Insights · RERA Lookup

What Is the RERA Number of a Yamuna Expressway Project? Every Project, Verified.

One lookup, every RERA number named plainly

This page tracks eighteen named projects across YEIDA Sectors 22D, 22A and 19, plus one explicitly-labelled adjacent-market row (Sector 150, Noida Authority — not YEIDA). Fifteen carry a stated RERA registration number — twelve independently confirmed by us directly on up-rera.in or the developer’s own official page, three reported from a single source and not yet portal-confirmed by us. ThreeCounty, Orion and Gaurs Studio Bento — carry no RERA number at all in our source set; treat any number anyone quotes you for those three as unverified until it appears on the state portal. Every row below links straight to a search on up-rera.in and to the open data file this page is built from. This is a lookup tool, not a recommendation — always verify the live registration yourself before paying anything.

18Named projects tracked, one lookup page
12Confirmed-tier RERA number
3Reported, not yet portal-confirmed
3No RERA number found — treat as unverified

Data last verified 2026-07-30 · 18 named projects tracked across YEIDA Sectors 22D, 22A, 19 and the Sector 150 adjacent market · regenerated from data/corridor.json (schema v2.0).

The lookup table

Every row below is generated from data/corridor.json (schema v2.0), the same open file behind our Corridor Live Index. The RERA column shows the exact registration number where one exists, or names the gap where it doesn’t — nothing is smoothed over. The Verify column links directly to a search on the official state portal; check every number there yourself before any payment. Our desk also republishes the Gautam Buddh Nagar filings, one page per registration, as the UP RERA project register, which is quicker to browse than the portal's own search.

Project RERA number Status Verify
Gaur Chrysalis (Phase 1) UPRERAPRJ622344/11/2025 Confirmed Sold out Verify at up-rera.in
Gaur Alaris (Gaur Plume) UPRERAPRJ950965/07/2026 Confirmed Bookable now Verify at up-rera.in
Eldeco Echoes of Eden UPRERAPRJ125342/02/2026 Confirmed Bookable now Verify at up-rera.in
ACE Terra UPRERAPRJ683816/04/2024 Confirmed Bookable now Verify at up-rera.in
ACE Edit UPRERAPRJ467686/09/2025 Confirmed Bookable now Verify at up-rera.in
ACE YXP UPRERAPRJ397607 Confirmed Bookable now Verify at up-rera.in
Whispers of Wonder UPRERAPRJ752382/09/2025 Reported Unverified Verify at up-rera.in
Ballads of Bliss UPRERAPRJ921261/05/2025 Reported Unverified Verify at up-rera.in
ATS Allure UPRERAPRJ918 Confirmed Ready to move Verify at up-rera.in
Purvanchal Sunbliss UPRERAPRJ746863/04/2025 Confirmed Unverified Verify at up-rera.in
Greenbay The Monarque UPRERAPRJ710489/10/2025 Confirmed Unverified Verify at up-rera.in
County (Yamuna Expressway) No RERA number surfaced Gap Unverified Verify at up-rera.in
Orion (Sector 22D) No RERA number surfaced Gap Unverified Verify at up-rera.in
Arihant Seasons 22D UPRERAPRJ974543/02/2026 Reported Unverified Verify at up-rera.in
ACE Verde UPRERAPRJ913692/03/2025 Confirmed Bookable now Verify at up-rera.in
ACE Hive UPRERAPRJ939595/03/2025 Confirmed Bookable now Verify at up-rera.in
Gaurs Studio Bento No RERA number surfaced Gap EOI only (pre-RERA) Verify at up-rera.in
ACE Arte (ACE Parkway 2.0) UPRERAPRJ528653/07/2026 Confirmed Bookable now Verify at up-rera.in

Confidence tags: Confirmed two or more independent sources agree, or independently checked directly on up-rera.in · Reported one named, dated source, not yet independently portal-confirmed by us · Gap no registration number found anywhere in our source set. Every number should be checked directly at up-rera.in before any payment — a project can carry a Confirmed RERA number and still be Unverified on price, availability or booking mechanics if Vidastu is not its appointed sales channel (see the Live Index for that fuller status picture).

