YEIDA Plot Schemes on the UP-RERA Register: 16 Registrations Where the Promoter Is the Authority

The answer, before the detail

Sixteen UP-RERA registrations in our Gautam Buddha Nagar mirror name the Yamuna Expressway Industrial Development Authority itself as the promoter, filed under applicant type Competent authority, read 29 July 2026. Eleven of the sixteen carry a residential-plot-scheme code or explicit plot wording in the registered name; five are group-housing, commercial or affordable-housing filings by the same authority. All sixteen are printed below with five register fields each: the name exactly as the register spells it, the registration number, the registration date, the completion date the authority itself declared, and the number of rows on the filing’s document tab. The field that defeats most people is the first one. Across the ten RPS and RRPS filings the register joins the prefix to the scheme number four different ways - a hyphen in RPS-04/2021, a space in RPS 05/2021, nothing at all in RPS07/2023, and a space then a hyphen in RRPS -04/2020 - and an eleventh plot filing carries no scheme code at all. Search these by registration number, not by scheme name. This page publishes no rate, no plot count and no application figure, because none of that is register data; our sourced figure work on RPS-10 is at RPS-10 by the numbers.

16Registrations naming YEIDA itself as promoter · applicant type Competent authority · read 29 July 2026
11 of 16Rows whose registered name carries a plot-scheme code or explicit plot wording
4Ways the register joins RPS to the scheme number across these filings

Why sixteen Yamuna Expressway registrations name an authority instead of a developer

Almost everything written about the Yamuna Expressway corridor is written about developers. This page is not, and that is the whole point of it.

When a development authority allots residential plots, builds a group-housing block or puts up a shopping complex on its own land, it is the promoter of that project under the Real Estate (Regulation and Development) Act. It registers with UP-RERA like anyone else. The register records this by putting the authority’s own name in the promoter field and setting the applicant type to Competent authority rather than Company. That single field is what separates these sixteen filings from the hundreds of private ones in the same district.

The practical consequence is that a YEIDA plot scheme has a UP-RERA registration number, a registration date, a declared completion date and a document tab, exactly like an apartment project does. Almost nobody reads them, partly because they are genuinely hard to find, for reasons this page spends most of its length on.

One thing to be clear about before the table. We are not YEIDA and we do not act for YEIDA. We hold no scheme brochure, no applicant list, no draw result and no allotment letter, and we will not pretend otherwise; those live with the authority and are published on its own site. What we hold is a mirror of the UP-RERA register, and what this page publishes is what that mirror says about these sixteen filings.

The sixteen registrations, as the register holds them

Five fields per row, all of them copied rather than derived, in registration-date order. Each name links to that filing’s record page on our register tracker, which carries the fuller set of fields we hold for it.

Scroll the table sideways to see every column

The 16 UP-RERA registrations whose promoter field holds the Yamuna Expressway Industrial Development Authority and whose applicant type is Competent authority, in registration-date order, read from Vidastu’s mirror of the register on 29 July 2026. Names are printed exactly as the register spells them, punctuation and all. Declared completion is the date the promoter itself declared at filing; it is not a guaranteed handover date.
# Scheme or project name (as registered) UP-RERA registration number Registration date Declared completion (as filed) Document rows
1Affordable Housing Sector-22D YEIDAUPRERAPRJ864709-08-201728-12-201918
2RPS-02, SEC-22DUPRERAPRJ875609-08-201710-09-201915
3Footprints for Commercial Use, Sec-22AUPRERAPRJ881310-08-201709-07-201916
4GH06, Sec-22D, YEIDAUPRERAPRJ894710-08-201730-12-201916
5INDIVIDUAL RESIDENTIAL PLOTS, SEC-17,YEIDAUPRERAPRJ931811-08-201730-09-202021
6GH-06, SEC-22A, YEIDA, PHASE 1 (YAMUNOTRI)UPRERAPRJ938411-08-201731-03-202123
7Convenient Shopping Complex, Sector 22DUPRERAPRJ1533828-02-201830-06-201819
8RPS01,RRPS01 AND RRPS02 (SECTOR 18 AND 20) ,YEIDAUPRERAPRJ28207815-10-201909-01-202422
9RRPS -04/2020UPRERAPRJ20588318-08-202031-12-202527
10RPS-04/2021UPRERAPRJ55200326-02-202131-05-202618
11RPS 05/2021UPRERAPRJ14661022-12-202131-05-202717
12RPS-06/2022UPRERAPRJ98583502-09-202231-12-202719
13RPS07/2023UPRERAPRJ56374007-08-202330-11-202822
14RPS08/2024UPRERAPRJ653132/10/202428-10-202430-06-202937
15RPS09/2025UPRERAPRJ103634/04/202511-04-202530-06-203030
16RPS10/2025UPRERAPRJ307764/03/202614-03-202630-09-203035

