Specifications & amenities, room by room

Every flooring, fixture, fitting and clubhouse feature at Eldeco Echoes of Eden — in one place, with the honest gaps included.

The short answer

A complete, room-by-room reference of Eldeco Echoes of Eden specifications — flooring, kitchen, bathroom, VRV AC, electrical, doors, windows — plus the full clubhouse and amenity list. Bookmark this page; it's the one you'll come back to when comparing projects.

A brochure tells you a project has “premium specifications.” A serious buyer wants to know: which marble grade in the living room, which sanitaryware brand in the bathroom, and whether the AC works when it’s 46°C outside. This post is the answer to all of those questions in one reference page.

Project snapshot

ProjectEldeco Echoes of Eden
LocationSector 22D, Yamuna Expressway
RERAUPRERAPRJ125342/02/2026
Configuration3 BHK + Duplex Penthouses
Super area1,550 / 1,850 sq.ft (3 BHK)
StructuralRCC, earthquake-resistant
ACVRV — all units
Open area~80% podium green

The headline spec — VRV air conditioning

The single most important specification at Eldeco EOE is the VRV (Variable Refrigerant Volume) air-conditioning pre-installed across all units. Most NCR projects in the ₹1.2–1.8 Cr band give you split-AC points and leave the install to you. VRV is a different category entirely.

Why VRV matters

“No hanging AC cages on the facade — the balcony stays a balcony, not a condenser shelf.”

We cover this in more depth in our VRV AC Apartments Guide if you want the technical deep-dive.

Flooring specifications

AreaFinishComment
Living / diningImported marble or premium vitrified (large format)Non-slip rated
BedroomsWooden laminate or engineered woodWarm-toned, AC-compatible
KitchenAnti-skid vitrified or porcelainStain-resistant
BathroomsAnti-skid ceramic with designer dadoFull-height tiling on wet walls
BalconiesWeatherproof vitrifiedOutdoor-grade
Lobby & common areasGranite / imported stoneHigh-traffic grade

Kitchen specifications

Bathroom specifications

Doors & windows

Electrical & networking

Structural system

Security specifications

The full amenities list

Clubhouse & wellness

Central Clubhouse
Swimming Pool
Kids’ Splash Pool
Gymnasium
Yoga & Meditation
Spa & Sauna
Steam Room
Jacuzzi
Aerobics Studio
Salon Provision

Sports & outdoor

Tennis Court
Basketball Court
Badminton Court
Jogging Track
Cycling Track
Cricket Pitch (net)
Skating Rink
Outdoor Gym

Indoor & leisure

Billiards & Snooker
Table Tennis
Card Room
Chess Corner
Library
Mini Theatre
Music Room
Co-working Zone

Family, seniors & kids

Kids’ Play Zone
Toddler Area
Creche Provision
Senior Citizens’ Corner
Reading Pavilion
Amphitheatre
Party Lawn
Banquet Hall

Landscape & sustainability

Central Podium Greens
Themed Gardens
Pet-friendly Zones
Rainwater Harvesting
STP (on-site)
Organic Waste Converter
EV Charging
Solar Common Area

Convenience & safety

24×7 Security
CCTV Surveillance
100% Power Backup
Concierge Desk
Convenience Store
ATM Space
Guest Parking
Ambulance On-call

What you don’t get — be honest about it

Every premium project has edges

  • Full modular kitchen cabinetry is not typically included beyond the base. Most buyers customise this with a vendor after possession.
  • Wardrobes are usually provisioned, not fully fitted — again typically a post-possession upgrade.
  • Curtains and soft furnishings are not part of the handover.
  • White goods (fridge, washing machine, dishwasher) are not included unless specified under a furniture offer.

Budget ₹5–10 lakh for post-possession interiors on a typical 1,550 sq.ft 3 BHK. It’s worth it — the base spec is already premium enough that your interior investment goes into what’s visible, not what’s structural.

Talk to the desk

Get the full spec sheet & amenity map

We’ll share the official RERA-aligned spec sheet and annotated amenity map for your preferred tower — no spam, no pressure.

+91 98114 05300

Mon–Sat 10–7 · Sunday, phone & WhatsApp only

Your number goes to the desk — not a call-centre.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Related reading

Frequently asked questions

Is VRV air-conditioning really included in every Eldeco EOE unit?
Yes. VRV (Variable Refrigerant Volume) air-conditioning is included as a standard specification across all units at Eldeco Echoes of Eden. This is one of the defining premium specifications of the project and is not an optional upgrade.
What is the flooring specification at Eldeco EOE?
Living and dining areas typically get premium imported/Italian marble or equivalent finish, bedrooms get wooden laminate flooring, balconies get vitrified tile, and bathrooms get anti-skid ceramic. Exact brand and grade is specified in the allotment cost sheet.
Does Eldeco EOE have a clubhouse?
Yes. Eldeco Echoes of Eden has a dedicated central clubhouse with swimming pool, gymnasium, indoor games, banquet space, and wellness facilities. The full amenity list is detailed above.
What is the structural system used at Eldeco EOE?
Eldeco Echoes of Eden uses an RCC earthquake-resistant structural design. Construction is typically aluform/MIVAN-based for high-rise consistency and faster delivery timelines.

Disclaimer: Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026) is an authorized channel partner for Eldeco Echoes of Eden (UPRERAPRJ125342/02/2026). Specifications and amenities are indicative and subject to the final allotment cost sheet and builder-buyer agreement. Exact brand, grade, and amenity scope may vary by tower. Verify all details on the UP-RERA portal before purchase. This is not financial or investment advice.