Sector 22D — YEIDA (14 named projects)

The corridor’s densest pocket — from a reported-sold-out registered launch to two projects with no verifiable RERA number at all.

What is the Gaur Chrysalis (Phase 1) RERA number?

UPRERAPRJ622344/11/2025, granted 4 November 2025 — three days before its 7 November 2025 launch. Status: reported Sold Out; founder-confirmed no fresh availability, so any “booking” offered on Phase 1 today is resale, not a primary purchase from the developer. Possession per the RERA filing: October 2030.

Verify at up-rera.in · Full review →

What is the Gaur Alaris (Gaur Plume) RERA number?

UPRERAPRJ950965/07/2026, registered July 2026. Gaur Alaris — formerly marketed as Gaur Plume / “Chrysalis 2.0” — closed Phase 1 bookings on 1 September 2026. Its 3 BHK started at ₹1.40 Cr* (our arithmetic: 1,550 sq.ft × ₹9,000/sq.ft) at a closing BSP of ₹9,000/sq.ft*, possession 9 June 2031. This is a separate registration from Gaur Chrysalis (Phase 1)’s UPRERAPRJ622344/11/2025 — never accept one project’s number as cover for the other. The certificate filed under this number is read line by line on the Gaur Alaris RERA page.

Verify at up-rera.in · Gaur Alaris full review →

What is the Eldeco Echoes of Eden RERA number?

UPRERAPRJ125342/02/2026. Bookable now for the Caelum tower only — Haven and Elysian are fully booked and the 2 BHK is sold out project-wide. Entry ₹1.45 Cr (3BHK+2T, 1,550 sq.ft), possession January 2031.

Verify at up-rera.in · Full review →

What is the ACE Terra RERA number?

UPRERAPRJ683816/04/2024. Promoter of record Ajay Realcon India LLP, confirmed directly on up-rera.in — a separate legal entity from the earlier, already-delivered ACE Parkway’s promoter, shared “ACE” brand notwithstanding. Bookable now, possession December 2028; portal price figures conflict (reported ₹1.76–3.38 Cr range).

Verify at up-rera.in · Full review →

What is the ACE Edit RERA number?

UPRERAPRJ467686/09/2025. A commercial project from ACE Group, bookable now from ₹85.76 lakh; possession date not stated in our source set — confirm the sanctioned timeline on up-rera.in before paying anything.

Verify at up-rera.in

What is the ACE YXP RERA number?

UPRERAPRJ397607. A commercial project from ACE Group, bookable now from ₹1.50 Cr; possession date not stated in our source set — confirm on up-rera.in.

Verify at up-rera.in

What is the Whispers of Wonder RERA number?

UPRERAPRJ752382/09/2025, registered 2 September 2025 — Reported, not yet independently confirmed by us on the portal. Whispers of Wonder sits on a neighbouring Sector 22D plot to Echoes of Eden, same promoter SPV (Eldeco Sohna Projects Limited) but its own separate registration; Vidastu is not the appointed sales channel, so price and booking mechanics here are Unverified.

Verify at up-rera.in

What is the Ballads of Bliss RERA number?

UPRERAPRJ921261/05/2025, registered 21 May 2025 — Reported, not yet independently confirmed by us on the portal. A separate Eldeco Group project (promoter Eldeco Goodliving Properties Limited) on an adjacent Sector 22D plot; Vidastu is not its appointed sales channel, so current price and booking mechanics stay Unverified here.

Verify at up-rera.in

What is the ATS Allure RERA number?

UPRERAPRJ918, registered 31 July 2017, promoter ATS Realty Private Limited — confirmed directly on up-rera.in. Largely possession-complete per portals, but a February 2023 UP-RERA order found delivery still incomplete for 19 complainants and ordered possession within 60 days plus delay interest; full compliance with that deadline is not independently confirmed here.

Verify at up-rera.in · Full review →

What is the Purvanchal Sunbliss RERA number?

UPRERAPRJ746863/04/2025, registered 8 April 2025, promoter Purvanchal Projects Private Limited — confirmed directly on up-rera.in, declared completion 29 January 2030. Vidastu is not the appointed sales channel, so current price and booking mechanics stay Unverified here even though the registration itself is confirmed.

