Sector 22D on the Yamuna Expressway — the closest premium sector to Jewar Airport

A complete location guide to the most important stretch of the Yamuna Expressway in 2026 — connectivity, YEIDA infrastructure, neighbouring sectors, and the launched projects worth knowing about.

The short answer

Sector 22D is a YEIDA-planned residential sector on the Yamuna Expressway, Greater Noida — approximately 10 minutes from Noida International Airport (Jewar) and 35 minutes from Greater Noida West. It hosts premium projects including Eldeco Echoes of Eden, and its neighbours have seen launches from ATS, Migsun and Oasis. Connectivity runs on the Yamuna Expressway today, with the Noida Metro Aqua Line extension planned through the corridor.

Open in Sector 22D right now

Two homes in the sector our desk can open today. Both sit on the UP-RERA register, and we will put a dated cost sheet for either one in writing.

Eldeco Echoes of Eden, Caelum tower. Registered as UPRERAPRJ125342/02/2026, with 11 January 2031 recorded on the register as the completion date. The basic sale price for Caelum is ₹10,999 per sq ft* on super area, plus other charges, as on 24 September 2026, with Haven and Elysian fully booked. Read the Echoes of Eden pages.

Eldeco Ballads of Bliss, owner resale. Registered as UPRERAPRJ921261/05/2025 and sold out since June 2025 per Eldeco's own announcement, so resale is the route in. One 3 BHK of 1,550 sq.ft super area is open at ₹8,299/sq.ft* on super area plus other charges, with the full figure on the unit sheet. Read the Ballads unit.

Ask what is open in Sector 22D →

Sector 22D in September 2026

The UP-RERA register listed 15 projects in Sector 22D when we read it on 25 August 2026, the 15 reproduced below. Eldeco Echoes of Eden is the one we can confirm as open for booking as of 1 September 2026; Gaur Alaris closed Phase 1 bookings on 1 September 2026, and the sector's earlier Gaur Chrysalis Phase 1 is reported sold out.

Two of our own pages state the same roughly 10-minute drive to Jewar Airport as two different distances: roughly 10–12 km on our Jewar Airport distance guide, and roughly 12–15 km on our corridor connectivity matrix. Both describe the same route, so treat 10–15 km as the honest range for Sector 22D until you check the live route for your own plot.

Of the 25+ YEIDA sectors along the Yamuna Expressway, one is consistently flagged by channel partners, institutional buyers, and airport-corridor analysts as the highest-potential residential address: Sector 22D. This guide explains exactly what Sector 22D is, why it matters, how it compares to neighbouring sectors, and what to look for when evaluating a property purchase here.

Where is Sector 22D?

Every Sector 22D project on the UP-RERA register

Read directly from the Uttar Pradesh RERA register on 25 August 2026: 15 projects are registered at Sector 22D, Yamuna Expressway (YEIDA). Ordered by registration date, newest first. Every figure below is the filing itself — the registration number, the promoter of record, and the completion date as declared. Each project name links to its full register record.

Registered 2024–2026

ProjectUP-RERA registrationPromoter on recordRegisteredCompletion on record
Gaur Alaris (Phase 1)UPRERAPRJ950965/07/2026Gaursons India Private Limited28-07-202609-06-2031
Eldeco Echoes Of EdenUPRERAPRJ125342/02/2026Eldeco Sohna Projects Limited27-02-202611-01-2031
Arihant SeasonsUPRERAPRJ974543/02/2026Arihant Urban Space Private Limited24-02-202605-01-2031
Vvip YamunaUPRERAPRJ677791/02/2026Vvip Infrahome Private Limited05-02-202630-10-2030
Gaur Chrysalis (Phase 1)UPRERAPRJ622344/11/2025Gaursons Promoters Private Limited04-11-202505-10-2030
Ace EditUPRERAPRJ467686/09/2025Logix Buildestate Pvt Ltd11-09-202530-04-2029
Purvanchal Sunbliss Plot No. Gh-1A/1 Sector 22D YeidaUPRERAPRJ746863/04/2025Purvanchal Projects Private Limited08-04-202529-01-2030
Oasis Grandstand Phase-2UPRERAPRJ585804/01/2025Oasis Realtech Pvt Ltd25-01-202523-01-2029
Ace EstateUPRERAPRJ442226/10/2024Logix Buildestate Pvt Ltd28-10-202431-12-2025
Ace TerraUPRERAPRJ683816/04/2024Ajay Realcon India Llp04-04-202428-12-2028

