22 Noida Projects Registered with UP-RERA Since 2024, and the Company That Filed Each

The answer, before the detail

22 project registrations filed from 2024 onward carry a UP-RERA register address that places them in Noida, read from Vidastu's mirror of the UP-RERA register on 29 July 2026. This page prints all 22 with six register fields each: the project name as filed, the sector as printed in the register address, the UP-RERA registration number, the registered promoter as the legal entity that filed, the registration date, and the completion date the promoter itself declared. The field worth reading first is the promoter. On 17 of the 22, the registered company shares no whole word with the project name being marketed: M3M The Cullinan II is filed by LAVISH BUILDMART PVT. LTD., Bhutani 18 by GOODLIVING INFRASTRUCTURE PRIVATE LIMITED, DASNAC YUVA by CLEARLAKE PRIVATE LIMITED, DLF Techpark Noida Phase 2 by URVASI INFRATECH PRIVATE LIMITED, and The G by GULSHAN HOMES AND INFRASTRUCTURE PRIVATE LIMITED, which is one of the projects we ourselves represent. Filing through a project-specific company is an ordinary, lawful structure and says nothing about any project. What it does mean is practical: the name on the hoarding will often not find the filing on up-rera.in. Take the registration number or the promoter's legal name from the table below and search with that instead.

22Registrations from 2024 onward with a Noida register address · read 29 July 2026
17 of 22Filings where the registered company shares no whole word with the project name
20Distinct registered promoter entities across the 22 registrations

Check the registered company before anything else, because on 17 of these 22 filings it is not the name on the hoarding

Almost every buying checklist tells you to verify the RERA registration. Almost none of them tells you what to do when the lookup returns nothing, which is what happens to most people who try it in Noida with the only name they have.

Here is the mechanics of the dead end. A buyer walks out of a sales office holding a brochure for a project with a brand name on it. They go to up-rera.in, which lets them search by registration number, by promoter name, or by district. They do not have the registration number, so they type the brand name into the promoter field. Nothing comes back, or something unrelated does, and the check quietly gets abandoned. The register is not hiding anything. It is simply recording a different string: the legal name of the company that actually made the filing, which is frequently not the name anyone paints on a hoarding.

We measured how often that gap appears. Taking the 22 Noida registrations in this cohort and comparing each project name against its registered promoter name, word by word, 17 of the 22 share no whole word of three letters or more. Only 5 do. The full test, and the stop-word list it uses, is set out further down so you can rerun it on any project you like.

What a differing name is, and what it is not. Registering a real-estate project through a company set up for that project, or through a group company that holds the land, is a routine and entirely lawful way to file in India. Lenders, land-holding structures and joint-development arrangements all produce it. The register's job is to record who filed, and it does that accurately.

So a name that does not match the brand is a navigation fact, not a quality signal. It tells you which string to search for, and whose name you should expect to see on the agreement you are eventually asked to sign. It carries no implication, in either direction, about any project or any company named on this page.

The practical value of the crosswalk is that it converts a dead end into a two-minute check. Once you know that the project you are looking at was filed by a particular company under a particular registration number, everything else on the register opens up to you: the sanctioned plan, the declared completion date, the escrow account details, the promoter's filed particulars. The lookup is the gate, and the entity name is the key to it.

We have written elsewhere about why one brand can sit behind several registered companies and what that means when you read an agreement. That page explains the principle. This one is the evidence: 22 named Noida filings, with the crosswalk printed out.

The 22 registrations, sector by sector across 17 Noida sectors

These 22 registrations sit in 17 sectors: 45, 62, 75, 77, 94, 105, 107, 124, 128, 129, 134, 140A, 142, 143A, 146, 150, 151. The sector below is read out of each filing's own register address string. UP-RERA does not carry a separate sector field, and the authority column in our mirror is empty on all 966 rows of that scrape, so nothing here is an official Noida Authority classification. It is the address, parsed.

One honesty note on the sector column before you use it. Three filings sit on the same plot number in Sector 140A, and the register writes that sector two different ways: “Sector-140A” on two of them and “Sector 140 A”, with a space, on the third. This page prints 140A for all three. The sector cell is the only cell on this page that is parsed rather than copied: the word Sector and the spacing and hyphens around it are stripped on every row, and 140A is the only value where the register's own spelling of the number itself differs. Every other cell is printed as the register holds it.