Free to reuse with attribution to www.vidastu.com. Every cell is copied from the register; nothing on this table is calculated. It carries no rate, no plot count, no application figure, no deposit, no revised date, no extension history, no complaint count, no score and no rank, and it is not sorted by desirability. Some declared completion dates here fall before the date this register was read: a declared completion date is a record of what was declared at filing and is not a status field, so this page draws no conclusion from it. Re-check any row on the live filing at up-rera.in before relying on it.

The scheme name on the register is not the scheme name in the brochure

Here is the finding that makes this page worth bookmarking. Ten of these sixteen rows carry an RPS or RRPS scheme code in the registered name, and the register writes that code four different ways.

Row 8 is its own category. Its registered name is RPS01,RRPS01 AND RRPS02 (SECTOR 18 AND 20) ,YEIDA: three scheme codes joined by commas and the word AND, with a stray space before the final comma, all inside a single registration. If you are looking for RRPS02 as a standalone filing in this set, you will not find it as its own row, because on the register it lives inside that one.

And row 5, INDIVIDUAL RESIDENTIAL PLOTS, SEC-17,YEIDA, is a residential-plot filing that carries no scheme code whatsoever. A search built around the letters RPS misses it completely. That is the eleventh plot-named row, and it is the clearest illustration of why a code-based search is the wrong tool here.

What this means when you sit down to check something. Do not type the scheme name. Take the registration number out of the table above, type that into the register’s project search, and read the filing it returns. The registration number is the only field on these rows that is stable enough to match on, which is the same conclusion our UP-RERA registration number decoder reaches from the other direction.

One more string worth knowing, because it will cost you a search otherwise. The promoter cell on all sixteen rows holds a single identical string, and it reads YAMUNA EXPRESSWAY INDUSTRIAL DEVLOPMENT AUTHORITY - with DEVLOPMENT spelled that way in the field we hold, copied from the register as read on 29 July 2026. We print it verbatim rather than tidying it, because a promoter-name search that uses the correctly spelled word may not match these rows. This is a note about a text field and nothing else.

What the register calls RPS-10, and why the year in a scheme label is not the year it registered

The scheme that drew the largest public interest on this corridor in 2026 is registered under the name RPS10/2025, on registration number UPRERAPRJ307764/03/2026, registered 14 March 2026. Coverage of that scheme, ours included, calls it RPS-10/2026. Both are correct about different things, and the difference is worth understanding rather than smoothing over.

A scheme label is the authority’s own naming of its scheme. A registration date is when UP-RERA registered the filing. On seven of the eight RPS and RRPS filings on this page that carry a year in the name, the label year and the registration year agree: RRPS -04/2020 registered in 2020, RPS-04/2021 and RPS 05/2021 in 2021, RPS-06/2022 in 2022, RPS07/2023 in 2023, RPS08/2024 in 2024, RPS09/2025 in 2025. RPS10/2025 is the row where they part company, registering in March 2026 under a 2025 label.

The registration number itself settles the argument. The suffix /03/2026 encodes March 2026, which matches the registration date exactly, and that suffix convention is the one our decoder page found holding across every slashed number in the mirror. So when a listing, a forum post or an assistant tells you the RPS-10 registration is a 2025 filing, the number on the filing says otherwise.