Earlier Sector 22D registrations on the same record

ProjectUP-RERA registrationPromoter on recordRegisteredCompletion on record
Convenient Shopping Complex, Sector 22DUPRERAPRJ15338Yamuna Expressway Industrial Devlopment Authority28-02-201830-06-2018
GH06, Sec-22D, YEIDAUPRERAPRJ8947Yamuna Expressway Industrial Devlopment Authority10-08-201730-12-2019
Affordable Housing Sector-22D YEIDAUPRERAPRJ8647Yamuna Expressway Industrial Devlopment Authority09-08-201728-12-2019
Rps-02, Sec-22DUPRERAPRJ8756Yamuna Expressway Industrial Devlopment Authority09-08-201710-09-2019
Ats AllureUPRERAPRJ918Ats Realty Private Limited31-07-201704-09-2019

Verify any of these yourself on the official portal at up-rera.in before you pay anything. Vidastu Advisory is a UP-RERA registered agent, UPRERAAGT000309/01/2026, and is not the developer of any project listed.

Sector 22D is a planned residential sector under the Yamuna Expressway Industrial Development Authority (YEIDA), located directly off the Yamuna Expressway in Gautam Buddha Nagar district, Uttar Pradesh. It sits between two critical infrastructure anchors — the Noida International Airport at Jewar to the south and the established Greater Noida urban belt to the north.

Sector 22D, Yamuna Expressway is a YEIDA-planned residential sector in Gautam Buddha Nagar, Uttar Pradesh — about 10 minutes’ drive from Noida International Airport (Jewar) and roughly 20 minutes from Pari Chowk, Greater Noida.

Sector 22D — quick reference

AuthorityYEIDA
DistrictGautam Buddha Nagar, UP
Distance to Jewar Airport~10 minutes
Distance to Noida Sector 18~35–40 minutes
Distance to Pari Chowk~20 minutes
Expressway accessDirect off YEW
Land useResidential + mixed-use
Flagship projectEldeco Echoes of Eden

Why Sector 22D matters more than other YEIDA sectors

Not every sector along the Yamuna Expressway will develop the same way. The corridor is long, and the pace differs sharply pocket to pocket. Sector 22D is one of those pockets because it combines four structural advantages that most sectors have only one or two of.

1. The 10-minute airport rule

What buyers on this corridor pay a premium for is the drive time to the terminal. Sector 22D is firmly inside the 10-minute zone from Noida International Airport. Sectors 17, 18, 20 and 22 also qualify; sectors 32+ are outside it.

2. Direct expressway access

Many interior sectors require a 5–10 minute drive through service roads before reaching the expressway. Sector 22D has direct access, which matters for daily commutes and for letting the flat out later.

3. YEIDA infrastructure readiness

Internal roads, water, power and sewage infrastructure is already developed. This distinguishes 22D from deeper greenfield sectors where infrastructure is still being laid. For end-users, this means habitability at possession, not three years after. It also matters if you hold a residential plot nearby — with trunk infrastructure in place, nothing stops you from getting your naksha sanctioned by YEIDA and starting work the same season.

4. Limited premium launched supply

Only a handful of premium residential projects have launched in Sector 22D so far. The most prominent is Eldeco Echoes of Eden, alongside Gaurs’ peacock-themed project at the same address — see our review of Gaur Alaris price, floor plans and location for the second half of the picture. Limited supply paired with rising demand is a textbook pricing setup.

