Is YEIDA Sector 24A a confirmed, RERA-registered residential sector?
Direct answer: yes. Sector 24A is a dedicated RERA-registered residential plot sector, launched by YEIDA in late 2024. The scheme (UPRERAPRJ653132/10/2024) covers 451 plots in plots from 120 to 260 sqm on a 90-year lease. Around 17.5% of plots are reserved for farmers whose land was acquired; 82.5% went to the general category via a draw of lots held in December 2024.
The sector is part of YEIDA’s wider urban township vision for the Jewar corridor: residential plots integrated with civic amenities, green zones and commercial pockets in a single master plan. Work on internal roads, utilities and drainage is underway.
451 RERA-registered plots, 120 to 260 sqm, 90-year lease: the newest dedicated residential scheme on the Yamuna Expressway near Jewar Airport.
What plot sizes exist in Sector 24A, and what can each hold?
Sector 24A is a compact-plot sector: the five sizes (120 to 260 sqm) are well-suited to efficient 2 to 4 BHK independent homes. These are smaller than the 300 to 4000 sqm plots in Sector 20, which means the design focus is on floors within FAR rather than a wide ground floor. On a 120 sqm plot the typical outcome is a tight G+1 or G+2; on a 200 sqm plot you have room for a small forecourt or sit-out. Either way, decoding the exact sanctioned coverage and FAR for your plot under YEIDA byelaws is a design-stage task; we handle it.
| Plot size | Typical home type | Likely floors within FAR | Parking note |
|---|---|---|---|
| 120 sqm | 2 to 3 BHK compact home | G+1 or G+2 | Surface or stilt |
| 162 sqm | 3 BHK independent home | G+1 or G+2 | Stilt or covered |
| 200 sqm | 3 to 4 BHK home with forecourt | G+2 | Covered + visitor |
| 250 to 260 sqm | 4 BHK home or duplex | G+2 or G+3 | Double covered |
Want to know exactly what your plot can hold? Send your plot size on WhatsApp and we’ll walk you through the sanctioned floors and built-up area on the call, then give you one binding, itemised fixed quote after a free site walk. WhatsApp +91 95404 45300 →
What it costs to build in YEIDA Sector 24A
Short answer: what a house in Sector 24A costs follows from the area your plot size allows, so it is worked out plot by plot, not from a generic per-sq-ft rate. For the five Sector 24A plot sizes (120, 162, 200, 250 and 260 sqm), all with their own size guide, the table gives the Table 1 band’s maximum ground coverage and FAR, the built-up area of a G+1 and a G+2 house, and a link to that size’s cost build-up.
| Plot size | Max coverage, FAR | G+1 built-up area | G+2 built-up area | Cost |
|---|---|---|---|---|
| 120 sqm | 75 per cent, FAR 1.80 | 180 sqm (1,938 sq ft) | 216 sqm (2,325 sq ft) | cost build-up |
| 162 sqm | 75 per cent, FAR 1.80 | 243 sqm (2,616 sq ft) | 291.6 sqm (3,139 sq ft) | cost build-up |
| 200 sqm | 75 per cent, FAR 1.80 | 300 sqm (3,229 sq ft) | 360 sqm (3,875 sq ft) | cost build-up |
| 250 sqm | 75 per cent, FAR 1.80 | 375 sqm (4,036 sq ft) | 450 sqm (4,844 sq ft) | cost build-up |
| 260 sqm | 75 per cent, FAR 1.80 | 390 sqm (4,198 sq ft) | 468 sqm (5,038 sq ft) | cost build-up |
Coverage and FAR: Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010, for each plot’s size band (Table 1, transcribed). Built-up area: as worked out on each size page, at 1 sqm = 10.7639 sq ft; G+2 is three full floors or the FAR cap, whichever is smaller. A basement, balconies up to 1.5 m wide and, on plots of 112 sqm and above, a stilt floor sit outside FAR but are still built, so ask any quote to state the area it charges on.
How each cost build-up works. On each size page, the per-sq-ft ranges three publishers print for Greater Noida and Noida (Aarna Constructions, updated 7 November 2026; Bajaj Finance, no date on the page, read 11 November 2026; BrickNBolt, updated 9 June 2026) are applied to that plot’s G+1 and G+2 area, with what each range leaves out: approval fees and the boundary wall sit outside all three. None of the ranges is specific to YEIDA sectors, and none of it is a Vidastu rate. Vidastu’s price for your Sector 24A plot comes as one binding, itemised fixed quote after a free site walk; if a builder has already priced your plot, you can check a quote you already have line by line, and the cost guide sets out the plot-by-plot method in full.
What does Vidastu build in YEIDA Sector 24A?
Turnkey homes
Construction on your Sector 24A plot: designed within your plot’s FAR, built to a completion certificate, on a written milestone contract.
Approvals, in-house
Drawings by a CoA-registered architect, online BPMS sanction and the completion certificate, handled as part of every build.
How the 5-stage build runsRenovation & interiors
Additions, modernisation and full interior fit-out for existing homes in Sector 24A and the wider Yamuna Expressway belt.
NRI remote build
Build your Sector 24A home from abroad with regular photo and video updates and milestone-linked payments, no need to be on-site.