Verify at up-rera.in · Full review →

What is the Greenbay The Monarque RERA number?

UPRERAPRJ710489/10/2025. Promoter Green Bay Infrastructure Private Limited, confirmed via a sibling up-rera.in filing and an independent aggregator; declared completion 18 September 2029. This is a separate, newer filing from the older Greenbay Golf Village registration that covers the township’s amenities — not the same registration.

Verify at up-rera.in · Full review →

What is the County (Yamuna Expressway) RERA number?

No RERA registration number has surfaced — across 9 promotional domains checked, on any portal, or in a direct up-rera.in search. One of those domains states outright it is “not the official website of the developer.” Treat any number quoted to you for County as unverified until it appears on the state portal.

Verify at up-rera.in · Full review →

What is the Orion (Sector 22D) RERA number?

No RERA registration number has surfaced — across 10 promotional domains checked, on any portal, or in a direct up-rera.in search; one domain states verbatim, “RERA No: Update Soon.” Treat any number quoted to you for Orion as unverified until it appears on the state portal.

Verify at up-rera.in · Full review →

What is the Arihant Seasons 22D RERA number?

UPRERAPRJ974543/02/2026, stated verbatim on the developer’s own official page and cross-checked against two portals — but our own direct up-rera.in pass did not return a browsable result for this number, so we hold it at Reported rather than Confirmed. Ask for the registration certificate itself, not the number alone, before paying anything.

Verify at up-rera.in · Full review →

Sector 22A — YEIDA (2 named projects)

Two ACE Group filings, both bookable, both confirmed.

What is the ACE Verde RERA number?

UPRERAPRJ913692/03/2025. Bookable now from ₹2 Cr, possession April 2029.

Verify at up-rera.in

What is the ACE Hive RERA number?

UPRERAPRJ939595/03/2025. A commercial project from ACE Group, bookable now from ₹92 lakh; possession date not stated in our source set.

Verify at up-rera.in

Sector 19 — YEIDA, Gaur Yamuna City (1 named project)

Gaursons’ established township at Exit 2C, opposite the Buddh International Circuit — home to the corridor’s one still-unregistered pre-launch we track.

What is the Gaurs Studio Bento RERA number?

No verified RERA number — this is the corridor’s clearest “no registration yet” case, and three numbers circulate in broker chatter for it. Vidastu Advisory (UP-RERA agent UPRERAAGT000309/01/2026) found no project registered under the name Bento — as at our desk’s UP-RERA portal check of 21 August 2026, corroborated by our own register mirror read of 29 July 2026. The three numbers circulating for it resolve to three other Gaursons registrations — UPRERAPRJ342117, UPRERAPRJ351477 and UPRERAPRJ622344/11/2025, each named in full below. Every one of those three is a valid Gaursons registration covering a different building. Treat any number quoted to you for Bento as unverified; its Expression of Interest is refundable, reserves no unit and creates no contractual commitment.

Verify at up-rera.in · The three numbers, resolved · Full review →

Which three RERA numbers circulate for Gaurs Studio Bento, and what does each one actually register?

UPRERAPRJ342117, UPRERAPRJ351477 and UPRERAPRJ622344/11/2025. All three are genuine UP-RERA registrations held by Gaursons companies, and each one covers a different, validly registered project — none of them Bento. The mix-up sits in the listing ecosystem rather than with the developer: listing portals and broker-run project pages have attached other Gaursons registrations to a project still at its pre-registration codename stage. Read from our UP-RERA register mirror, last refreshed 29 July 2026, and corroborated at our desk’s portal check of 21 August 2026.