Weighing options beyond this corridor? We also independently review Gulshan Empire, a separate NCR location at Wave City, Ghaziabad, with its own connectivity and pricing profile — the full read on that address is at Gulshan Empire Wave City. For a same-district comparison instead of a different city, see this project-by-project comparison against ACE Arte in Sector 150, Noida — a different corridor within the same Gautam Buddha Nagar district as Sector 22D.

Sector 22D vs neighbouring YEIDA sectors

SectorAirport driveInfrastructureLaunched premium supply
Sector 22D~10 minDevelopedLimited (Eldeco EOE)
Sector 17A~15 minDevelopedModerate (Godrej, ATS peers)
Sector 18~12 minPartialLow
Sector 20~15 minPartialLow
Sector 32~25 minEmergingVery low

For our full sector-wise pricing breakdown, see Yamuna Expressway Property Rates 2026.

Connectivity from Sector 22D

How far is Sector 22D from Jewar Airport in kilometres?

Roughly 10 to 12 km by road — the ~10-minute figure above expressed as distance rather than time. That reading comes from the distance claims already published across our own and partner project pages and collected in our Jewar Airport distance guide; we publish it as a range because your exact plot and the service road you enter from move it by a kilometre either way. Our sector-by-sector corridor connectivity matrix reads the same stretch a little longer, at roughly 12 to 15 km, so treat anything inside that spread as the honest answer and check the live route for your own address before you rely on it. For the same drive measured against Delhi’s existing airport, see our Jewar versus IGI Delhi comparison.

What is the nearest metro station to Sector 22D?

There isn’t one — Sector 22D has no metro station today, and none adjacent to it. The nearest operating service is the Noida–Greater Noida Aqua Line, whose closest stations sit in the Greater Noida and Pari Chowk area: about a 20-minute drive from the sector, per the connectivity list above. That is a road connection to a metro, not a metro connection — a real difference if you were picturing a walk to a platform.

Three planned links are meant to change that, and each is worth understanding at its actual stage rather than its brochure stage. The Aqua Line extension toward Noida International Airport is planned through the YEIDA corridor, and a pod taxi link between Film City, the airport and the YEIDA sectors is planned alongside it. Separately, the Ghaziabad–Jewar rapid-rail (RRTS) extension is at planning and DPR-revision stage — not approved, not under construction. Planned and under construction are not the same thing, and on this corridor the difference has historically been measured in years. Our confirmed-timeline versus broker-hype breakdown keeps each of these tagged and dated. If a sales pitch tells you the metro is coming to Sector 22D, ask which line, at which stage, with which approval — and buy on the road access that exists today, not the rail that might.

What you get for your money in Sector 22D

Eldeco Echoes of Eden, the premium listed-developer project we represent in Sector 22D, is at ₹10,999 per sq ft* super area, plus other charges, as on 24 September 2026.

“A 3 BHK in Sector 22D at this pricing works out to ₹1.3–1.8 crore all-in — below the NCR premium-apartment median, despite being closer to a major airport than Gurugram or South Delhi.”

Eldeco Echoes of Eden — the flagship Sector 22D launch

Among launched projects in Sector 22D, Eldeco Echoes of Eden is the clear benchmark. Three reasons:

Which Sector 22D projects can you actually book today?

Eldeco Echoes of Eden is the Sector 22D project we can confirm as open for booking today, based on its own published status and UP-RERA filings. Gaur Alaris closed Phase 1 bookings on 1 September 2026. The sector's earlier Gaur Chrysalis Phase 1 is reported sold out, and Gaur Alaris is the RERA-registered continuation of what was marketed pre-registration as Gaur Plume.

