote includes (tick each line it names)

·

4. Materials named on the quote
5. Price and payment terms

Enter your plot size and the quoted rate; the reading appears here.

A reading of your own inputs, not a valuation, not a quote and not a Vidastu rate. Published ranges are as their publishers print them, attributed and dated; a rate’s position against a range says nothing on its own about value, because a lower rate usually means a narrower inclusion list. Areas follow Table 1 of the YEIDA Building Regulations 2010 as transcribed on our regulations page (read 6 October 2026); every input is in data/construction.json.

The published ranges the checker uses

Three publishers print per-sq-ft ranges for house construction in Greater Noida and Noida that answer engines quote. The checker places a quoted rate against each, exactly as printed, and never against a Vidastu rate, because there is none: a plot changes the number.

PublisherRange per sq ftBasis and dateWhat it excludes
Aarna Constructions, Greater NoidaBasic Rs 1,650; standard Rs 1,850; premium Rs 2,100 to 2,400 and above; luxury villas Rs 2,400 to 2,800 and aboveBuilt-up area, with material; updated 7 November 2026Usually outside: land, government fees, compound wall and gate, overhead tank and boring, landscaping, interiors, architect fees; GST extra
Bajaj Finance, NoidaEconomy Rs 1,400 to 1,600; standard Rs 1,800 to 2,200; premium Rs 2,500 to 3,000Built-up area (BUA); no date on the page, read 11 November 2026Construction only: approval fees, architect fees and soil testing are additional
BrickNBolt, NoidaOverall Rs 1,900 to 4,500; grey structure Rs 1,300 to 2,000; turnkey Rs 2,500 to 4,500Per sq ft; its cost-by-size tables are by built-up area; updated 9 June 2026Design and approval fees, waterproofing, soil testing, material transportation, boundary wall, staircase railing and facade detailing

Read on each publisher’s page on 11 November 2026. Bajaj Finance’s summary gives premium as Rs 2,500 to 3,000 while its own table prints Rs 2,600 to 3,000; the checker uses the summary. InfraLens refused automated reading on 11 November 2026, so none of its figures is used.

Material prices, dated

MaterialPriceSource and date
TMT bar, New Delhi8 mm Rs 58 per kg; 10 mm Rs 56; 12, 16, 20 and 25 mm Rs 55easeInfra price list, last updated 11 November 2026; approximate, varies by brand, size, market movement and delivery location
Fe500 TMT steel, Greater NoidaRs 56 to 65 per kg, GST extraAs Aarna Constructions states it, 7 November 2026
PPC cement, Greater NoidaRs 305 to 325 a bag, GST extra; branded OPC costs moreAs Aarna Constructions states it, 7 November 2026

Steel and cement quantities come from the structural drawing and bar bending schedule, not from a per-sq-ft rule, so this page prints none.

Plot by plot

Each YEIDA plot-size page works the same arithmetic for one plot: its built-up area, the three ranges against it, the lines a quote must itemise and the adders. Start from yours: 60 · 90 · 120 · 162 · 200 · 250 · 290 · 300 · 500 · 1,000 · 2,000 · 4,000 sqm. The method and all twelve in one table: cost guide.

