Yamuna Expressway · YEIDA Sector 16

Home Construction in YEIDA Sector 16, Across Four Plot Schemes

Vidastu Developers Pvt. Ltd. (CIN U68200UP2023PTC192378) is a construction contractor (nirmaankarta) building turnkey homes, renovations and interiors for YEIDA Sector 16 plot owners, plan approvals handled in-house as part of every build. Sector 16 is one of the officially planned residential sectors on the Yamuna Expressway, named on YEIDA's residential-plot page, and its plots have been offered in four YEIDA plot schemes: RPS-05/2021 and RPS-06/2022 (each shared with Sectors 17, 18, 20 and 22D), RPS-07/2023 (1,184 plots shared with Sectors 17 and 20, sizes 60 to 2,000 sqm) and the RPS-08/2024 residual scheme (361 plots shared with Sectors 18, 20 and 22D, sizes 120 to 4,000 sqm). We build across Noida & NCR; HQ in Greater Noida, minutes from this corridor. Construction leads: +91 95404 45300.

UP-RERA UPRERAAGT000309/01/2026 RPS-05/2021 to RPS-08/2024 60 to 4,000 sqm plots

Updated 25 November 2026

YEIDA free construction window closes 31 Dec 2026

10,000+
allottees not built by Nov 2025
~1,100
functional certificates by then
5 to 8 mo
typical turnkey build

This corridor-wide window applies to allottees with an executed lease deed; your own three-year clock runs from the execution of your lease deed (clause 14 of the scheme brochure); confirm the date on your deed. See the full deadline brief & backward-planned checklist →

Source: Millennium Post: 87th YEIDA board coverage.

The corridor

Is YEIDA Sector 16 a confirmed residential sector?

Direct answer: yes. YEIDA's residential-plot page names Sector 16 as one of its officially designated residential sectors, alongside Sectors 17, 18, 20 and 22. Unlike some newer draw-only sectors, Sector 16 carries a real, dated allotment history across four YEIDA plot schemes.

Sector 16 was one of five sectors (16, 17, 18, 20 and 22D) in RPS-05/2021 (draw 10 March 2022) and again in RPS-06/2022 (draw 18 November 2022), at ₹17,800 per sqm for 120 to 200 sqm plots and ₹17,400 above 200 sqm in the first, and ₹18,510 per sqm in the second, per clause 4 of each scheme brochure. In RPS-07/2023, YEIDA allotted 1,184 residential plots shared across Sectors 16, 17 and 20, sized from 60 sqm up to 2,000 sqm, at a base rate of ₹24,600 per sqm; applications ran 8 August to 1 September 2023, with the lottery draw held 18 October 2023. Sector 16 then reappeared in RPS-08/2024, a residual scheme of 361 plots shared across Sectors 16, 18, 20 and 22D, sized 120 to 4,000 sqm at ₹25,900 per sqm, on a 90-year lease with a 10% one-time lease rent; applications ran 5 July to 5 August 2024, draw held 20 September 2024.

Property-market coverage also describes Sector 16 as a mixed-use sector, combining residential plots with commercial land; treat this framing as indicative and confirm your own plot's zoning against your allotment letter.

Four YEIDA plot schemes, from RPS-05/2021 to RPS-08/2024, have offered plots in Sector 16: a longer record than a sector offered in a single scheme.

Plot sizes

What plot sizes has YEIDA allotted in Sector 16?

Sector 16 has been offered in four YEIDA plot schemes; in the two most recent, plot sizes spanned 60 sqm to 4,000 sqm. The table below summarises the four schemes; the size distribution was published as a combined total across all sectors in each scheme, not sector-by-sector, so confirm your own plot's exact size and category from your allotment letter.