Read this section as a roster, not a shortlist. These 22 filings are not a comparable set of things to buy: the register does not record what a project is for, and this cohort visibly mixes group housing with IT park, retail and hospitality filings. Inventing a use-type column to separate them would be fabrication, so we have not. What follows is what registered, and who filed it.

Sectors 45 to 77: the older, inner Noida addresses

5 of the 22 registrations sit here, across Sectors 45, 62, 75, 77.

Sectors 94 to 107: three filings across central Noida

3 of the 22 registrations sit here, across Sectors 94, 105, 107.

Sectors 124 to 134: the central Noida addresses

6 of the 22 registrations sit here, across Sectors 124, 128, 129, 134.

Sectors 140A to 151: the Noida Expressway stretch

8 of the 22 registrations sit here, across Sectors 140A, 142, 143A, 146, 150, 151.

All 22 rows in one table: project, sector, registration number, registered promoter, registration date, declared completion

This is the whole cohort in one place, sorted by registration date, oldest first. That sort is a register fact and nothing else: it is not a ranking, not a shortlist and not an order of preference. Every project name links out to its record page on our register tracker.

Scroll the table sideways to see all six fields

The 22 UP-RERA project registrations filed from 2024 onward whose register address places them in Noida, read from Vidastu's mirror of the register on 29 July 2026. Sorted by registration date, oldest first. All 22 are filed as project type New, which is why that field is stated here once rather than printed as a column of identical cells. Dates are printed in the register's own dd-mm-yyyy form. Registrations filed before 2024, and rows whose register address field is empty, are excluded. A declared completion date is the date the promoter declared on its own filing, not a guaranteed handover.
# Project name (as filed on the register) Sector (from the register address) UP-RERA registration number Registered promoter (legal entity as filed) Registration date Declared completion date (as filed)
1ONYX BLUE142UPRERAPRJ920006/03/2024SPLENDOR INFORMATION TECHNOLOGY PRIVATE LIMITED02-03-202430-06-2030
2EXPRESS ZENITH (TOWER A)77UPRERAPRJ980703/04/2024EXPRESS BUILDERS & PROMOTERS PVT. LTD.04-04-2024“RERA Registration Certificate”register cell holds this text, not a date
3Experion Elements Phase-145UPRERAPRJ120027/04/2024EXPERION DEVELOPERS PVT. LTD04-04-202404-01-2029
4Godrej Jardinia146UPRERAPRJ288309/04/2024GODREJ PROPERTIES LIMITED08-04-202403-12-2028
5The Flagship Phase 3140AUPRERAPRJ161225/04/2024IT INFRASTRUCTURE PARK PRIVATE LIMITED26-04-202416-11-2027
6DLF Techpark Noida Phase 2143AUPRERAPRJ385951/08/2024URVASI INFRATECH PRIVATE LIMITED16-08-202430-09-2026
7The G129UPRERAPRJ794678/09/2024GULSHAN HOMES AND INFRASTRUCTURE PRIVATE LIMITED21-09-202414-07-2029
8THE FLAGSHIP PHASE 4140AUPRERAPRJ683511/10/2024IT INFRASTRUCTURE PARK PRIVATE LIMITED11-10-202416-11-2027
9Estate 128 - II128UPRERAPRJ294911/12/2024MAX ESTATES 128 PRIVATE LIMITED19-12-202406-09-2029
10DASNAC YUVA124UPRERAPRJ871413/01/2025CLEARLAKE PRIVATE LIMITED25-01-202524-10-2029
11EKANAM107UPRERAPRJ510056/09/2025GREATVALUE PROJECTS INDIA LIMITED01-09-202510-06-2030
12ITHUM HEIGHTS PHASE 262UPRERAPRJ764408/09/2025R AND R TECH MACH LIMITED26-09-202507-07-2030
13M3M The Cullinan II94UPRERAPRJ794824/10/2025LAVISH BUILDMART PVT. LTD.03-10-202531-07-2030
14Clove County151UPRERAPRJ696539/11/2025SHIRJA REAL ESTATE SOLUTIONS PVT. LTD.27-11-202513-10-2030
15Bhutani 18128UPRERAPRJ335396/01/2026GOODLIVING INFRASTRUCTURE PRIVATE LIMITED10-01-202630-12-2026
16One Estate62UPRERAPRJ306637/02/2026KRISHNA APRA PROJECTS PRIVATE LIMITED24-02-202615-03-2030
17Estate 105105UPRERAPRJ529777/03/2026MAX ESTATES NOIDA PRIVATE LIMITED19-03-202604-01-2031
18Express One34134UPRERAPRJ816123/04/2026EXPRESSWAY HOSPITALITY PRIVATE LIMITED21-04-202623-07-2030
19Indosam Iconic75UPRERAPRJ303620/05/2026INDOSAM INFRA PRIVATE LIMITED06-05-202621-01-2031
20The Flagship Phase 5140AUPRERAPRJ388326/05/2026IT INFRASTRUCTURE PARK PRIVATE LIMITED07-05-202616-11-2027
21ACE ARTE150UPRERAPRJ528653/07/2026ACE INFRACITY DEVELOPERS PRIVATE LIMITED28-07-202615-02-2031
22Arqis Mall129UPRERAPRJ585483/07/2026ADONIS BUILDTECH PRIVATE LIMITED28-07-202631-03-2031

