What does “fixed price” actually lock?
The contract states one total number for the agreed scope, plus a per-item rate card. That number does not move for market reasons. It moves only if you change the scope — add a floor, upgrade a finish — and any change is re-quoted in writing before work continues.
What if cement or steel prices rise mid-build?
That risk is ours, not yours. Once the contract is signed, material inflation inside the agreed scope is absorbed by Vidastu Build. This is the point of a fixed quote — not a teaser rate that gets renegotiated at slab level.
How long does building-plan approval take?
We file it for you, in-house, with a Council of Architecture-registered architect. Straightforward residential files typically clear scrutiny in a few weeks. You sign documents; we run the process.
What does Vaastu integration cover?
Every Vidastu home — every package — gets the same Vaastu expertise: room placement is set with our Vaastu consultant before structural drawings are made, so compliance is built into the plan rather than patched on later.
How do I see my build's progress?
Photos and videos from your site land on your WhatsApp daily — structure, material, progress. No app, no login. Question anything; the delivery lead answers it.
How are payments structured?
Payments are milestone-linked: a schedule in the contract ties each payment to a completed, inspectable stage — foundation, slabs, brickwork, finishes, handover. You never pay ahead of the work. The exact stage percentages are printed in the contract before you sign.
What does the structural warranty cover?
The structure — foundation and RCC frame — against structural defects for ten years (fifteen on the Luxe package), in writing at handover. Finishes and fittings carry their manufacturers' warranties, listed item by item in your handover file.
What exactly does my quote include?
Your quote comes with a line-by-line inclusion sheet for the package you choose — every item that is in, in writing, before you sign. Anything outside it is discussed and priced with you first; nothing is assumed.
How does the completion/occupancy certificate work?
Your authority requires a completion/occupancy certificate for legal occupancy, utilities, loans and resale. We file it as part of the package — drawings, as-built compliance and the application — and hand over keys with the paperwork moving, not as an afterthought left to you.