Services · Property Vaastu · Delhi NCR

Vaastu consultant fees in Delhi NCR: how they charge, and what one hour should cover

A Vaastu consultant in Delhi NCR may charge a fixed fee per site visit, a rate per square foot, a rate per room, a retainer, or a fee for a remote review of drawings and photos. Compare quotes on what they include: who visits, for how long, and whether travel and a written report sit inside the fee. This desk charges ₹11,000* all-inclusive, as on 12 August 2026, for a one-hour on-site visit anywhere in Delhi NCR, conducted personally by Shri Ravi Shankar Sharma.

Sources: the desk’s own fee and terms, from our Property Vaastu page (fees and policy last checked 12 August 2026). We print no other consultant’s rupee figure, because we hold no dated, primary source for one. *Footnote with the fee below.

Five ways a Vaastu fee can be quoted

Before you compare two quotes, work out which shape each one takes. The same headline number can buy very different work.

Fee shapeHow it is worked outWhat to check
Per visitOne fixed price for a set visit, within a size limitHow long the visit lasts, the size limit, and whether travel and the written report sit inside the price
Per square footA rate multiplied by the property’s areaWhich area is measured (carpet, built-up or plot), and whether a minimum fee applies
Per room or zoneA charge for each room or zone reviewedWhether the entrance, kitchen, prayer room and toilets each count as a room, and who decides the count
RetainerA monthly or whole-project fee while you build or renovateHow many site visits and drawing reviews it covers, and how it ends
Remote reviewA fee to review drawings, a floor plan or photos without a visitWhether anyone checks the real orientation on site, and what happens if the drawings are wrong

Descriptions only. We print no other consultant’s rupee figure: we hold no dated, primary source for one, and any such figure would date quickly. Ask each consultant for a written, dated quote.

What a one-hour on-site visit should cover

Our own visit completes the diagnosis and the remediation plan in a single one-hour visit, per our Property Vaastu page. That only works if the hour goes on the property and not on selling. This is the checklist our visit follows. Use it to judge any consultant’s visit.

  1. Plot orientation. Directional alignment, slope and the influences around the property.
  2. Entrance. Main door direction, threshold position and any blockage.
  3. Kitchen. Stove placement, water source, storage, and whether fire and water sit next to each other.
  4. Bedrooms. Sleeping direction, mirror placement and where the master bedroom sits.
  5. Prayer room. Direction, placement, lighting and upkeep.
  6. Water bodies. Water tanks, borewells, swimming pools and water features.
  7. Vaastu dosh diagnosis. Any structural defect, each with a severity rating.
  8. A practical remediation plan. Corrections that do not need demolition.
  9. A written report. Ours arrives the same day, on WhatsApp or by email.

A visit that ends without a written report leaves you with a memory, not a plan. A visit that ends with a list of items to buy from the consultant is a sale.

This desk’s fee

Property Vaastu · one-hour on-site visit

₹11,000* all-inclusive, as on 12 August 2026

  • One hour at your property anywhere in Delhi NCR: Delhi, Noida, Greater Noida, Gurgaon, Ghaziabad and Faridabad.
  • Homes, and offices, shops, factories and restaurants under 5,000 sq ft. Larger commercial properties are quoted separately.
  • A written remediation plan the same day.
  • No yantras, pyramids or crystals sold. You source anything the plan suggests yourself.

*Conducted personally by Shri Ravi Shankar Sharma, senior Vaastu consultant. All-inclusive means the consultation, travel within Delhi NCR, the written report and clarifying calls for seven days after the visit, with no GST added. Cancel or reschedule at least 24 hours before the slot for a full refund; a same-day cancellation carries a 50% retention charge, and the page also states that rescheduling within 24 hours is free. Terms as stated on our Property Vaastu page, fees and policy last checked 12 August 2026.

To book, use the form below or the Vaastu consultant service guide for Noida, Greater Noida and Delhi NCR. The fee is for an on-site visit. Our Property Vaastu page does not list a remote option.

Questions to ask before you book any consultant

Our own answers to every one of these are on the Property Vaastu page and in the fee box above.

Before you buy: when the visit helps most

Our Property Vaastu page calls the pre-purchase check the single most useful time for a Vaastu review, done with the seller’s permission before you finalise. A defect found before you sign can be weighed in the decision. Found after, it becomes a remediation job.

Vaastu consultant fees: frequently asked questions

How much does a Vaastu consultant charge in Delhi NCR?
There is no single published rate we can cite, and we print no other consultant's figure. Consultants may charge per visit, per square foot, per room, by retainer or for a remote review, so compare what each quote includes. This desk charges ₹11,000* all-inclusive, as on 12 August 2026, for a one-hour on-site visit anywhere in Delhi NCR, conducted by Shri Ravi Shankar Sharma.
Is a per-square-foot Vaastu fee better than a fixed fee per visit?
Neither is better in itself. A per-square-foot fee grows with the property, so ask which area is measured and whether there is a minimum. A fixed fee per visit is easier to compare, so ask how long the visit lasts and whether travel, the written report and follow-up calls are inside it.
What should a one-hour Vaastu visit cover?
Plot orientation, the entrance, the kitchen, the bedrooms, the prayer room and any water bodies such as tanks or borewells. Then a diagnosis of any Vaastu dosh with a severity rating, and a practical remediation plan that avoids demolition. It should end in a written report; ours is delivered the same day.
Can a Vaastu consultation be done remotely?
Some consultants offer to review drawings, floor plans or photos without a visit. Ask whether they will see the actual orientation of the site, and what happens if the drawings differ from what is built. This desk's fee is for an on-site visit; our Property Vaastu page does not list a remote option.
Should I get a Vaastu check before I buy a flat?
If Vaastu matters to you, before purchase is the most useful time. Our Property Vaastu page recommends a pre-purchase check, done with the seller's permission, before you finalise. A defect found before you sign can be weighed in the decision; one found after has to be fixed.
Who conducts the Vidastu Vaastu visit, and what if I need to cancel?
Every paid visit is conducted personally by Shri Ravi Shankar Sharma, senior Vaastu consultant, with no junior consultants, franchises or referrals. Cancel at least 24 hours before the slot for a full refund. A same-day cancellation carries a 50% retention charge, per our Property Vaastu page (fees and policy last checked 12 August 2026).

Book or ask

Book the one-hour Vaastu visit

Send your name and number with what you need. We confirm Shri Ravi Shankar Sharma’s slot the same day.

Call +91 98114 05300

Your number goes to the desk, not a call-centre.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Disclosure: Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026) is an authorised channel partner for Gaurs, Eldeco and ACE, and not the developer of any project. The Property Vaastu visit is this desk’s own paid service; the fee and terms are as stated on our Property Vaastu page, fees and policy last checked 12 August 2026, and that page governs if anything here differs. Fee shapes above are descriptions, not quotes from any named consultant. A Vaastu review is not a structural survey, and it is not legal or financial advice.