Free to reuse with attribution to www.vidastu.com. Five fields printed exactly as the register holds them, plus the sector, which is parsed out of each filing's own register address string because UP-RERA carries no sector field of its own. Nothing else is derived: this table carries no delay figure, no extension history, no complaint count, no score and no rank, and it is not sorted by desirability. Row 2 prints its declared completion cell verbatim because the register holds text there rather than a date, explained below. Re-check any row on the live filing at up-rera.in before relying on it.

Which of these 22 are filed under a company name that does not match the brand?

Here is the direct answer: 17 of the 22. The test is deliberately mechanical, so you can run it yourself and get the same result. Take every word of three letters or more from the project name and from the registered promoter name, ignore the corporate furniture (PRIVATE, LIMITED, PVT, LTD, LLP) and the generic words THE, AND, PHASE and TOWER, count letters only so that a bare number is not a word, and see whether a single whole word survives in both. These 17 have none in common. If you count numbers as words too, Estate 128 - II and MAX ESTATES 128 PRIVATE LIMITED share 128 and the split becomes 16 and 6.

Scroll the table sideways to see the full promoter name

The brand-to-registered-entity crosswalk: the 17 of 22 Noida filings where the project name and the registered promoter name share no whole word of three letters or more. Register facts as read on 29 July 2026. A differing name is a routine filing structure and is not a statement about any project or company.
Project name (as filed) Sector Registered promoter (legal entity as filed) Whole word shared with the project name
ONYX BLUE142SPLENDOR INFORMATION TECHNOLOGY PRIVATE LIMITEDNone
The Flagship Phase 3140AIT INFRASTRUCTURE PARK PRIVATE LIMITEDNone
DLF Techpark Noida Phase 2143AURVASI INFRATECH PRIVATE LIMITEDNone
The G129GULSHAN HOMES AND INFRASTRUCTURE PRIVATE LIMITEDNone
THE FLAGSHIP PHASE 4140AIT INFRASTRUCTURE PARK PRIVATE LIMITEDNone
Estate 128 - II128MAX ESTATES 128 PRIVATE LIMITEDNone
DASNAC YUVA124CLEARLAKE PRIVATE LIMITEDNone
EKANAM107GREATVALUE PROJECTS INDIA LIMITEDNone
ITHUM HEIGHTS PHASE 262R AND R TECH MACH LIMITEDNone
M3M The Cullinan II94LAVISH BUILDMART PVT. LTD.None
Clove County151SHIRJA REAL ESTATE SOLUTIONS PVT. LTD.None
Bhutani 18128GOODLIVING INFRASTRUCTURE PRIVATE LIMITEDNone
One Estate62KRISHNA APRA PROJECTS PRIVATE LIMITEDNone
Estate 105105MAX ESTATES NOIDA PRIVATE LIMITEDNone
Express One34134EXPRESSWAY HOSPITALITY PRIVATE LIMITEDNone
The Flagship Phase 5140AIT INFRASTRUCTURE PARK PRIVATE LIMITEDNone
Arqis Mall129ADONIS BUILDTECH PRIVATE LIMITEDNone

The other 5 filings do share a word: EXPRESS ZENITH (TOWER A) and EXPRESS BUILDERS & PROMOTERS PVT. LTD. share “EXPRESS”; Experion Elements Phase-1 and EXPERION DEVELOPERS PVT. LTD share “EXPERION”; Godrej Jardinia and GODREJ PROPERTIES LIMITED share “GODREJ”; Indosam Iconic and INDOSAM INFRA PRIVATE LIMITED share “INDOSAM”; ACE ARTE and ACE INFRACITY DEVELOPERS PRIVATE LIMITED share “ACE”.

