Gaur Alaris (Gaur Plume): Price, Floor Plans, Location & Review 2026

Gaur Alaris by Gaurs (Gaursons) at Sector 22D, Yamuna Expressway: what’s confirmed, current pricing (now RERA-registered), and an honest read of who it fits.

The short answer

Gaur Alaris (widely marketed as Gaur Plume) is now RERA-registered as Gaur Alaris: UPRERAPRJ950965/07/2026 (registered July 2026), a 3 BHK-only, Art Deco development by Gaurs at Sector 22D, Yamuna Expressway: about 11.8 acres, 8 named 34-storey towers (Eleganza, Evania, Gaudium, Elance, Azura, Orlena, Elara, Aurea), themed on a peacock motif with the clubhouse, named Club Regalia, ~1,00,000 sq.ft* across 5 levels. The BSP of record is ₹12,000/sq.ft* super area, as on 7 September 2026, other charges extra, Phase 1 bookings having closed on 1 September 2026 at ₹9,000/sq.ft* super area. The 3 BHK sizes are 1,550 and 1,950 sq.ft, and the worked total for either goes out on Gaurs’ dated cost sheet. Prices are the developer’s and subject to change. This is a review by Vidastu; for our deepest project coverage, see our channel-partner site gaursplume.com. Gaurs’ newest launch on this corridor is a different product at a different address: Gaurs Studio Bento, studio apartments at Sector 19, Gaur Yamuna City (EOI only, pre-RERA).

Sector 22D is still selling

Phase 1 at Gaur Alaris closed to new bookings on 1 September 2026. Here are two in the same sector that our desk can open today. Both sit on the UP-RERA register, and we will put a dated cost sheet for either one in writing.

Eldeco Echoes of Eden, Caelum tower. Registered as UPRERAPRJ125342/02/2026, with 11 January 2031 recorded on the register as the completion date. The basic sale price for Caelum is ₹11,000 per sq ft* on super area, plus other charges, as on 8 October 2026, with Haven and Elysian fully booked. Read the Echoes of Eden pages.

Eldeco Ballads of Bliss, owner resale. Registered as UPRERAPRJ921261/05/2025 and sold out since June 2025 per Eldeco's announcement, so resale is the route in. One 3 BHK of 1,550 sq.ft super area is open at ₹8,299/sq.ft* on super area plus other charges, with the full figure on the unit sheet. Read the Ballads unit.

Ask what is open in Sector 22D →

Gaur Alaris (Gaur Plume): the quick facts

11.8acres of land
8named towers
34storeys per tower
5Club Regalia levels

At a glance (RERA-registered)

DeveloperGaurs (Gaursons)
LocationSector 22D, Yamuna Expressway
Configurations3 BHK only (1,550 & 1,950 sq.ft)
Land / towers~11.8 acres · 8 named towers, 34 storeys each
ClubhouseClub Regalia, ~1,00,000 sq.ft* · 5 levels
BSP of record₹12,000/sq.ft* super area, as on 7 September 2026, other charges extra
Launch BSP (was)₹12,000/sq.ft*
Possession (Phase 1)09-06-2031
RERA statusRegistered: UPRERAPRJ950965/07/2026

Gaur Alaris (Gaur Plume) price

Gaur Alaris carries a BSP of record of ₹12,000/sq.ft* super area, as on 7 September 2026, other charges extra, Phase 1 bookings having closed on 1 September 2026 at ₹9,000/sq.ft* super area. The earlier declared launch rate was ₹12,000/sq.ft*. On the 1,550 sq.ft 3 BHK, that places an entry 3 BHK from the closing list, with the 1,950 sq.ft 3 BHK above it.

The project’s own campaign desks carry the deeper cuts: a buyer’s trust checklist for Gaur Alaris (register entry, promoter cheque names, written cost sheets), the Gaur Alaris location and commute math, and how the Gaur Alaris booking process actually runs: co-applicants, FCFS, paperwork. The brochure sections themselves are indexed on the Gaur Alaris brochure page.

Two honest caveats before you anchor on those numbers. First, these are indicative figures, subject to change: base selling price only; GST, preferred-location charges (PLC), car parking, IFMS and registration are extra. Second, the areas quoted are saleable/indicative, not RERA carpet; confirm the exact RERA carpet area for your unit before booking. For a current, configuration-specific quote, speak to Vidastu’s Vidit at +91 98114 05300.

Tracking Gaur Alaris after the 1 September booking close? The desk handles register-record updates. Ask the desk on WhatsApp

Are Gaur Alaris floor plans available?

Not as a public download; the developer’s team issues unit plans to registered enquirers, and we do not republish them. What the plan filed with UP-RERA does put on the record is the frame around those layouts: 3 BHK only, in two saleable sizes of 1,550 sq.ft and 1,950 sq.ft, across eight named towers of 34 storeys each, with four unit positions (A, B, C and D) on every floor plate.

Read that structure before you read any drawing, because it tells you what the real choice is. With two sizes and four positions repeating up thirty-four floors, you are not picking between many different homes; you are picking a position and a height. The position sets your facing and which way the balconies look; the height sets the view and, on most Gaurs price lists, the premium. A layout sheet on its own cannot answer either question, which is why, while bookings ran, our desk sent the plan and the price list together rather than one without the other. The full Gaur Alaris review sets out every head on the cost sheet, so you know what to ask for.

