Eldeco Echoes of Eden price list & floor plans 2026

Complete BSP pricing, RERA carpet areas, the 30:40:30 payment plan milestone by milestone, and how to get the actual floor plan PDFs — everything a serious buyer needs, in one place.

The short answer

Eldeco Echoes of Eden is currently priced at ₹10,999 per sq ft* super area, plus other charges, as on 24 September 2026 (BSP) on super area, applicable to Caelum tower only — Haven and Elysian are fully booked, and the 2 BHK is sold out project-wide. Unit prices for the 3 BHK + 2T (1,550 sq.ft), the 3 BHK + 3T (1,850 sq.ft) and the 4 BHK come on the dated cost sheet. Add 5% GST, 7% UP stamp duty, 1% registration plus IBMS, PLC, parking and club for the all-in cost, which comes on the dated cost sheet on WhatsApp, in writing. Booking is direct — up to 10% of BSP, no separate EOI. RERA: UPRERAPRJ125342/02/2026.

Buying a home is the most significant financial decision most families make. We believe in full transparency — this page breaks down every number you need: the base selling price per configuration, what your actual apartment area works out to under RERA, how the 30:40:30 payment plan plays out milestone by milestone, and what the all-in cost includes beyond the BSP.

We are Vidastu Advisory (UP-RERA Agent Reg. UPRERAAGT000309/01/2026), the authorized channel partner for Eldeco Echoes of Eden. If you need the official costing sheet, EOE floor plans, or a site visit, call Vidit directly.

Current BSP: ₹10,999 per sq ft* on super area, plus other charges, as on 24 September 2026 (Caelum tower)

The Base Selling Price (BSP) for Eldeco Echoes of Eden is ₹10,999 per sq ft* super area, plus other charges, as on 24 September 2026, applicable to Caelum tower only, since Haven and Elysian are fully booked. This is pre-airport pricing — buyers who book now (direct booking, up to 10% of BSP, no separate EOI) are locking in today’s rate before the Jewar Airport corridor re-prices.

2 BHK + 2T — Sold out
1,250 sq.ft super area
Sold out
3 BHK + 2T · Most popular
1,550 sq.ft super area
On the dated cost sheet
3 BHK + 3T
1,850 sq.ft super area
On the dated cost sheet
4 BHK Penthouse
2,700 sq.ft (Duplex)
On the dated cost sheet
4 BHK Grand PH
3,150 sq.ft (Duplex + Store)
On the dated cost sheet

Complete price list — all configurations

ConfigurationSuper areaCarpet area (RERA)Balcony / terraceBSP price*
2 BHK + 2T — Sold out 1,250 sq.ft 700.31 sq.ft 135.84 sq.ft Sold out
3 BHK + 2T · Popular 1,550 sq.ft 870.70 sq.ft 218.40 sq.ft on the dated cost sheet
3 BHK + 3T 1,850 sq.ft 1,056.81 sq.ft 326.15 sq.ft on the dated cost sheet
4 BHK Penthouse 2,700 sq.ft (Duplex) 1,558.39 sq.ft 403.96 sq.ft terrace on the dated cost sheet
4 BHK Grand Penthouse 3,150 sq.ft (Duplex + Store) 1,819.20 sq.ft 604.93 sq.ft terrace on the dated cost sheet

*BSP ₹10,999 per sq ft* super area, plus other charges, as on 24 September 2026, applicable to Caelum tower only (Haven and Elysian are fully booked; 2 BHK sold out). Carpet area as per RERA Act 2016. Prices are indicative and subject to change. GST, PLC, IFMS, parking, and registration charges are additional.

What’s included in BSP — and what’s additional

The BSP is just the starting point. The complete all-in cost includes the following additional charges that every buyer must factor in:

All-in cost components

Base Selling Price (BSP)₹10,999/sq.ft* super area, plus other charges, 24 September 2026 × super area
Preferred Location Charges (PLC)Floor & view-based — call for exact
GST5% on (BSP + PLC)
Car parking — coveredAs per allotment — call for pricing
IFMS / Corpus fundAs per RERA schedule
Legal & documentationIncluded / nominal
Stamp dutyAs per UP government schedule
Registration chargesAs per UP government schedule

For the complete costing sheet with exact PLC by floor, GST calculation, and all-in price for your specific configuration, contact Vidit — this is shared via WhatsApp during or before the site visit.

Get the complete costing sheet

Detailed all-in cost with PLC, GST, and payment schedule for your configuration.

The 30:40:30 payment plan — how it works

Eldeco Echoes of Eden uses a construction-linked 30:40:30 payment plan — one of the more buyer-friendly structures in the market. You commit only 30% upfront, with the remaining 70% spread across construction milestones and possession.

30%On allotmentBooking + allotment confirmation
40%Construction-linked4 milestone payments during construction
30%On possessionAt the time of key handover

What this means for a 3 BHK + 2T

Add GST, PLC, parking, IFMS, and stamp duty to get the complete outflow. The exact milestone schedule is in the allotment letter, RERA-compliant.

