UP-RERA Agent UPRERAAGT000309/01/2026  |  GST Registered  |  WhatsApp +91 95404 45300

Yamuna Expressway · YEIDA BPMS Portal

YEIDA Building Plan Approval & BPMS Map Sanction for House Construction

Fully digital since August 2024 BPMS + Smart-DCR 31 Dec 2026 CC deadline

Vidastu Build packages, all Vaastu-aligned by design — priced on call after a free site walk · 10-yr structural warranty (15 on Luxe) · UP-RERA UPRERAAGT000309/01/2026

Since 1 August 2024, the only legal route to a sanctioned building map for a YEIDA plot is the BPMS (Building Plan Management System) portal at bpms.yamunaexpresswayauthority.com. No counter submissions, no manual files — all map sanctions, from first application to digital sanction letter, go through this system. Vidastu handles the entire chain: empanelled CoA-registered architect → BPMS Smart-DCR submission → map sanction → construction → Completion Certificate — as one continuous, managed service. UP-RERA registered, Greater Noida HQ, building across the Yamuna Expressway corridor.

Time is the constraint: sanction typically takes 4–8 weeks after a clean submission; construction is 7–14 months; together the window is closing fast — mid-2026 is realistically the last point to start and still secure a Completion Certificate before 31 December 2026. We price every build on call — one binding, itemised fixed quote after a free site walk, never a public rate card.

Updated June 2026

days left · free construction window closes 31 Dec 2026

YEIDA’s 87th board meeting (November 2025) extended the free construction deadline to 31 December 2026. Getting your BPMS map sanction is the first step on the critical path — every week spent waiting on the naksha is a week lost from the build window. Sanction → build → CC can take the full window if you’re starting now.

See the full deadline plan & backward checklist →

What BPMS is, and why it is now the only route

Direct answer: BPMS (Building Plan Management System) is YEIDA’s fully digital portal for building plan sanction. From 1 August 2024, it is the only legally valid channel — there is no counter or offline route left. Before this shift, allottees submitted physical drawings at the YEIDA office and waited months for scrutiny. The BPMS replaced that entirely: your architect prepares drawings, uploads them to the portal via your allottee PIMS credentials, pays fees online and tracks progress digitally. The authority officers review, raise queries and issue the sanction letter all within the same system.

The engine inside BPMS is called Smart-DCR — an automated rules-checker that reads the submitted CAD file, checks colour codes, layers, geometry, and closed polylines against the YEIDA building byelaws, and produces a scrutiny report. If your drawings are clean and compliant, the report passes to human review. If they are not, the file bounces back for correction. This is why having a YEIDA-empanelled architect who knows Smart-DCR’s requirements is not optional — a poorly layered drawing fails the pre-check automatically.

BPMS has been the sole sanction route since 1 August 2024. If your naksha isn’t filed there, it is not filed.

Why a YEIDA-empanelled architect is not optional

Short answer: BPMS only allows submissions from architects who are registered with both the Council of Architecture (CoA) and YEIDA. You select your architect from a dropdown within the portal — unlisted architects cannot submit. This means the architect must have completed YEIDA’s own registration process (separate from their CoA licence) to appear in that list. A general architect, however experienced, cannot file your BPMS application if they are not empanelled with YEIDA.

The empanelment requirement exists because YEIDA holds the empanelled architect jointly accountable for the accuracy of the drawings and the compliance of the built structure with the sanctioned plan. At the Completion Certificate stage, it is the same empanelled architect who certifies that the structure matches the approved naksha. The chain of accountability runs from sanction to CC through one registered professional.

Vidastu works with CoA-registered and YEIDA-empanelled architects on every build. The architect’s work — design, Smart-DCR-compatible drawings, BPMS filing, scrutiny responses — is included as part of the Vidastu Build service, not an add-on you arrange separately. WhatsApp us to confirm empanelment for your sector →

Documents you need for the BPMS application

All documents are uploaded digitally through BPMS — no physical submissions. The checklist below reflects the standard requirements; always verify the current list on the official BPMS portal before applying, as YEIDA updates requirements periodically.

Document Notes
Allotment letter Required Original or certified copy; confirms official allotment from YEIDA
Lease deed Required if executed Required if your possession has been handed over and lease deed registered
Identity proof (allottee) Required Aadhaar, passport or voter ID of the allottee
PAN card Required For financial and tax verification
PIMS payment clearance Required Proof all YEIDA dues are cleared; BPMS fees must also be paid via PIMS
YEIDA-issued site plan Required The authority-demarcated plot layout from your allotment file
Architect’s drawings (Smart-DCR format) Required CAD file prepared by a CoA + YEIDA empanelled architect; must pass automated pre-check
Structural stability certificate Required Signed by a licensed structural engineer for the proposed design
Self-undertaking / declaration Required Allottee certifies accuracy of submitted information
Power of attorney NRI / absent owners Required if someone else is representing the allottee; must be duly notarised / apostilled

Vidastu prepares and coordinates all of the above for owners who engage us for a full build. If you only need help assembling the documents for a self-managed filing, WhatsApp us and we’ll point you in the right direction.