Number circulating for Bento What the register actually names Promoter on record Registered
UPRERAPRJ342117 Master Plan Commercial — Gaur Yamuna City. A township-level commercial filing, not a studio tower. Gaursons Realtech Private Limited 18 Nov 2020
UPRERAPRJ351477 Gaurs Runway Suites — Master Plan Commercial (Gaur Yamuna City). Gaursons Realtech Private Limited 18 Mar 2019
UPRERAPRJ622344/11/2025 Gaur Chrysalis (Phase 1), Plot GH-12, Sector 22D, YEIDA — a different sector from Gaur Yamuna City’s Sector 19. Gaursons Promoters Private Limited 4 Nov 2025

Checked by Vidastu Advisory at our desk's UP-RERA portal check of 21 August 2026, against a register mirror last refreshed 29 July 2026; the district on record is Gautam Buddha Nagar for all three. Searching that register for the name “Bento” returns nothing, so no number can be quoted as Bento’s own until Bento itself appears on the portal. Re-run each number yourself at up-rera.in, and see the full working at Gaur Bento RERA numbers.

Sector 150 — Noida Authority, adjacent market (1 named project)

Not a YEIDA sector and not on the Yamuna Expressway corridor covered above — included only as an explicitly labelled adjacent-market comparison row.

What is the ACE Arte (ACE Parkway 2.0) RERA number?

UPRERAPRJ528653/07/2026, registered July 2026. Bookable now, possession 15 February 2031. Sits in Sector 150 on the Noida Expressway under Noida Authority — an adjacent market, not YEIDA / Yamuna Expressway — and is a separate, later registration from the earlier, already-delivered ACE Parkway’s UPRERAPRJ4514.

Verify at up-rera.in · Full review →

How to verify any of these numbers yourself

Every number on this page should be checked directly on the official state portal before you rely on it — not taken on our word, a brochure’s word, or a broker’s word. The only official UP RERA portal is up-rera.in. Do not use look-alike sites — if the URL doesn’t end in up-rera.in, leave. This is the same walkthrough we publish in full, project-specific detail for Eldeco Echoes of Eden at RERA Verification, Step by Step; the steps below generalise to any project on this page.

  1. Open the UP RERA portal. Go to https://www.up-rera.in in a browser. Bookmark it — it is the only authoritative source for Uttar Pradesh RERA verification.
  2. Go to the Registered Projects search. Click “Registered Projects” in the top nav. This opens the search interface with filters for district, promoter and registration number.
  3. Enter the registration number. In the registration-number field, enter the exact number from the table above — for example, UPRERAPRJ950965/07/2026 for Gaur Alaris. Click Search.
  4. Verify project details. Cross-check the project name, promoter, district (Gautam Buddha Nagar for this corridor) and location against whatever brochure or claim you were given.
  5. Open the sanctioned layout plan. On the project page, open the “Sanctioned Plans” section — the uploaded master plan PDF is the legal footprint, not the brochure render.
  6. Check the promoter disclosure. Review the promoter tab for past projects, delivery status, and any pending RERA cases — the way ATS Allure’s 2023 order shows up on its own promoter record.
  7. Check the escrow bank account. Every RERA-registered project must disclose the account into which 70 percent of buyer payments are mandatorily deposited. Confirm it is present before paying anything into any other account.
  8. Save the verification. Screenshot or download the project page and keep it with your booking documents — it is your primary record if a claim mismatch ever comes up later.

If the number doesn’t return a match Stop. Don’t pay anything, and re-verify the number you were given — it may be mistyped, may belong to a different project entirely (as with the numbers that circulate for Gaurs Studio Bento), or the project may genuinely have no registration yet, as with County and Orion above.