Scheme Sectors covered Plot sizes Rate Key dates
RPS-05/2021 16, 17, 18, 20, 22D Listed in the brochure (linked below) ₹17,800/sqm (120 to 200 sqm); ₹17,400/sqm (above 200 sqm) Draw 10 Mar 2022
RPS-06/2022 16, 17, 18, 20, 22D Listed in the brochure (linked below) ₹18,510/sqm Draw 18 Nov 2022
RPS-07/2023 16, 17, 20 (1,184 plots) 60 to 2,000 sqm ₹24,600/sqm Applications Aug to Sep 2023; draw 18 Oct 2023
RPS-08/2024 16, 18, 20, 22D (361 plots) 120 to 4,000 sqm ₹25,900/sqm Applications Jul to Aug 2024; draw 20 Sep 2024

On the common 120 to 300 sqm plots, owners typically build a compact G+1 or G+2 independent home within sanctioned FAR. On the larger 1,000 to 4,000 sqm modules from the 2024 scheme, there's room for a full family home with a basement, garden and multiple parking bays, the same larger-plot pattern as neighbouring Sector 20.

Want to know exactly what your plot can hold? Send your plot size on WhatsApp and we’ll walk you through the sanctioned floors and built-up area, then give you one binding, itemised fixed quote after a free site walk. WhatsApp +91 95404 45300 →

Scheme details per YEIDA's RPS-05/2021, RPS-06/2022 and RPS-08/2024 scheme brochures (rates from clause 4, read 15 November 2026) and 99acres.com's YEIDA scheme-history coverage. RPS-05/2021 brochure → · RPS-06/2022 brochure → · RPS-07/2023 coverage → · RPS-08/2024 brochure →

Cost

What it costs to build in YEIDA Sector 16

Short answer: what a house in Sector 16 costs follows from the area your plot size allows, so it is worked out plot by plot, not from a generic per-sq-ft rate. For each plot size from 60 to 4,000 sqm with its own size guide (Sector 16’s sizes were published as scheme totals shared with other sectors, so confirm yours from your allotment letter), the table gives the Table 1 band’s maximum ground coverage and FAR, the built-up area of a G+1 and a G+2 house, and a link to that size’s cost build-up.

Plot sizeMax coverage, FARG+1 built-up areaG+2 built-up areaCost
60 sqm75 per cent, FAR 1.8090 sqm
(969 sq ft)
108 sqm
(1,163 sq ft)
cost build-up
90 sqm75 per cent, FAR 1.80135 sqm
(1,453 sq ft)
162 sqm
(1,744 sq ft)
cost build-up
120 sqm75 per cent, FAR 1.80180 sqm
(1,938 sq ft)
216 sqm
(2,325 sq ft)
cost build-up
162 sqm75 per cent, FAR 1.80243 sqm
(2,616 sq ft)
291.6 sqm
(3,139 sq ft)
cost build-up
183 sqm75 per cent, FAR 1.80274.5 sqm
(2,955 sq ft)
329.4 sqm
(3,546 sq ft)
cost build-up
184 sqm75 per cent, FAR 1.80276 sqm
(2,971 sq ft)
331.2 sqm
(3,565 sq ft)
cost build-up
200 sqm75 per cent, FAR 1.80300 sqm
(3,229 sq ft)
360 sqm
(3,875 sq ft)
cost build-up
223 sqm75 per cent, FAR 1.80334.5 sqm
(3,601 sq ft)
401.4 sqm
(4,321 sq ft)
cost build-up
250 sqm75 per cent, FAR 1.80375 sqm
(4,036 sq ft)
450 sqm
(4,844 sq ft)
cost build-up
260 sqm75 per cent, FAR 1.80390 sqm
(4,198 sq ft)
468 sqm
(5,038 sq ft)
cost build-up
290 sqm75 per cent, FAR 1.80435 sqm
(4,682 sq ft)
522 sqm
(5,619 sq ft)
cost build-up
300 sqm75 per cent, FAR 1.80450 sqm
(4,844 sq ft)
540 sqm
(5,813 sq ft)
cost build-up
500 sqm65 per cent, FAR 1.80650 sqm
(6,997 sq ft)
900 sqm
(9,688 sq ft)
cost build-up
1,000 sqm55 per cent, FAR 1.501,100 sqm
(11,840 sq ft)
1,500 sqm
(16,146 sq ft)
cost build-up
2,000 sqm45 per cent, FAR 1.501,800 sqm
(19,375 sq ft)
2,700 sqm
(29,063 sq ft)
cost build-up
4,000 sqm40 per cent, FAR 1.003,200 sqm
(34,444 sq ft)
4,000 sqm
(43,056 sq ft)
cost build-up