The test is a lookup aid, not a verdict. It is a string comparison, and string comparisons are blunt in both directions. Two rows in the table above are a good illustration. Estate 128 - II is filed by MAX ESTATES 128 PRIVATE LIMITED and Estate 105 by MAX ESTATES NOIDA PRIVATE LIMITED: to a human reader the relationship is obvious, but “Estate” and “ESTATES” are not the same word, so the test scores both as no match. Express One34 is filed by EXPRESSWAY HOSPITALITY PRIVATE LIMITED, where “Express” and “EXPRESSWAY” miss each other the same way. The two Estate filings are also worth noticing for a different reason: MAX ESTATES 128 PRIVATE LIMITED and MAX ESTATES NOIDA PRIVATE LIMITED are two separate registered companies, one per project, which is exactly the structure this whole section is about.

We applied the same rule to our own side of the table, deliberately. At a three-letter threshold, ACE ARTE and ACE INFRACITY DEVELOPERS PRIVATE LIMITED share the word “ACE”, so that filing counts as a match. Raise the threshold to four letters and it would fall into the 17-strong no-match group instead. We chose the three-letter threshold before we looked at where our own row landed, and it puts ACE ARTE in the five-filing group that shares a word rather than the seventeen that do not. Neither group is better or worse than the other, and which group a filing lands in says nothing about the project or the company. We are stating the threshold so that you can rerun the test at four letters if you prefer it, which would move our row into the seventeen.

One more pattern the promoter column shows plainly: across 22 registrations there are 20 distinct registered entities, because IT INFRASTRUCTURE PARK PRIVATE LIMITED filed 3 of them, the three Flagship phases in Sector 140A. Everything else in the cohort is one entity, one registration.

How to run the entity check yourself, before you pay anything

This is the framework we use at the desk. It takes a few minutes and it works on any project in Uttar Pradesh, not only the 22 here.

  1. Ask the sales office for the registration number in writing. Not a screenshot of a certificate, not a number read out over the phone: the number, on something you can keep, along with the full legal name of the promoter entity. Any registered project has both and there is no reason to withhold either. If the project you are being shown is not yet registered, that is a different conversation and the answer should be given to you plainly.
  2. Search the register by the number or the entity, not the brand. Go to up-rera.in and use the registration number if you have it. If you only have a company name, search by promoter. If you have neither, search the district, Gautam Buddha Nagar, and work through it. Searching the brand name alone is what fails on 17 of the 22 filings on this page.
  3. Match three things on the filing to what you were shown. The promoter name should be the entity that will sign your agreement. The address on the filing should be the plot you visited, sector and plot number, not merely the same locality. The declared completion date should be the date being quoted to you. If any of the three does not line up, stop and ask about the one that does not, before money moves.
  4. Read the promoter name against the paperwork you are given. This is where the crosswalk earns its keep. If the register says a project was filed by one company and the receipt, the allotment letter or the agreement names a different one, that difference needs explaining to you in writing. It may have a perfectly ordinary explanation. Get the explanation anyway.
  5. Check the escrow account details on the filing, and pay into that account. The register records the project's designated account. Payments made anywhere else sit outside the protection the registration exists to give you.
  6. Re-check on the day you pay. Registers change. A filing read weeks ago is a historical record, including every figure on this page. The check that protects you is the one run against the live filing at the moment of payment.

If you want the format of the registration number itself decoded, so you can tell at a glance which year and month a filing belongs to, we have taken that apart in how to read a UP-RERA registration number. The four-step portal walkthrough, with the screens in order, is in how to check a UP-RERA registration yourself.

How to verify any row on this page at up-rera.in

Everything above is a mirror. The authority's portal is the original, and it is the only thing you should rely on when money is involved.

Go to up-rera.in and open the registered-projects search. We link the site root deliberately: deep links into the portal's project paths do not reliably resolve, so start at the front door and navigate from there rather than trusting a bookmarked inner URL from anyone, this page included. Search by the registration number from the table, which is the fastest route, or by the promoter name if you are working from a company rather than a number, or by district if you are browsing.