FAR, ground coverage and setbacks — the basics for YEIDA residential plots

What you can build on your YEIDA plot is defined by three numbers in the byelaws schedule: Floor Area Ratio (FAR), ground coverage percentage, and mandatory setbacks — all of which scale with plot size. Here is what the byelaws indicate for common plot categories; confirm the exact figures from the current YEIDA byelaws PDF for your specific allotment category, as these are periodically revised:

Smaller plots — up to ~300 sqm

Smaller plots typically carry a higher FAR (around 1.8) and ground coverage of up to ~75% — comfortably enough for a full G+2 home. The exact figure for your plot category is read off the current byelaws before design begins.

Larger plots — around 1000 sqm+

Larger plots (around 1000 sqm) typically ease to a lower FAR (~1.5) and ground coverage nearer 55% — still ample room for a family villa with basement, stilt parking and a garden.

Setbacks — front, rear, side

For plots around 300 sqm, typical YEIDA setbacks are a front setback of around 4 m and side setbacks of around 2 m. Larger plots have proportionally larger setbacks. Open vehicle ramps are permitted in the side setback only. Canopy projections (up to 4.5 m × 2.4 m) are permitted in front or side setbacks where the front setback is 4.5 m or more. Exact setbacks for your plot category are confirmed against the byelaws at design stage.

Basement rules

A basement is permissible up to 2 metres from the adjacent plot boundary, subject to a structural stability certificate issued by a licensed structural engineer. The basement is generally excluded from FAR calculations when used for parking, utilities or storage — a meaningful bonus on larger plots.

What this means in practice: send your allotment letter and plot size to Vidastu and our empanelled architect will tell you — in one call — exactly how many floors, how much built-up area and what your basement can hold, all aligned with the current byelaws. WhatsApp +91 95404 45300 →

How BPMS map sanction, construction and the Completion Certificate work as one timeline

The map sanction, the build and the Completion Certificate are not three separate projects — they are three stages of one continuous timeline that must land inside the 31 December 2026 window. Here is how Vidastu sequences them:

  1. Design & site-walk — days 1–14. We visit your plot, confirm boundary and existing ground conditions, and the empanelled architect begins FAR/coverage calculations and floor plan concepts within your plot’s byelaw limits.
  2. Smart-DCR drawings & BPMS submission — weeks 2–4. The architect prepares CAD drawings in Smart-DCR-compatible format and submits via the BPMS portal using your PIMS credentials. Fees are paid online through BPMS. A clean submission triggers the automated pre-check and generates a scrutiny report.
  3. Map sanction — weeks 4–8. YEIDA officers review the scrutiny report. Queries (if any) are responded to by the architect through the portal. Target turnaround on a clean file is 15 working days; allow up to 8 weeks for back-and-forth. The digital sanction letter is issued by YEIDA through the same portal.
  4. Construction — months 2–14. Foundation, RCC frame, brickwork, finishes and interiors — all built to the sanctioned plan on a milestone contract. Site photos and video updates on WhatsApp at every stage.
  5. Completion Certificate — final 4–6 weeks. After handover, the empanelled architect inspects the built structure against the sanctioned naksha and submits the CC application through BPMS. YEIDA inspects and, if compliant, issues the CC. The CC is required for utilities, home loans, property registration and resale. Full deadline checklist →

End-to-end, a typical Vidastu Build takes 10–16 months from first site walk to CC. Engage us now to leave yourself the full window.

Vidastu Developers Pvt. Ltd. is UP-RERA-registered (Agent UPRERAAGT000309/01/2026), co-founded by Ravi Shankar Sharma (30+ years in construction and development) with delivery led by Vidit Kaushik (BITS Pilani, 2022) — the same team behind Vidastu’s 4.8★-rated property advisory.

NRI allottees: getting your map sanctioned from abroad

A significant share of YEIDA allottees are NRIs who received plots in earlier schemes and are now facing the 31 December 2026 deadline without having been on-site. The BPMS process is fully digital, which means neither you nor your representative needs to physically queue at the YEIDA office — but you do need a valid power of attorney for a local representative to act on your behalf in any in-person matters, and the architect handles all BPMS portal filings directly.