Floor plans — configuration-by-configuration breakdown

All apartments in Eldeco Echoes of Eden are 3-side open corner units on a podium-based layout. This is not marketing language — the three towers (Elysian, Haven, Caelum) are positioned such that every corner unit has openings on three sides, delivering better natural light, cross-ventilation, and views. No building directly facing you on multiple sides.

2 BHK + 2T

Super area1,250 sq.ft
Carpet area700.31 sq.ft
Balcony135.84 sq.ft
Bedrooms2 + study foyer
Bathrooms2 attached
AC provisionVRV (pre-installed)
BSPSold out

3 BHK + 2T — most popular

Super area1,550 sq.ft
Carpet area870.70 sq.ft
Balcony218.40 sq.ft
Bedrooms3 (master + 2)
Bathrooms2 attached
AC provisionVRV (pre-installed)
BSP₹10,999/sq.ft* super area, plus other charges, 24 September 2026

3 BHK + 3T — premium 3 BHK

Super area1,850 sq.ft
Carpet area1,056.81 sq.ft
Balcony326.15 sq.ft
Bedrooms3 (all master-sized)
Bathrooms3 attached
AC provisionVRV (pre-installed)
BSP₹10,999/sq.ft* super area, plus other charges, 24 September 2026

4 BHK Penthouse — duplex

Super area2,700 sq.ft
Carpet area1,558.39 sq.ft
Private terrace403.96 sq.ft
LevelsDuplex — 2 floors
Bedrooms4
Terrace viewExpressway + greens
BSP₹10,999/sq.ft* super area, plus other charges, 24 September 2026

4 BHK Grand Penthouse — duplex + store

Super area3,150 sq.ft
Carpet area1,819.20 sq.ft
Private terrace604.93 sq.ft
LevelsDuplex + dedicated store room
Bedrooms4
Terrace viewPanoramic — expressway views
BSP₹10,999/sq.ft* super area, plus other charges, 24 September 2026

Is the Eldeco EOE basic sale price competitive on Yamuna Expressway?

In short: yes, and the window won’t last long.

“The three towers are positioned so every corner unit opens on three sides — better light, better cross-ventilation, no building staring back at you.”

How to get the actual floor plan PDF

Actual architectural floor plan PDFs (with room dimensions, door positions, balcony orientations) are shared personally via WhatsApp to avoid misinterpretation without context. We don’t post them publicly because floor preference varies based on tower, wing, and facing — and a knowledgeable conversation helps you pick the right unit.

Get floor plans + cost sheet on WhatsApp

Detailed floor plans for all 5 configurations sent directly to your phone — with Vidit available to explain any unit-specific questions.

Steps to book — Eldeco Echoes of Eden

  1. Pay the booking amount directly — up to 10% of BSP (Sec-13 cap), no separate EOI
  2. Receive the allotment letter with confirmed unit, floor (Caelum tower — Haven and Elysian are fully booked), and complete payment schedule
  3. Visit the Sales Gallery at Sector 22D, Yamuna Expressway
  4. Execute the RERA-compliant Builder Buyer Agreement
  5. Follow the 30:40:30 milestone payment schedule

Also read: Best flats near Jewar Airport 2026, why invest in Yamuna Expressway 2026, an honest review of Eldeco EOE, the Akshaya Tritiya 2026 offer, and EOE vs other YEW projects.

Talk to the desk

Get the exact costing sheet for your configuration

BSP is only the starting line. Give us two lines and we’ll walk you through carpet area, GST, PLC, parking and stamp duty on one call — no spam, no pressure.

+91 98114 05300

Mon–Sat 10–7 · Sunday, phone & WhatsApp only

Your number goes to the desk — not a call-centre.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Frequently asked questions

What is the price of Eldeco Echoes of Eden 3 BHK?
Eldeco Echoes of Eden 3 BHK + 2T is priced on the dated cost sheet (1,550 sq.ft super area at BSP ₹10,999/sq.ft* super area, plus other charges, 24 September 2026). The 3 BHK + 3T is on the dated cost sheet (1,850 sq.ft). These are BSP prices — GST, PLC, parking, and other charges are additional.
What is the all-in cost for Eldeco Echoes of Eden?
The all-in cost for Eldeco Echoes of Eden includes BSP (₹10,999 per sq ft* super area, plus other charges, as on 24 September 2026) + GST (5%) + Preferred Location Charges (PLC, floor-dependent) + car parking charges + IFMS/Corpus fund + stamp duty and registration (per UP schedule). Contact Vidit at +91 98114 05300 for the complete costing sheet for your specific configuration and floor.

Disclaimer: Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026) is an authorized channel partner for Eldeco Echoes of Eden (UPRERAPRJ125342/02/2026). All prices are BSP on super area at the time of writing and are subject to revision. GST, PLC, IFMS, car parking, stamp duty, and registration charges are additional. Carpet area as per RERA Act 2016. Verify all details on the UP-RERA portal before purchase. This is not an offer to sell.