Is YEIDA Sector 17 a confirmed residential sector?
Direct answer: yes. YEIDA's residential-plot page names Sector 17 as one of its officially designated residential sectors, alongside Sectors 16, 18, 20 and 22. YEIDA has allotted individual house plots there directly.
Sector 17 was one of five sectors (16, 17, 18, 20 and 22D) in RPS-05/2021 (draw 10 March 2022) and again in RPS-06/2022 (draw 18 November 2022), at ₹17,800 per sqm for 120 to 200 sqm plots and ₹17,400 above 200 sqm in the first, and ₹18,510 per sqm in the second, per clause 4 of each scheme brochure. In RPS-07/2023, YEIDA allotted 1,184 residential plots shared across Sectors 16, 17 and 20, sized from 60 sqm up to 2,000 sqm, at a base rate of ₹24,600 per sqm; applications ran 8 August to 1 September 2023, with the lottery draw held 18 October 2023. None of the later scheme brochures we read lists Sector 17: RPS-08/2024 covered Sectors 16, 18, 20 and 22D, RPS-08(A)/2024 covered Sector 24A, and RPS-10/2026 covered Sectors 15C, 18 and 24A, so confirm your own scheme and rate on your allotment letter.
One important distinction: Sector 17 also has a separate Residential Group Housing allotment track for large, multi-acre developer parcels (reported at 11,513 to 24,282 sqm, allotted via e-auction); this is builder/apartment-scale land, not the individual house-construction plots this page covers. If you're unsure which category your plot falls under, send your allotment letter on WhatsApp and we'll confirm.
We did not find a verified separate scheme naming “Sector 17A” in this research pass; if you hold a plot referenced as 17A, verify it directly against the YEIDA GIS portal before relying on any secondary listing.
Sector 17 is officially recognised by YEIDA and has a dated allotment history in RPS-05/2021, RPS-06/2022 and RPS-07/2023.
What plot sizes does YEIDA Sector 17 have?
Individual house plots in Sector 17 were allotted in the 60 to 2,000 sqm range under RPS-07/2023, a scheme total shared across Sectors 16, 17 and 20, so the exact per-sector breakdown isn't published separately; confirm your own plot's size and category from your allotment letter. On the smaller, more common sizes (60 to 200 sqm), owners typically build a compact G+1 or G+2 independent home within sanctioned FAR.
Keep the two Sector 17 land tracks separate: the individual house-plot track above is what Vidastu builds on. A separate Residential Group Housing track allots much larger multi-acre parcels (reported 11,513 to 24,282 sqm) to developers for apartment projects, via e-auction, not a track an individual plot owner would hold.
Want to know exactly what your plot can hold? Send your plot size on WhatsApp and we’ll walk you through the sanctioned floors and built-up area, then give you one binding, itemised fixed quote after a free site walk. WhatsApp +91 95404 45300 →
Scheme details per 99acres.com's YEIDA scheme-history coverage; no later YEIDA scheme brochure we read lists Sector 17. RPS-07/2023 coverage →
What it costs to build in YEIDA Sector 17
Short answer: what a house in Sector 17 costs follows from the area your plot size allows, so it is worked out plot by plot, not from a generic per-sq-ft rate. For each plot size from 60 to 2,000 sqm with its own size guide (the RPS-07/2023 sizes were published as a total shared with Sectors 16 and 20, so confirm yours from your allotment letter), the table gives the Table 1 band’s maximum ground coverage and FAR, the built-up area of a G+1 and a G+2 house, and a link to that size’s cost build-up.
| Plot size | Max coverage, FAR | G+1 built-up area | G+2 built-up area | Cost |
|---|---|---|---|---|
| 60 sqm | 75 per cent, FAR 1.80 | 90 sqm (969 sq ft) | 108 sqm (1,163 sq ft) | cost build-up |
| 90 sqm | 75 per cent, FAR 1.80 | 135 sqm (1,453 sq ft) | 162 sqm (1,744 sq ft) | cost build-up |
| 120 sqm | 75 per cent, FAR 1.80 | 180 sqm (1,938 sq ft) | 216 sqm (2,325 sq ft) | cost build-up |
| 162 sqm | 75 per cent, FAR 1.80 | 243 sqm (2,616 sq ft) | 291.6 sqm (3,139 sq ft) | cost build-up |
| 183 sqm | 75 per cent, FAR 1.80 | 274.5 sqm (2,955 sq ft) | 329.4 sqm (3,546 sq ft) | cost build-up |
| 184 sqm | 75 per cent, FAR 1.80 | 276 sqm (2,971 sq ft) | 331.2 sqm (3,565 sq ft) | cost build-up |
| 200 sqm | 75 per cent, FAR 1.80 | 300 sqm (3,229 sq ft) | 360 sqm (3,875 sq ft) | cost build-up |
| 223 sqm | 75 per cent, FAR 1.80 | 334.5 sqm (3,601 sq ft) | 401.4 sqm (4,321 sq ft) | cost build-up |
| 250 sqm | 75 per cent, FAR 1.80 | 375 sqm (4,036 sq ft) | 450 sqm (4,844 sq ft) | cost build-up |
| 260 sqm | 75 per cent, FAR 1.80 | 390 sqm (4,198 sq ft) | 468 sqm (5,038 sq ft) | cost build-up |
| 290 sqm | 75 per cent, FAR 1.80 | 435 sqm (4,682 sq ft) | 522 sqm (5,619 sq ft) | cost build-up |
| 300 sqm | 75 per cent, FAR 1.80 | 450 sqm (4,844 sq ft) | 540 sqm (5,813 sq ft) | cost build-up |
| 500 sqm | 65 per cent, FAR 1.80 | 650 sqm (6,997 sq ft) | 900 sqm (9,688 sq ft) | cost build-up |
| 1,000 sqm | 55 per cent, FAR 1.50 | 1,100 sqm (11,840 sq ft) | 1,500 sqm (16,146 sq ft) | cost build-up |
| 2,000 sqm | 45 per cent, FAR 1.50 | 1,800 sqm (19,375 sq ft) | 2,700 sqm (29,063 sq ft) | cost build-up |
Coverage and FAR: Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010, for each plot’s size band (Table 1, transcribed). Built-up area: as worked out on each size page, at 1 sqm = 10.7639 sq ft; G+2 is three full floors or the FAR cap, whichever is smaller. A basement, balconies up to 1.5 m wide and, on plots of 112 sqm and above, a stilt floor sit outside FAR but are still built, so ask any quote to state the area it charges on.