Frequently asked questions

Where can I check any Yamuna Expressway project's RERA number myself?
Go to up-rera.in, click "Registered Projects," and search by the registration number, promoter name, or district (Gautam Buddha Nagar for this corridor). Every row in the lookup table above links there directly. If a number doesn't return a match, don't pay anything until it does.
Which Yamuna Expressway projects have no RERA number at all?
Three, in our source set: County (Yamuna Expressway) and Orion (Sector 22D) — 9 and 10 promotional domains checked respectively, no number on any of them — and Gaurs Studio Bento, where three numbers circulate in broker chatter but none checks out as this project's own. Treat any number quoted for these three as unverified until it appears on up-rera.in.
Kya sirf RERA number hone se project safe ho jaata hai?
Nahi. RERA registration escrow protection deta hai (70% buyer payments ek dedicated account mein jaate hain) aur ek sanctioned plan record karta hai — lekin delivery timeline guarantee nahi karta. ATS Allure ka registration 2017 se hai, phir bhi ek February 2023 UP-RERA order mein 19 complainants ke liye possession abhi tak incomplete paaya gaya tha. Number check karne ke saath-saath escrow account aur promoter ka delivery record bhi verify karo.
Kya EOI dena RERA registration hone ka proof hai?
Nahi — ulta hai. Expression of Interest isliye hota hai kyunki project abhi RERA-registered nahi hai; ek refundable interest hai, booking ya allotment nahi. Is corridor ka abhi-EOI-only project, Gaurs Studio Bento, humari list mein koi verified RERA number nahi rakhta. Number tabhi maano jab wo khud up-rera.in par dikhe.
What's the difference between a "confirmed" and a "reported" RERA number on this page?
Confirmed means we, or the developer's own official page, checked the registration directly on up-rera.in, or two or more independent sources agree. Reported means exactly one named, dated source — including a portal listing or the developer's own brochure — that we have not yet independently re-checked against the live portal ourselves. Three numbers here (Whispers of Wonder, Ballads of Bliss, Arihant Seasons 22D) sit at Reported; ask for the registration certificate itself, not just the number, before relying on those.
Are ACE Arte and the earlier ACE Parkway the same RERA registration?
No — two separate filings under the same developer brand. ACE Arte (formerly ACE Parkway 2.0), in Sector 150 on the Noida Expressway, carries UPRERAPRJ528653/07/2026, registered July 2026. The earlier, already-delivered ACE Parkway carries a different, older registration, UPRERAPRJ4514. Neither number covers the other project.
How current is the data on this page?
Every row is dated with its own last-verified date and traces back to Vidastu's open data file, data/corridor.json (schema v2.0) — the file's own updatedAt stamp is 2026-07-30. Prices, possession dates and RERA status change; always re-check the live registration on up-rera.in yourself before paying anything, rather than relying on any date stamp here alone.
Does this page cover every project ever launched on the Yamuna Expressway?
No — it covers the eighteen named projects our own corridor research tracks, concentrated in YEIDA Sector 22D and 22A plus Sector 19 (Gaur Yamuna City) and one explicitly-labelled adjacent-market row (Sector 150, Noida Authority, not YEIDA). New launches and projects outside our research set won't appear here until we've reviewed them; a project's absence from this page is not a statement about its registration status.
How do I file a complaint about a UP-RERA registered project?
Complaints about a UP-RERA registered project or promoter are filed by the buyer directly with the authority, on its own portal — up-rera.in — not through a channel partner or agent. Keep the project's RERA registration number handy (see the lookup table above), since the portal asks for it. We haven't independently verified UP-RERA's current complaint fee, format requirements or resolution timeline, so confirm those on the portal itself rather than from any third-party summary, including this one.
Sources cited above
  1. Vidastu — corridor.json — raw source data behind this page, free to reuse with attribution (schema v2.0)
  2. Vidastu — Yamuna Expressway Live Index — the fuller status picture (price, possession, sold-out/EOI/bookable) behind these same RERA numbers
  3. Vidastu — Sector 22D, Yamuna Expressway: All Projects Compared (2026)
  4. Vidastu — RERA Verification, Step by Step (full project-specific walkthrough)
  5. Vidastu — ATS Allure, Yamuna Expressway: Honest Review (2026)
  6. Vidastu — County, Yamuna Expressway: Honest Review (2026)
  7. Vidastu — Orion, Sector 22D: Honest Review (2026)
  8. UP RERA — official project registration search
Vidit Kaushik, Founder, Vidastu Developers Pvt. Ltd.

Vidit Kaushik

Civil Engineering, BITS Pilani · UP-RERA Agent UPRERAAGT000309/01/2026 · Founder, Vidastu Developers Pvt. Ltd.

Can’t find a project’s RERA number, or the number looks off?

Tell our advisory desk which project you’re checking — we’ll walk you through the up-rera.in search live and flag anything that doesn’t reconcile before you pay a rupee.