Verify Eldeco EOE on the UP RERA portal, step by step

The exact clicks to confirm registration UPRERAPRJ125342/02/2026 on the official UP RERA portal — ten minutes, no broker required.

The short answer

Eldeco Echoes of Eden is RERA-registered as UPRERAPRJ125342/02/2026 with the Uttar Pradesh Real Estate Regulatory Authority. To verify, visit up-rera.in, click “Registered Projects,” and enter the registration number. The project appears under Eldeco Sohna Projects Limited, Sector 22D, Gautam Buddha Nagar. Always cross-check on the official portal before any payment. For a one-page snapshot of the same register entry — documents and quarterly updates together — you can also see the EOE record on UP RERA Tracker, an independent reference built from UP-RERA records.

Before paying a single rupee to any real estate project in Uttar Pradesh — including Eldeco Echoes of Eden — verify its RERA registration yourself on the official portal, and cross-check the developer-published facts on eldecoeoe.com/facts. This guide walks you through every click. At the end, you’ll have a downloaded verification page for your records.

What you need before starting

  • A device with internet access (laptop recommended, mobile works)
  • The registration number: UPRERAPRJ125342/02/2026
  • 10 minutes of focused time
  • A way to save PDFs / take screenshots

Spoofed-portal warning

The only official UP RERA portal is up-rera.in. Do not use look-alike sites (rera-up.com, uprera.org.in, etc.) — they are unofficial aggregators. If the URL doesn’t end in up-rera.in, leave.

The 8-step verification

Open the official UP RERA portal

In any browser, go to https://www.up-rera.in. Bookmark this URL — it is the only authoritative source for Uttar Pradesh RERA verification. The homepage shows a government emblem and the Uttar Pradesh Real Estate Regulatory Authority branding.

Go to “Registered Projects” search

In the top navigation, find the Registered Projects or “Project Details” section. This opens the master search interface. You’ll see filter fields for district, promoter name, and registration number.

Enter the registration number exactly

Paste UPRERAPRJ125342/02/2026 into the registration-number field. Use the exact format — slashes and all. Hit Search. Eldeco Echoes of Eden will appear as the single matching project.

Open the project page and cross-check basics

Click into the project. Verify the following fields match what’s in any brochure or sales claim:

  • Project name: Eldeco Echoes of Eden
  • Promoter: Eldeco (the registered promoter entity)
  • District: Gautam Buddha Nagar
  • Location: Sector 22D, Yamuna Expressway
  • Project type: Residential Group Housing
  • Status: Registered / Active

If any field is materially different from what you’ve been told, stop the booking and raise the discrepancy with the seller in writing.

Open the Sanctioned Plans section

Scroll to the Sanctioned Plans or “Approved Plans” tab. The developer uploads the master-plan PDF and tower-wise building plans here. These are the legal footprint. Any brochure claim about tower count, amenity location, or floor plate that contradicts these uploaded plans is not binding on the developer.

Check Promoter Disclosure

Open the Promoter tab. This shows Eldeco’s complete UP project portfolio — both active and past. Look for:

  • Past projects with delivery status — delivered / under-construction count
  • Any pending RERA cases against the promoter
  • Litigation history (if surfaced)

For a large listed developer, the list will be extensive. Skim for any red-flag pattern (repeated delay complaints, clustered cases) — for Eldeco specifically, no such red-flag cluster exists as of April 2026.

Verify the Escrow Bank Account

Under RERA rules, every registered project must maintain an escrow account into which 70% of buyer payments are mandatorily deposited. Open the Financial Details or Escrow tab — the bank name and account will be listed. When you pay the booking amount, cross-check that the developer’s collection account matches or maps to this RERA-disclosed escrow account. Any request to pay into a different bank or individual account is a hard stop.

Save the page for your records

Take a full-page screenshot, or use the browser’s Print → Save as PDF option. File it with your booking documents. If any future dispute arises, this is your primary defence — it proves what the public record showed on the day you entered the agreement.

What to do if something doesn’t match

“RERA wins. A brochure is a marketing document — the sanctioned plan is the legal footprint.”

RERA vs brochure — which wins

Claim sourceLegally binding?What it’s good for
UP RERA portal (up-rera.in)Yes — statutory recordThe ground truth: tower count, floor plate, amenities, promoter, escrow
Sanctioned layout / building plans (on RERA)YesLegal footprint; governs what the developer can build
Allotment letter / builder–buyer agreementYes, once signedYour specific unit commitments; always read before signing
Developer brochureMarketing documentHelpful for amenity renderings; not a binding spec
Channel partner / broker verbal claimsNot bindingGuidance only; always verify with the sources above

What RERA does not cover

For these you’ll need independent research. Our total-cost calculator, rental-yield post, and full spec breakdown cover those gaps.

Talk to the desk

Need help reading the RERA file?

Vidit can walk you through each uploaded document on a quick call — sanctioned plan, promoter disclosure, escrow details. No charge, no sales pressure.

+91 98114 05300

Mon–Sat 10–7 · Sunday, phone & WhatsApp only

Your number goes to the desk — not a call-centre.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Keep reading

Frequently asked questions

What is the RERA number for Eldeco Echoes of Eden?
UPRERAPRJ125342/02/2026 — registered with Uttar Pradesh Real Estate Regulatory Authority, verifiable on the official portal up-rera.in.
What is the official UP RERA website?
The official UP RERA portal is https://www.up-rera.in. It is the only authoritative source for Uttar Pradesh RERA project verification. Beware of look-alike sites.
Is it safe to buy an apartment without checking RERA?
No. Under RERA rules, residential apartment projects over 500 square meters must be registered. Buying an unregistered apartment project is a legal risk and a signal to walk away.
What should I download from the RERA portal?
At minimum — project registration certificate, sanctioned layout plan, promoter disclosure, escrow account details, and the quarterly progress report (once construction begins). Save all to your booking file.

Disclaimer: Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026) is an authorized channel partner for Eldeco Echoes of Eden (UPRERAPRJ125342/02/2026). Verify all project details directly on the UP-RERA portal (up-rera.in) before making any payment. This guide is informational and does not replace independent verification. This is not financial or investment advice.