How each cost build-up works. On each size page, the per-sq-ft ranges three publishers print for Greater Noida and Noida (Aarna Constructions, updated 7 November 2026; Bajaj Finance, no date on the page, read 11 November 2026; BrickNBolt, updated 9 June 2026) are applied to that plot’s G+1 and G+2 area, with what each range leaves out: approval fees and the boundary wall sit outside all three. None of the ranges is specific to YEIDA sectors, and none of it is a Vidastu rate. Vidastu’s price for your Sector 17 plot comes as one binding, itemised fixed quote after a free site walk; if a builder has already priced your plot, you can check a quote you already have line by line, and the cost guide sets out the plot-by-plot method in full.
Get your Sector 17 quote on WhatsApp +91 95404 45300 →
What does Vidastu build in YEIDA Sector 17?
Turnkey homes
Construction on your Sector 17 plot: designed within your plot’s FAR, built to a completion certificate, on a written milestone contract.
Approvals, in-house
Drawings by a CoA-registered architect, online BPMS sanction and the completion certificate, handled as part of every build. How the 5-stage build runs →
Renovation & interiors
Additions, modernisation and full interior fit-out for existing homes in Sector 17 and the wider Yamuna Expressway belt.
NRI remote build
Build your Sector 17 home from abroad with weekly photo and video updates from your site and milestone-linked payments, no need to be on-site.
Vidastu Developers Pvt. Ltd. is a registered construction firm (CIN U68200UP2023PTC192378) with UP-RERA-registered property advisory via sister brand Vidastu Advisory (Agent UPRERAAGT000309/01/2026), whose Director Ravi Shankar Sharma has built many homes in Greater Noida since 2000, with delivery led by Director Vidit Kaushik (BITS Pilani), the same team behind Vidastu’s property advisory, rated 4.8 across 58 Google reviews as on 6 October 2026. We serve the full Yamuna Expressway corridor and Greater Noida construction projects. We work only on a written contract, and once your build starts, you get weekly photo and video updates from your site on WhatsApp, and can visit an active Vidastu site before you sign.
How the build runs in Sector 17: five stages and a clear sequence
- Design & layout. A CoA-registered architect plans within your plot’s ground coverage and FAR: floors, rooms, parking, Vaastu orientation.
- YEIDA map approval. The building plan is filed online via the BPMS portal and cleared through Smart-DCR scrutiny, in-house, as part of every build.
- Structure. Foundation, RCC frame, brickwork and slabs to the sanctioned design, built to the structural-stability certificate.
- Finishes & interiors. Plaster, flooring, electrical, plumbing, paint and fit-out to the finish level priced in your quote (Essential, Premium or Luxe).
- Completion & handover. We assist with the YEIDA completion/occupancy certificate (needed for utilities, loans, registry and resale), then hand over the keys. A turnkey home runs on dated milestones fixed in the written contract.
Payments are stage-wise: 10% on agreement & design sign-off, 20% at foundation & plinth, 35% at RCC structure & brickwork, 25% at finishes, 10% at handover (indicative split; exact milestones fixed in your written contract).
Where is YEIDA Sector 17 on the Yamuna Expressway corridor?
Sector 17 sits within YEIDA's Yamuna Expressway plotted-residential belt in Gautam Buddh Nagar, in the Noida International Airport (Jewar) belt, alongside neighbouring Sectors 16, 18 and 20. Exact plot boundaries and access roads for your specific plot are on the layout plan attached to your allotment letter; we walk the site with you before quoting.
Map shows the broader Sector 17 area; exact plot layout is in your allotment letter and the YEIDA portal.