Two cautions worth carrying into that conversation. Areas quoted anywhere on this page are saleable, not RERA carpet; the carpet figure is the one that must appear in your agreement to sell, and it is verifiable against UPRERAPRJ950965/07/2026 on the register. And any layout you are shown should carry an issue date; at this stage of a project, drawings are still being finalised against the sanctioned plan, and an undated plan is worth about as much as an undated price.

The configurations, side by side

Gaur Alaris Phase 1 is planned as 3 BHK only homes across 8 named, 34-storey towers: Eleganza, Evania, Gaudium, Elance, Azura, Orlena, Elara and Aurea:

Entry configuration

3 BHK

1,550 sq.ft
  • Saleable area, per the plan filed with UP-RERA
  • Phase 1 fully booked on 1 September 2026
  • Confirm the exact RERA carpet area for your unit

3 BHK

1,950 sq.ft
  • Saleable area, per the plan filed with UP-RERA
  • Priced above the 1,550 sq.ft unit
  • Confirm the exact RERA carpet area for your unit

Detailed unit plans are shared by the developer with registered enquirers; layouts and areas should be confirmed against the official RERA filing (UPRERAPRJ950965/07/2026).

Club Regalia: the peacock clubhouse & amenities

The signature of Gaur Alaris is its theme: a peacock-inspired design language anchored by the clubhouse, named Club Regalia, approximately 1,00,000 sq.ft* across 5 levels (85,000 sq.ft built-up + 15,000 sq.ft terrace). For Sector 22D, a clubhouse at that scale is a genuine differentiator; the detailed amenity list is confirmed at launch.

“Now RERA-registered under UPRERAPRJ950965/07/2026; the long pre-launch phase is over, and Phase 1 bookings closed on 1 September 2026.”

Where is Gaur Alaris located? Sector 22D: location & connectivity

Gaur Alaris sits in Sector 22D on the Yamuna Expressway, one of the most active residential pockets of the YEIDA corridor and home to several recent launches. Its biggest tailwind is proximity to the now-operational Noida International Airport (Jewar): about 16 km away per the official deck, which is reshaping demand across these sectors. Sector 22D also puts you near the corridor’s planned social and commercial infrastructure as YEIDA develops.

Who Gaur Alaris (Gaur Plume) is for (and who it isn’t)

A fit if you want a theme-led 3 BHK in a fast-developing, now-registered sector project, and you value a large clubhouse and the Jewar-airport growth story. Less of a fit if you need possession soon (Phase 1 is scheduled 09-06-2031) or prefer a delivered, occupied community over a multi-year build.

Talk to the desk

Considering Gaur Plume? Get the real numbers.

Vidastu is an authorised channel partner. Vidit shares the current per-unit pricing, the indicative payment plan and an honest read of the sector, no pressure.

+91 98114 05300

Mon to Sat, 10 to 7 · Sunday, phone & WhatsApp only

Your number goes to the desk, not a call-centre.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Also from Vidastu on Sector 22D

Frequently asked questions

What is the price of Gaur Plume at Sector 22D?
Gaur Plume (now RERA-registered as Gaur Alaris, UPRERAPRJ950965/07/2026) closed Phase 1 bookings on 1 September 2026. The closing list stood at a BSP of ₹9,000/sq.ft* super area (revised 23 August 2026), other charges extra, and the BSP of record since 7 September 2026 is ₹12,000/sq.ft*; the 3 BHK plans are 1,550 and 1,950 sq.ft. Phase 1 fully booked on 1 September 2026. For resale availability or updates contact Vidastu’s Vidit at +91 98114 05300.
Where is Gaur Plume located?
Gaur Plume is at Sector 22D on the Yamuna Expressway, the same residential sector as several other new launches, close to the now-operational Noida International Airport (Jewar). Sector 22D is among the most active residential pockets of the YEIDA corridor.
What configurations does Gaur Plume offer?
Gaur Alaris (formerly Gaur Plume) Phase 1 is 3 BHK only, across 8 named, 34-storey towers (Eleganza, Evania, Gaudium, Elance, Azura, Orlena, Elara, Aurea) on ~11.8 acres; final sizes 1,550 sq.ft and 1,950 sq.ft, per the plan filed with UP-RERA (UPRERAPRJ950965/07/2026). It is Art Deco in style and themed around a peacock motif, anchored by the clubhouse, named Club Regalia, approximately 1,00,000 sq.ft* across 5 levels (85,000 sq.ft built-up + 15,000 sq.ft terrace).
Is Gaur Plume RERA registered?
Gaur Plume is now RERA-registered as Gaur Alaris, UPRERAPRJ950965/07/2026 (registered July 2026); verify at up-rera.in. This is separate from UPRERAPRJ622344/11/2025, the earlier Gaur Chrysalis Phase 1. Vidastu is an authorised channel partner (UP-RERA Agent UPRERAAGT000309/01/2026), not the official developer website.

Disclaimer: This is a review by Vidastu (Vidastu Advisory, UP-RERA Agent UPRERAAGT000309/01/2026), an authorised channel partner, not the official developer website. “Gaur Alaris” / “Gaur Plume” was the working/marketing name; the project is now RERA-registered as Gaur Alaris, UPRERAPRJ950965/07/2026 (registered July 2026), not to be confused with UPRERAPRJ622344/11/2025, the separate, earlier Gaur Chrysalis Phase 1. All figures remain indicative and subject to change. All renders are artist’s impressions / representational only (per developer). Areas are saleable/indicative, not RERA carpet; confirm the exact carpet area for your unit. Verify all figures and the RERA registration directly at up-rera.in before any booking. Read the full Gaur Alaris project page.