Which clock is yours. For Sector 24A’s 2024-scheme allottees, the RPS-08(A)/2024 brochure gives three years from the execution of the lease deed to build and obtain the occupancy certificate (clause 14), and says YEIDA offers possession after completing development, approximately five years after allotment (clause 13(iv)). The common 31 December 2026 date is for earlier allottees whose lease deeds are already executed. After your own three years, extension charges apply. The map must be sanctioned on BPMS before the build can start.
Vidastu Developers Pvt. Ltd. is a registered construction firm (CIN U68200UP2023PTC192378) with UP-RERA-registered property advisory via sister brand Vidastu Advisory (Agent UPRERAAGT000309/01/2026), whose Director Ravi Shankar Sharma has built in Greater Noida since 2000, with delivery led by Director Vidit Kaushik (BITS Pilani), the same team behind Vidastu’s 4.8★-rated property advisory. We serve the full Yamuna Expressway corridor and Greater Noida construction projects. We work only on a written contract, and once your build starts, you get photo and video updates on WhatsApp, and can visit an active Vidastu site before you sign.
How the build runs in Sector 24A: five stages and a clear sequence
- Design & layout. A CoA-registered architect plans within your plot’s ground coverage and FAR: floors, rooms, parking, Vaastu orientation. On compact 120 to 200 sqm plots, vertical efficiency is the key design lever.
- YEIDA map approval. The building plan is filed online via the BPMS portal and cleared through Smart-DCR scrutiny, in-house, as part of every build.
- Structure. Foundation, RCC frame, brickwork and slabs to the sanctioned design, built to the structural-stability certificate.
- Finishes & interiors. Plaster, flooring, electrical, plumbing, paint and fit-out to the finish level priced in your quote (Essential, Premium or Luxe).
- Completion & handover. We assist with the YEIDA completion/occupancy certificate (needed for utilities, loans, registry and resale), then hand over the keys. A turnkey home runs on dated milestones fixed in the written contract.
Payments are stage-wise: 10% on agreement & design sign-off, 20% at foundation & plinth, 35% at RCC structure & brickwork, 25% at finishes, 10% at handover (indicative split; exact milestones fixed in your written contract).
Where is YEIDA Sector 24A, and how close is it to Jewar Airport?
Sector 24A is in Gautam Buddh Nagar on the Yamuna Expressway, in the Noida International Airport (Jewar) corridor. It lies in the same master-plan zone as Sectors 22D and 22E, the belt south-east of Greater Noida along the expressway. The planned Aqua Line metro extension and a pod-taxi link to the airport and Film City are set to serve this corridor.
Noida International Airport (Jewar)
Sector 24A is in the airport-proximity zone that makes the Yamuna Expressway corridor one of UP’s highest-demand residential belts.
Expressway access
Direct Yamuna Expressway connectivity to Greater Noida and Agra, plus upcoming metro access from the Aqua Line extension.
Civic amenities planned
The Sector 24A master plan integrates green zones, civic amenities and commercial pockets alongside the residential plots.
Sector 24A construction FAQ
Do you work as a construction contractor near me in YEIDA Sector 24A?
Is YEIDA Sector 24A a genuine residential sector?
What plot sizes are available in YEIDA Sector 24A?
How much can I build on a Sector 24A plot (FAR and coverage)?
What does it cost to build a house in YEIDA Sector 24A?
When must I complete construction on my Sector 24A plot?
What are the construction payment stages?
I’m an NRI. Can you manage a Sector 24A build remotely?
What are the Vidastu Build packages?
Explore more
Yamuna Expressway construction cost guide 2026
What drives your build cost on the corridor, and why we price it on call.
YEIDA deadline 31 Dec 2026: the working plan
Live countdown, the 6-step backward checklist and what missing it costs.
How to hire a contractor
The 6-point vetting checklist, contract clauses and safe payment stages; use it on every quote, including ours.
Vidastu Build: the three packages
Essential, Premium and Luxe: what each includes, priced on call after a free site walk.
Building in YEIDA Sector 22D
The premium airport-belt sector: where Eldeco, ATS & Migsun launched.
Building in YEIDA Sector 20
The dedicated residential sector: larger 300 to 4000 sqm plots, full family homes.
House Construction Near Jewar Airport
The wider Jewar airport-corridor belt: YEIDA sectors racing the completion deadline.
यमुना एक्सप्रेसवे निर्माणकर्ता (Hindi)
यह पेज हिंदी में पढ़ें।
Best construction company in Greater Noida & Yamuna Expressway
The neutral 8-point checklist for vetting any builder before you sign, including us.
Also building in: Sector 15C · Sector 16 · Sector 17 · Sector 18 · Sector 20 · Sector 22D · Gaur Yamuna City · Greater Noida · Jewar Airport
Plot size guides: 120 sqm · 162 sqm · 200 sqm · 250 sqm · 260 sqm
Got a plot in YEIDA Sector 24A?
Send your plot size. Get a plan.
Send your plot size and the floors you want. We’ll share one binding, itemised fixed quote, a clear timeline to beat the 31 Dec 2026 deadline, and a nearby site you can visit before you sign.
Call the desk · +91 95404 45300Or leave your number below; the delivery lead calls you back, not a call centre.
Got it. The delivery lead is on it.
The delivery lead will call you within 24 hours. Opening WhatsApp as confirmation…
Vidastu Build, three packages: Essential · Premium · Luxe, all Vaastu-aligned by design. Priced on call: one binding, itemised fixed quote after a free site walk. See what each package includes →