When the filing opens, the fields worth your attention are the ones this page prints, plus the ones it deliberately does not: the sanctioned plan, the project's designated account, and the promoter's filed particulars. Compare what you see there against the row above. If a cell here disagrees with the live filing, the live filing is right and we are out of date, and we would genuinely like to know so we can correct the page and say that we did.

Each project name in the big table also links to that project's record page on our register tracker, which carries the full set of fields we hold for that registration. That is a convenience layer over the same register, not a substitute for it.

What this page counts, what it leaves out, and the date the register was read

The scope sentence, in full. This page covers the 22 registrations filed from 2024 onward whose UP-RERA register address places them in Noida, read 29 July 2026. Registrations filed before 2024, and rows whose register address field is empty, are excluded. It is not a list of every project in Noida, and a project's absence from it is not a statement about that project's registration status.

Why the scope starts at 2024. Our mirror holds 966 registrations from the Gautam Buddha Nagar scrape, spanning registration years 2017 to 2026. The register's address field is populated on 143 of the 148 registrations filed from 2024 onward (96.6%), against 41 of the 818 filed between 2017 and 2023 (5.0%). That collapse in address density is the whole reason for the cut. A corridor page built on the older rows would be a page about which filings happen to have an address, dressed up as a page about a place. Starting at 2024 keeps the denominator honest, at the price of leaving out most of the register.

How a row was placed in Noida. By its address text: the address contains the word Noida and does not contain the word Greater. There is no official field doing this work. The authority column in our mirror is empty on all 966 rows, so no development-authority classification was available to use, and inventing one would have been a guess. Address-token matching is the method, it is disclosed here rather than implied, and it is why a row filed with a bare plot number and no city token appears on no corridor page of ours at all.

The one row whose completion cell is not a date. EXPRESS ZENITH (TOWER A), UPRERAPRJ980703/04/2024, has a declared completion cell that reads “RERA Registration Certificate” in the field we hold, as read on 29 July 2026. That is a portal data artifact, nothing more, and it is about a register cell rather than about the project or the company. We print it verbatim rather than guessing a date or dropping the row, and every statement on this page about declared completion dates is therefore made over 21 of the 22 rows, not all 22. Across those 21, the declared completion dates fall in calendar years 2026 to 2031.

What a declared completion date is. It is the completion date the promoter itself declared when it filed. It is a record of what was declared, on the date it was declared. It is not a guaranteed handover date, not a commitment made to you, and not a number to subtract today's date from. This page prints what the register records and stops there, which is also why you will find no extension history, no revised dates and no timeline arithmetic anywhere on it.

The fields this page publishes, and the ones it does not. This page publishes six fields and no others. We publish no promoter phone number or email address, for anyone, because developer contact details are not ours to redistribute. Everything else the authority holds stays with the authority, which publishes its own record in its own context; read it there, at up-rera.in. We also print no figure derived by arithmetic from two register fields, because the moment a page does that it is publishing its own opinion rather than the register. We left out price, size, configuration and availability for all 22, including the projects we ourselves represent, because none of it is register data and keeping every number on this page a register number is what makes the table worth citing.

What we sell, stated plainly. Vidastu Advisory is a UP-RERA-registered agent, not a developer. Among the 22 registrations above we represent projects of ACE Group and Gulshan Group. Every row is printed from the same six fields, in register-date order, with no project given a section, a highlight or a link the other 21 do not get. Every row gets the same six fields and the same treatment, the two we represent included.

For the neighbouring corridor, our Yamuna Expressway register work sits in Yamuna Expressway RERA numbers and the corridor live index. The state-level view for the first half of 2026 is in our UP-RERA H1 2026 report, and our Noida desk page is at Noida advisory.

Read next: Noida vs Greater Noida, 51 registrations since 2024 compared.