Vidastu’s NRI remote-build service covers the full chain: empanelled architect (BPMS-certified), POA coordination if needed, BPMS submission, construction milestone tracking with WhatsApp photo/video updates, and CC application at the end. You do not need to fly back for any stage except, optionally, the final handover. Full NRI build guide →

YEIDA building plan approval — FAQ

What is the YEIDA BPMS portal and do I have to use it?
BPMS (Building Plan Management System) is YEIDA’s fully online portal for submitting and tracking building plan sanction applications. Since 1 August 2024 it is the only official channel — no offline or manual submissions are accepted. You or your appointed architect log in at bpms.yamunaexpresswayauthority.com using your PIMS/CCP allottee credentials, attach drawings and documents, pay fees online, and receive the sanctioned plan digitally. Payments made outside BPMS are not accepted for sanctioning.
Do I need a YEIDA-empanelled architect to get my map sanctioned?
Yes. BPMS only accepts submissions from architects registered with both the Council of Architecture (CoA) and YEIDA. You pick from a dropdown of empanelled architects inside the portal. Vidastu works with empanelled CoA-registered architects on every build — the architect prepares drawings in Smart-DCR-compatible format, handles the BPMS submission, responds to scrutiny queries and obtains the sanction letter. This is in-house, as part of every Vidastu Build.
What is Smart-DCR and how does it check my building plan?
Smart-DCR is the automated rules-checking engine inside BPMS. It reads the architect’s CAD drawings — checking geometry, layers, colour codes, polylines and text — against YEIDA’s building byelaws. If the drawing passes the automated pre-check, a scrutiny report is generated and the application advances to YEIDA officers for approval. Drawings that don’t meet the format or byelaw limits are flagged immediately, so the architect must correct and resubmit. Target turnaround after a clean submission is 15 working days.
What documents does a YEIDA allottee need for the BPMS building plan application?
Key documents: allotment letter, lease deed (if executed), identity proof, PAN card, PIMS payment clearance, YEIDA-issued site plan, architect’s Smart-DCR-format drawings, structural stability certificate, and a self-undertaking. NRI allottees also need a notarised/apostilled power of attorney. All documents are uploaded digitally through BPMS — always verify the current checklist on the official portal before applying.
What FAR and ground coverage can I build on a YEIDA residential plot?
FAR and ground coverage scale with plot size under YEIDA byelaws. Smaller plots (up to ~300 sqm) typically have FAR of 1.8 and ground coverage up to 75%; larger plots (~1000 sqm) have FAR around 1.5 and coverage around 55%. Decoding this for your specific allotment category is what our empanelled architect does at the design stage. WhatsApp us your plot size and we’ll tell you what fits.
What setbacks does YEIDA require on residential plots?
Setbacks vary by plot size. For plots around 300 sqm, the typical front setback is around 4 m and side setbacks around 2 m. Open vehicle ramps are only permitted in the side setback. Canopy projections (4.5 m × 2.4 m) are allowed in front or side setbacks on plots with a front setback of 4.5 m or more. Basements may extend to within 2 m of the adjacent plot, with a structural stability certificate.
How does the BPMS approval tie into the 31 December 2026 CC deadline?
YEIDA requires a Completion Certificate (CC) by 31 December 2026. The full sequence — BPMS sanction (4–8 weeks) + construction (7–14 months) + CC application — can take 10–16 months. That means every week spent without a sanctioned naksha is a week deducted from your build window. See the full deadline backward checklist →
Can Vidastu get my map sanctioned and then build the house too?
Yes. This is our standard service — we do not separate approvals from construction. An empanelled architect on our team prepares drawings, handles BPMS submission and Smart-DCR clearance, and obtains the sanction. Construction then runs on a written milestone contract through five stages to handover, and we assist with the CC at the end. NRI owners can manage the entire sequence remotely. WhatsApp +91 95404 45300 to begin →

Explore more

Also building in: Sector 18 · Sector 20 · Sector 22D · Gaur Yamuna City · Greater Noida · Jewar Airport

Ready to get your YEIDA naksha sanctioned?

Send your allotment details, plot size and the floors you want. We’ll confirm what you can build, line up the empanelled architect and put one binding, itemised fixed quote in writing — covering sanction, construction and CC.

Or get a callback in 24 hours

The delivery lead calls you back — not a call centre.

Vidastu Build — three packages: Essential · Premium · Luxe, all Vaastu-aligned by design. Priced on call — one binding, itemised fixed quote after a free site walk, 10-yr structural warranty (15 on Luxe). See what each package includes →