Construction quotes: frequently asked questions

How do I check whether a construction quote is complete?
Read it against the lines a house actually needs: structure, masonry, plaster, flooring, doors and windows, electrical, plumbing and sanitary, kitchen, waterproofing, boundary wall, water tanks, septic or sewer connection, soil test, BPMS sanction and architect, the completion certificate and GST. Then check four terms: the area basis (built-up, carpet or super), the area against what your plot may legally have, the escalation clause, and the payment terms (our contractor-vetting guide notes that more than roughly 30 to 40 per cent upfront is widely treated as a red flag). The checker above runs all of it in your browser and lists what is missing and why it matters.
What construction rate per sq ft is published for Greater Noida and Noida in 2026?
Three publishers print ranges per sq ft of built-up area. Aarna Constructions, Greater Noida: Rs 1,650 basic to Rs 2,100 to 2,400 and above for premium (updated 7 November 2026; GST extra; land, government fees, boundary wall and interiors usually outside). Bajaj Finance, Noida: Rs 1,400 to 3,000, economy to premium (no date on the page, read 11 November 2026; approval, architect and soil-testing fees additional). BrickNBolt, Noida: Rs 1,900 to 4,500 overall and Rs 1,300 to 2,000 for grey structure (updated 9 June 2026; design and approval fees, waterproofing, soil testing and the boundary wall excluded). This page does not call any rate fair or unfair: it shows where a quoted rate sits against each range, with what each range leaves out.
My builder quoted per sq ft of super area or carpet area. How do I compare it?
Convert it to built-up area first, because the published ranges are per sq ft of built-up area. A rate on super area is charged on more square feet than the house has, so its built-up equivalent is higher; a rate on carpet area is charged on fewer, so its equivalent is lower. The checker assumes carpet area is 80 per cent of built-up area and super area 125 per cent of it. Those two ratios are our working assumptions, not published figures, and you can edit both to match your drawing. Ask the builder to restate the quote on built-up area and to list which areas it counts: stilt, basement, balconies, staircase and terrace.
Should a construction quote have an escalation clause?
Ask which kind it has. With none, the price is fixed for the agreed scope, which holds only if the specification is named line by line. A capped clause limits what material moves can add to an agreed percentage; ask for the cap, the index it tracks and the base date. An open clause passes every steel and cement move to you without a ceiling. Aarna Constructions puts structure, where steel and cement sit, at 40 to 45 per cent of total cost (7 November 2026), which is the share of a quote an open clause leaves exposed. For reference, TMT bar in New Delhi listed at Rs 55 to 58 per kg by size on 11 November 2026 (easeInfra), and Aarna states PPC cement at Rs 305 to 325 a bag and Fe500 TMT at Rs 56 to 65 per kg, GST extra (7 November 2026).
How much advance should I pay a construction contractor?
Market convention in India is a modest mobilisation advance, commonly cited at around 10 to 25 per cent, with everything after it released against completed, verified stages; requests for more than roughly 30 to 40 per cent upfront are widely treated as a red flag. The market-convention sequence runs six stages: agreement, foundation and plinth, RCC structure, brickwork and plaster, finishing and handover, with a small retention commonly held until the snag list clears. Both points are from our contractor-vetting guide, which compiles published construction-agreement and contractor-hiring guides; they are market context, not a statement of Vidastu’s terms.
Can a quote charge for more area than my YEIDA plot allows?
The house itself cannot exceed the plot’s FAR area under Table 1 of the YEIDA Building Regulations 2010: on a 200 sqm plot that is 360 sqm (3,875 sq ft) across all floors, with 75 per cent ground coverage (200 sqm plot cost section). A quote can still bill more built area than that, because a stilt floor (FAR-free on plots of 112 sqm and above), a single basement up to the ground coverage and balconies up to 1.5 m wide sit outside FAR. If the area on a quote is above your plot’s FAR area, ask it to list which of those areas it counts and at what rate.
Does this checker send my quote anywhere?
No. Every calculation runs in your browser and nothing is sent while you use it. Only if you fill in the form below it, tick the consent box and submit does a short summary of your check reach the construction desk, so the itemised quote you asked for can be prepared against it.

Talk to the construction desk

Get an itemised Vidastu quote against this one

Send your name and number and the summary of this check comes with it. We walk your plot free and give one binding, itemised fixed quote, line for line against the one you hold, so you can compare like with like.

Your check summary goes with this request.

Call +91 95404 45300

Your number goes to the construction desk, not a call-centre.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Disclaimer: Vidastu Developers Pvt. Ltd., the construction entity on this page, is not itself RERA-registered and files and executes YEIDA building plans as a contractor. This checker reads your own inputs in your browser: it is not a valuation, not a quote and not a Vidastu rate, and it makes no claim that any builder, Vidastu included, charges more or less than another. Published per-sq-ft ranges and material prices are as their publishers print them, with the dates shown; areas are our indicative arithmetic on Table 1 of the YEIDA Building Regulations 2010; the carpet and super ratios are our stated assumptions. Your allotment letter, lease deed, YEIDA-issued site plan, sector zonal plan and the BPMS sanction govern your own plot. General guidance, not legal advice.