Frequently asked questions

How many Noida projects does this page count, and how were they picked?
It counts the 22 registrations filed from 2024 onward whose UP-RERA register address places them in Noida, read from our mirror of the register on 29 July 2026. The filter is mechanical: the registration date falls in 2024 or later, the address field is populated, and that address contains the word Noida but not the word Greater. Registrations filed before 2024 and rows whose address field is empty are excluded, so this is a roster of what registered under those conditions, not a list of everything built or selling in Noida.
Why is the registered promoter's name different from the project name on so many of these filings?
Filing a real-estate project through a project-specific company is a routine, lawful structure in India, and the register records whichever legal entity actually made the filing. The brand painted on the hoarding is a marketing name; the promoter field is a company name. On 17 of these 22 filings the two share no whole word of three letters or more, which is why searching the register by the brand name alone often returns nothing.
Is a project less trustworthy if the filing company's name does not match the brand?
A differing name is a navigation fact, not a quality signal. It tells you which entity to search for on up-rera.in and whose name should appear on the agreement you are asked to sign. It carries no information, either way, about any project or any company on this page. The only thing it changes is how you run the lookup.
Kya UP-RERA portal par project ke brand name se search kar sakte hain?
Hamesha nahi. Portal registration number, promoter ka legal naam aur district se search karta hai. Is page ke 22 filings mein se 17 aise hain jahan project ka naam aur registered company ka naam ek bhi poora shabd share nahi karte, to sirf hoarding wala naam daal kar search karne se result nahi milega. Upar table se registration number ya promoter ka naam uthaiye, phir up-rera.in par search kijiye.
What exactly does the register's declared completion date mean?
It is the completion date the promoter itself declared on its registration filing. It is a record of what was filed, on the date it was filed. It is not a guaranteed handover date, not a commitment made to you, and not something this page compares against any other date. Treat it as one field to read on the live filing, alongside the sanctioned plan and the escrow account details, and confirm it on up-rera.in yourself.
Why does one row show the words 'RERA Registration Certificate' instead of a completion date?
That is what the register's own cell contains for EXPRESS ZENITH (TOWER A), UPRERAPRJ980703/04/2024, as read on 29 July 2026. It is a portal data artifact in the field we hold, so the page prints the cell verbatim rather than guessing a date or dropping the row. Because of it, any statement on this page about declared completion dates is made over 21 of the 22 rows, not all 22.
Which Noida sectors do these registrations sit in?
17 sectors, read out of each filing's own register address: 45, 62, 75, 77, 94, 105, 107, 124, 128, 129, 134, 140A, 142, 143A, 146, 150, 151. The sector is not a separate field on the register, so it is parsed from the address string rather than taken from any authority classification.
Does this page list every project in Noida?
It does not, and it is not meant to. It covers the 22 registrations from 2024 onward whose register address places them in Noida, read on 29 July 2026. Older registrations and rows without a usable address are excluded, and a project's absence from this page says nothing about its registration status. For anything outside that scope, search the register directly at up-rera.in.
Sources and method
  1. UP-RERA · the authority's portal, and the source of every project field on this page. Site root only: deep links into the portal's project paths do not reliably resolve.
  2. Vidastu's mirror of the UP-RERA register for Gautam Buddha Nagar · 966 registrations, registration years 2017 to 2026. Register read date 29 July 2026, taken from the mirror's own scrape log rather than any banner date on the portal.
  3. Cohort filter, stated so it can be rerun: registration date in 2024 or later, address field populated, address contains “Noida” and does not contain “Greater”. Returns 22 rows. Address density: 143 of 148 (96.6%) for 2024 onward, 41 of 818 (5.0%) for 2017 to 2023.
  4. Brand-to-entity test, stated so it can be rerun: compare the set of words of three or more letters in the project name against the same set in the registered promoter name, ignoring PRIVATE, LIMITED, PVT, LTD, LLP, THE, AND, PHASE, TOWER. Returns 17 filings with no shared word and 5 with one.
  5. Sector: parsed from each filing's own register address string. UP-RERA carries no sector field, and the authority column in our mirror is empty on all 966 rows.
  6. upreratracker.com · our register record pages, linked from each project name above.
  7. Vidastu · which company is actually behind the project you are buying (the principle this page evidences).
  8. Vidastu · how to read a UP-RERA registration number.
  9. Vidastu · how to check a UP-RERA registration yourself, in four steps.
Vidit Kaushik, Director, Vidastu Developers Pvt. Ltd.

Vidit Kaushik

Civil Engineering, BITS Pilani · UP-RERA Agent UPRERAAGT000309/01/2026 · Director, Vidastu Developers Pvt. Ltd.

Ran the check and want a second pair of eyes?

If you have pulled the filing for one of these 22 and something on it does not line up with what you were shown in the sales office, send us the registration number and we will read the live filing with you. One number, one WhatsApp, no form.