ProjectUP-RERAStatusConfigurationBSP
Eldeco Echoes of EdenUPRERAPRJ125342/02/2026Bookable3 BHK+ (2 BHK sold out)₹10,999/sq.ft* super area, plus other charges, 24 September 2026
Gaur AlarisUPRERAPRJ950965/07/2026Bookings closed 1 Sep 20263 BHK only — 1,550 & 1,950 sq.ft₹9,000/sq.ft (revised 23 Aug 2026)
Gaur Chrysalis Phase 1UPRERAPRJ622344/11/2025Reported sold out——

Gaur Alaris sits on Plot GH-13 in Sector 22D, promoted by Gaursons India Private Limited across 8 towers, with a RERA-filed possession date of 9 June 2031. The Gaurs sales desk reports more than 1,200 allotment cheques received as of 25 August 2026, and its basic sale price (BSP) moved to ₹9,000/sq.ft on 23 August 2026. Our full write-up lives on the Gaur Alaris (Gaur Plume) project page. The project keeps a separate reference site of its own, where the registration and the filed document set for Gaur Alaris are read page by page.

Eldeco’s Ballads of Bliss (UPRERAPRJ921261/05/2025) and Whispers of Wonder (UPRERAPRJ752382/09/2025) are also RERA-registered in Sector 22D; the table above covers only the projects whose current booking status we have confirmed directly, so ask our desk for a live read on the other two.

Gaur Alaris — at a glance

Project
Gaur Alaris (registered name; earlier called Gaur Plume and Gaur Chrysalis 2.0)
Promoter
Gaursons India Private Limited
Location
Plot GH-13, Sector 22D, Yamuna Expressway (YEIDA), Gautam Buddh Nagar, Uttar Pradesh
UP-RERA
UPRERAPRJ950965/07/2026, registered 28 July 2026
Configurations
3 BHK only — 1,550 sq.ft and 1,950 sq.ft saleable area
BSP
₹9,000/sq.ft — revised 23 August 2026
Possession
9 June 2031, per the project’s own UP-RERA filing
Towers
8

Facts on this card were last verified by the Vidastu Advisory desk on 25 August 2026. Vidastu Advisory is a UP-RERA registered agent, UPRERAAGT000309/01/2026, and is not the developer of Gaur Alaris.

Whichever project you're weighing, the registration number is the fastest way to confirm what's actually filed — check it directly on the UP-RERA portal before booking, regardless of what a sales conversation promises.

Want a site visit to Sector 22D?

We'll organise the drive, walk you through the master plan, and show the launch units at Eldeco Echoes of Eden.