Coverage and FAR: Regulation 24.1, Table 1 of the YEIDA Building Regulations 2010, for each plot’s size band (Table 1, transcribed). Built-up area: as worked out on each size page, at 1 sqm = 10.7639 sq ft; G+2 is three full floors or the FAR cap, whichever is smaller. A basement, balconies up to 1.5 m wide and, on plots of 112 sqm and above, a stilt floor sit outside FAR but are still built, so ask any quote to state the area it charges on.

How each cost build-up works. On each size page, the per-sq-ft ranges three publishers print for Greater Noida and Noida (Aarna Constructions, updated 7 November 2026; Bajaj Finance, no date on the page, read 11 November 2026; BrickNBolt, updated 9 June 2026) are applied to that plot’s G+1 and G+2 area, with what each range leaves out: approval fees and the boundary wall sit outside all three. None of the ranges is specific to YEIDA sectors, and none of it is a Vidastu rate. Vidastu’s price for your Sector 16 plot comes as one binding, itemised fixed quote after a free site walk; if a builder has already priced your plot, you can check a quote you already have line by line, and the cost guide sets out the plot-by-plot method in full.

What we build

What does Vidastu build in YEIDA Sector 16?

Turnkey

Turnkey homes

Construction on your Sector 16 plot: designed within your plot’s FAR, built to a completion certificate, on a written milestone contract.

In-house

Approvals, in-house

Drawings by a CoA-registered architect, online BPMS sanction and the completion certificate, handled as part of every build.

How the 5-stage build runs
Fit-out

Renovation & interiors

Additions, modernisation and full interior fit-out for existing homes in Sector 16 and the wider Yamuna Expressway belt.

Remote

NRI remote build

Build your Sector 16 home from abroad with weekly photo and video updates from your site and milestone-linked payments, no need to be on-site.

Vidastu Developers Pvt. Ltd. is a registered construction firm (CIN U68200UP2023PTC192378) with UP-RERA-registered property advisory via sister brand Vidastu Advisory (Agent UPRERAAGT000309/01/2026), whose Director Ravi Shankar Sharma has built many homes in Greater Noida since 2000, with delivery led by Director Vidit Kaushik (BITS Pilani), the same team behind Vidastu’s property advisory, rated 4.8 across 58 Google reviews as on 6 October 2026. We serve the full Yamuna Expressway corridor and Greater Noida construction projects. We work only on a written contract, and once your build starts, you get weekly photo and video updates from your site on WhatsApp, and can visit an active Vidastu site before you sign.

How the build runs in Sector 16: five stages and a clear sequence

  1. Design & layout. A CoA-registered architect plans within your plot’s ground coverage and FAR: floors, rooms, parking, Vaastu orientation.
  2. YEIDA map approval. The building plan is filed online via the BPMS portal and cleared through Smart-DCR scrutiny, in-house, as part of every build.
  3. Structure. Foundation, RCC frame, brickwork and slabs to the sanctioned design, built to the structural-stability certificate.
  4. Finishes & interiors. Plaster, flooring, electrical, plumbing, paint and fit-out to the finish level priced in your quote (Essential, Premium or Luxe).
  5. Completion & handover. We assist with the YEIDA completion/occupancy certificate (needed for utilities, loans, registry and resale), then hand over the keys. A turnkey home runs on dated milestones fixed in the written contract.

Payments are stage-wise: 10% on agreement & design sign-off, 20% at foundation & plinth, 35% at RCC structure & brickwork, 25% at finishes, 10% at handover (indicative split; exact milestones fixed in your written contract).

Location

Where is YEIDA Sector 16 on the Yamuna Expressway corridor?

