How to check your YEIDA BPMS application status: where the file is and what each stage means

A YEIDA building plan file lives in the BPMS portal, and its status is read there: log in at bpms.yamunaexpresswayauthority.com with your CCP or PMS credentials and the OTP sent to your registered mobile and email, open the application, and read the documents tab, which lists the scrutiny drawing, the scrutiny report and any objection letter. The portal tells you by SMS and email when the architect accepts or rejects your request. Your architect can fetch the Smart-DCR scrutiny report with the Application Reference Number. If no decision comes within 60 days, Regulation 13(2) gives a deemed sanction, but only if you notify the CEO in writing within the next 20 days.

Sources: YEIDA BPMS portal notice, FAQ and Allottee User Manual 1.0 (bpms.yamunaexpresswayauthority.com, read 2 November 2026), as summarised on our BPMS guide; The Yamuna Expressway Industrial Development Area Building Regulations, 2010, Notification No. 311/77-3-09-8X/09 dated 20 December 2010 (Regulations 10, 13(2), 15, 20.1.1, 20.1.2, 24.1 and 24.8(16)), as transcribed on our regulations page, read 6 October 2026; YEIDA’s 87th board meeting of 7 November 2025, as reported by the Times of India, 8 November 2025. Fee amounts are not printed. The portal’s own screens and checklist govern your file.

Where the file lives

Since 1 August 2024 YEIDA processes every sanction and completion application online, so there is no counter to visit and no paper file to ask after. The record is in BPMS, under the allottee’s own login. Log in with your CCP or PMS credentials; an OTP goes to your registered mobile number and email at every login (Allottee User Manual 1.0, as read 2 November 2026). For an owner abroad, a power of attorney holder can sign local paperwork (BPMS guide); the file still sits under the allottee’s own login.

What you can read on the file

The stages a file passes, and what each means

  1. Architect selected. The request is pending until the architect accepts it; the portal tells you by SMS and email.
  2. Drawing uploaded; Smart-DCR pre-check. A pass produces the scrutiny report; a fail returns the drawing to the architect for correction (drawing requirements).
  3. Fee paid. Only after the pass; the portal shows the amount for your file.
  4. Signed drawing uploaded. A scanned copy of the duly signed, scrutiny-approved drawing, in place of any hard copy.
  5. Officer review. YEIDA’s officers review the file and either sanction the plan or raise an objection, which appears as an objection letter in the documents tab.
  6. Sanction. The plan is sanctioned and valid for 5 years (Regulations 10(5) and 15). Construction may legally start.

Sequence from the YEIDA BPMS FAQ and Allottee User Manual 1.0 as summarised on our BPMS guide. The portal pages we read state no service time for a clean file, so this page quotes none.

If the file is objected

Read the objection letter and the scrutiny outputs in the documents tab, then have the architect correct the drawing and resubmit. The common causes are coverage, FAR or height over the band, setbacks that do not match the sector zonal plan, an enclosed balcony, a drawing not in the portal’s CAD format, and dues pending on PIMS. A file cannot proceed while dues are pending, so check PIMS first if the file is stuck before scrutiny.

The 60-day clock, and its condition

Regulation 13(2) of the 2010 Regulations says that if no decision is given within 60 days of the application, the plan is deemed sanctioned. The condition is that the applicant must notify the CEO in writing within the next 20 days. Without that notice there is no deemed sanction. Treat it as a backstop, not a plan: the Regulations date from 2010, YEIDA can amend them, and how the clock runs on an online file should be confirmed with YEIDA before you rely on it.

Following the completion application

The completion application runs on the same portal. After the empanelled architect certifies that the built house matches the sanctioned naksha, YEIDA inspects and raises any objections; the CEO has 90 days to issue the certificate or communicate inability, and objections left unresolved for 6 months reject the application automatically (Regulations 20.1.1 and 20.1.2). For allottees with an executed lease deed the certificate, not the filing, is what meets the 31 December 2026 window, so a completion file is watched more closely than a sanction file (completion certificate guide).

What this page does not confirm

The portal pages we could read do not publish a service time for a clean sanction file, a public status-lookup page that works without a login, or the exact wording of each status label. Where this page is silent, the portal screen is the authority. If you cannot log in, the CCP or PMS credentials and the registered mobile number are the first things to check. This page prints no fee or price; the desk gives one binding, itemised fixed quote for a build after a free site walk.

Related guides

BPMS application status: frequently asked questions

How do I check my YEIDA BPMS application status?
Log in at bpms.yamunaexpresswayauthority.com with your CCP or PMS credentials and the OTP sent to your registered mobile and email, open the application for your plot and read the documents tab, which lists the scrutiny drawing, the scrutiny report and any objection letter. The portal tells you by SMS and email when the architect accepts or rejects your request.
What is the Application Reference Number for?
It identifies your BPMS file. The architect uses it to fetch the Smart-DCR scrutiny report online, the report that lists each YEIDA rule parameter the drawing was checked against.
My BPMS file shows an objection. What do I do?
Read the objection letter and the scrutiny outputs in the documents tab, then have your architect correct the drawing and resubmit through the portal. If the file is stuck before scrutiny, check that YEIDA dues are cleared on PIMS; a sanction cannot proceed while dues are pending.
How long does YEIDA take to sanction a building plan?
The portal pages we read state no service time, so this page quotes none. The statutory backstop is Regulation 13(2): no decision within 60 days is a deemed sanction, but only if you notify the CEO in writing within the next 20 days. Confirm with YEIDA how the clock runs on an online file before relying on it.
Can I check the status without logging in?
The portal pages we read do not describe a public lookup without a login. The file sits under the allottee’s own CCP or PMS login, and a power of attorney holder can sign local paperwork for an owner abroad, and the file sits under the allottee’s own login.
How is the completion application tracked?
On the same portal. After the architect certifies the built house, YEIDA inspects and raises any objections; the CEO has 90 days to issue the certificate or communicate inability, and objections left unresolved for 6 months reject the application. For an executed lease deed, the certificate must be in hand by 31 December 2026.

Talk to the construction desk

File stuck? Send us the stage it is at.

Send your sector, plot size and what the documents tab shows. We tell you in writing what the objection means and what it takes to clear it, and give one binding, itemised fixed quote for the build after a free site walk.

Call +91 95404 45300

Your number goes to the construction desk, not a call-centre.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Disclaimer: Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026) is the RERA-registered agent desk. Vidastu Developers Pvt. Ltd., the construction entity on this page, is not itself RERA-registered and files and executes YEIDA building plans as a contractor. YEIDA alone sanctions building plans and issues the completion and occupancy certificate. Portal steps are as described in the BPMS portal’s FAQ and Allottee User Manual as read on the dates stated; YEIDA revises the portal, its fees and its checklists. Regulation figures are from the YEIDA Building Regulations 2010 as transcribed on this site. Your allotment letter, lease deed and the portal’s own screens govern your own file. General guidance, not legal advice.