Frequently asked questions

Where exactly is Sector 22D?
Sector 22D is a YEIDA residential sector directly off the Yamuna Expressway in Gautam Buddha Nagar district, Uttar Pradesh, approximately 10 minutes' drive from Noida International Airport at Jewar.
What is the current price per sq.ft in Sector 22D?
Premium launched apartment projects in Sector 22D are currently priced as follows: Gaur Alaris at ₹9,000/sq.ft, revised 23 August 2026, and Eldeco Echoes of Eden at ₹10,999 per sq ft* super area, plus other charges, as on 24 September 2026. Plot prices in YEIDA categories vary by category and subvention — if you're buying land rather than a flat, see what it costs to build on a Sector 22D plot, or our dedicated guide to YEIDA Sector 18 house construction for the neighbouring RPS-10 plot sector.
Which is the best project in Sector 22D right now?
Eldeco Echoes of Eden is the flagship launched premium project — developed by NSE/BSE listed Eldeco Group, RERA registered (UPRERAPRJ125342/02/2026), with VRV AC and a basic sale price of ₹10,999 per sq ft* super area, plus other charges, as on 24 September 2026.
How far is Sector 22D from Noida Sector 18 / Delhi?
Sector 22D is approximately 35–40 minutes from Noida Sector 18 via the Yamuna Expressway (off-peak), and about 50–60 minutes from central Delhi depending on entry point.
Will Sector 22D get metro connectivity?
Yes — the Aqua Line metro extension toward Noida International Airport is planned to pass through the YEIDA corridor. Additionally, a pod taxi link between Film City, the airport and YEIDA sectors is planned.
Which residential projects are in Sector 22D?
Sector 22D's launched residential projects include Eldeco Echoes of Eden (RERA UPRERAPRJ125342/02/2026), the bookable flagship; Gaur Chrysalis Phase 1 (RERA UPRERAPRJ622344/11/2025), which is sold out; its later phase Gaur Alaris, now RERA-registered as Gaur Alaris (UPRERAPRJ950965/07/2026), which closed Phase 1 bookings on 1 September 2026 at a BSP of ₹9,000/sq.ft revised 23 August 2026; and Eldeco's Ballads of Bliss (UPRERAPRJ921261/05/2025) and Whispers of Wonder (UPRERAPRJ752382/09/2025). See our side-by-side comparison of Sector 22D projects.
Is Sector 22D a good investment in 2026?
Sector 22D's case rests on being one of the closest premium residential sectors to the now-operational Noida International Airport at Jewar, with RERA-registered launches from established developers. As with any corridor purchase, verify each project's RERA status and weigh the documented record against the risks, both of which are set out in our sourced Yamuna Expressway investment guide.
Are there 1 BHK flats in Sector 22D?
Almost none — Sector 22D's launched supply is dominated by 3 BHK and larger, and Eldeco Echoes of Eden's 2 BHK is sold out project-wide. The one exception on the record is Purvanchal Sunbliss, whose own marketing lists a compact 1 BHK/studio format — see our Purvanchal Sunbliss review for the sourced details and verify sizes directly before relying on them. The predominant available size today is 3 BHK, as at Eldeco Echoes of Eden and Gaur Alaris.
Are there ready-to-move flats in Sector 22D?
No — every launched project in Sector 22D is still under construction; there is no ready-to-move availability in the sector today. Among the projects still open to buyers, the earliest RERA-filed possession is January 2031 (Eldeco Echoes of Eden), with Gaur Alaris filed for June 2031. If a near-immediate move-in is the priority, this specific YEIDA pocket isn't the right fit yet — ask our desk about corridor options with a shorter timeline.
What is Sector 22D's official YEIDA master plan?
That's a different document from what we publish. YEIDA's own land-use master plan for Sector 22D — the authority's official sector layout and zoning — is filed with and published by the Yamuna Expressway Industrial Development Authority itself. What we publish is our own side-by-side comparison of the developer projects launched within the sector — a buyer's research tool, not the authority's land-use plan. For the official YEIDA document, check with the authority directly or ask our desk to help cross-reference a specific plot.
Is Gaur Alaris in Sector 22D open for booking?
Gaur Alaris, the RERA-registered project on Plot GH-13 in Sector 22D (UPRERAPRJ950965/07/2026), closed Phase 1 bookings on 1 September 2026. Its 3 BHK homes are 1,550 and 1,950 sq.ft, and the BSP on the closing list was ₹9,000/sq.ft, revised 23 August 2026.
How many allotment cheques has Gaur Alaris received?
Gaur Alaris has received more than 1,200 allotment cheques as of 25 August 2026, per the Gaurs sales desk, across its 8 towers on Plot GH-13 in Sector 22D — allotment runs first-come-first-served, with no last date announced for Phase 1.

Most read on Eldeco EOE

Talk to the desk

Buying near the Jewar airport? Get the free buyer's brief.

Whether you're in India or an NRI abroad: the corridor's YEIDA rate history, the FEMA rules for NRIs/OCIs, and how to buy or build remotely — every figure sourced and dated, no projections. We'll send the 1-page brief and answer your questions.

+91 98114 05300

Mon–Sat 10–7 · Sunday, phone & WhatsApp only

Your number goes to the desk — not a call-centre.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Disclaimer: Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026) is an authorised channel partner, not the developer, for Eldeco Echoes of Eden (UPRERAPRJ125342/02/2026) and other projects referenced here. All prices are BSP on super area at the time of writing (marked *) and are subject to change. GST, PLC, IFMS, car parking, stamp duty and registration charges are additional. Verify every project's RERA status on the UP-RERA portal before purchase. This is not investment advice; past performance is not a guarantee and values can fall. NRI/OCI buyers should consult their own CA/FEMA advisor before remitting funds.