Sector 16 sits within YEIDA's Yamuna Expressway plotted-residential belt in Gautam Buddh Nagar, in the Noida International Airport (Jewar) belt, alongside neighbouring Sectors 17, 18 and 20. Exact plot boundaries and access roads for your specific plot are on the layout plan attached to your allotment letter; we walk the site with you before quoting.

Map shows the broader Sector 16 area; exact plot layout is in your allotment letter and the YEIDA portal.

FAQ

Sector 16 construction FAQ

Is YEIDA Sector 16 a genuine residential sector?
Yes. YEIDA’s residential-plot page lists Sector 16 as one of its officially planned residential sectors, alongside Sectors 17, 18, 20 and 22. Sector 16 has been offered in four YEIDA plot schemes: RPS-05/2021 (draw 10 March 2022) and RPS-06/2022 (draw 18 November 2022), each covering Sectors 16, 17, 18, 20 and 22D; RPS-07/2023 (1,184 plots shared across Sectors 16, 17 and 20, sized 60 to 2,000 sqm); and RPS-08/2024 (361 residual plots shared across Sectors 16, 18, 20 and 22D, sized 120 to 4,000 sqm). It is described in property-market coverage as a mixed residential-and-commercial sector; verify your specific plot’s status and size on your allotment letter or the YEIDA portal.
What plot sizes has YEIDA allotted in Sector 16?
In the two most recent schemes covering Sector 16, plot sizes have ranged from 60 sqm up to 4,000 sqm. The 2023 scheme (RPS-07/2023) offered smaller plots from 60 to 2,000 sqm at a base rate of ₹24,600/sqm; the 2024 residual scheme (RPS-08/2024) offered 120 to 4,000 sqm modules at ₹25,900/sqm. Confirm your exact plot size and category from your own allotment letter; the size breakdown per individual sector was not published separately from the combined scheme totals.
How much can I build on a Sector 16 plot (FAR and coverage)?
Ground coverage and FAR on YEIDA plots are set by YEIDA byelaws and scale with plot size. On the common 120 to 300 sqm Sector 16 plots, that typically means a G+1 or G+2 independent home with stilt or surface parking; on the larger 1,000 to 4,000 sqm modules from the 2024 scheme, owners can plan a full family home with a basement and garden. We size the design to your plot’s exact sanctioned limits at the design stage. Send your plot size on WhatsApp and we’ll tell you what fits.
What does it cost to build a house in YEIDA Sector 16?
Work it out from your plot size, not a generic rate. For Sector 16 plot sizes from 60 to 4,000 sqm, the cost table on this page gives the G+1 and G+2 built-up area under Table 1, and each size’s cost build-up applies three dated published per-sq-ft ranges (Aarna Constructions, Bajaj Finance and BrickNBolt) to that area, with what each range leaves out. None of those ranges is a Vidastu rate: Vidastu’s price comes as one binding, itemised fixed quote after a free site walk, and the construction quote checker shows what any quote you already hold should itemise.
When must I complete construction on my Sector 16 plot?
YEIDA requires construction completed and a completion/occupancy certificate obtained within three years of your lease deed being executed (clause 14 of the scheme brochures, 2015 to 2026). For residential allottees whose lease deed is already executed, the no-charge construction window has been extended to 31 December 2026 (YEIDA’s 87th board meeting). If you hold a 2023 or 2024-scheme Sector 16 plot, count your three years from the date your lease deed is executed (clause 14), not from the possession date, and plan early: map approval has to be in hand before construction can start.

Keep reading

Explore more

Got a plot in YEIDA Sector 16?

Send your plot size. Get a plan.

Send your plot size and the floors you want. We’ll share one binding, itemised fixed quote, a dated timeline, and a nearby site you can visit before you sign.

The delivery lead calls you back, not a call centre.

Got it. The delivery lead will call you within 24 hours.

Three packages, Essential, Premium and Luxe, are set out on Vidastu Build. Essential from ₹1,650 per sq ft* of built-up area (wall to wall) as on 15 November 2026, exclusive of interiors and modular kitchen; Premium and Luxe are priced on the site walk. *Starting rate: the binding, itemised fixed quote after a free site walk governs.