There is a second reason to keep this row in view. Its register address field, one of only three populated across these sixteen, reads POCKET- 9A, SECTOR-18, BLOCK A & B, SECTOR-15C, SECTOR-24A-YEIDA, GAUTAM BUDH NAGAR. That is the authority’s own filing naming Sectors 18, 15C and 24A - the same three sectors the scheme coverage reports. Two independent record types agreeing is worth more than either alone, and it is the kind of cross-check we would rather publish than a confident sentence. The other two populated address cells are PLOT-1B on RPS08/2024 and POCKET-9B on RPS09/2025. The remaining thirteen are empty, which is why this page carries no sector column: inventing one would be a guess.

What this page will not restate. The allotment rate, the plot modules, the application volume, the deposit arithmetic and the refund window for RPS-10 are not on this page and will not be added to it. All of that is on RPS-10 by the numbers, where every figure carries a named source, an as-of date and a confidence tag. If you arrived here for a rupee figure, that is the page you want. If you did not win a plot in that draw, what to do next is a separate read.

Which of the sixteen are plot schemes, and which are something else

The register carries no scheme-type field. There is no cell that says “residential plot scheme” or “group housing”, so any grouping here is a reading of the registered name string, not a register fact, and we are labelling it as ours. The test is mechanical: does the registered name contain an RPS or RRPS code, or the word PLOTS? Eleven rows do. Five do not.

Our reading of the 16 registered names, not a register classification. Grouped by whether the name carries a plot-scheme code or the word PLOTS, as read 29 July 2026.
Grouping (our reading of the name) Rows Registered names
Carries an RPS or RRPS code, or the word PLOTS11RPS-02, SEC-22D · INDIVIDUAL RESIDENTIAL PLOTS, SEC-17,YEIDA · RPS01,RRPS01 AND RRPS02 (SECTOR 18 AND 20) ,YEIDA · RRPS -04/2020 · RPS-04/2021 · RPS 05/2021 · RPS-06/2022 · RPS07/2023 · RPS08/2024 · RPS09/2025 · RPS10/2025
Carries neither5Affordable Housing Sector-22D YEIDA · Footprints for Commercial Use, Sec-22A · GH06, Sec-22D, YEIDA · GH-06, SEC-22A, YEIDA, PHASE 1 (YAMUNOTRI) · Convenient Shopping Complex, Sector 22D

The five in the second group tell you something the first group does not: the same authority has registered group-housing blocks (GH06 and GH-06, both in Sector 22 pockets), a commercial footprint filing in Sector 22A, an affordable-housing filing in Sector 22D and a shopping complex in Sector 22D. If your mental model of YEIDA is “the body that draws plots”, the register says the picture is wider than that.

A caution on scheme numbers, because absence is easy to over-read. Among these sixteen rows the RPS and RRPS codes that appear are 01, 02, 04, 05, 06, 07, 08, 09 and 10, with 04 appearing under both prefixes as two separate filings: RRPS -04/2020 and RPS-04/2021 carry separate registration numbers. Codes 01 and 02 also appear under both prefixes, but with the RRPS forms sitting inside row 8 rather than on rows of their own. No row in this set carries an RPS-03 code. That is a statement about these sixteen rows on 29 July 2026 and nothing more; it is not a claim that no such scheme exists, and you should not treat it as one.

What the document count on each filing does and does not tell you

The last column of the main table is the number of rows listed on that filing’s document tab in our mirror. It is a count of listed rows. We did not download the files, we did not open them, and we are not in a position to tell you what any of them contain.

Each of those rows carries a status label set by the portal itself. Our mirror holds three such labels across this set: New, Old and NA. We print the split below because a bare total hides it, and because a reader who wants to interrogate this data deserves to see the shape of it rather than a single number.

Scroll the table sideways to see every column

Document-tab rows per filing, split by the status label the portal carries on each row, read 29 July 2026. A count of listed rows, not of documents we have read, and not a completeness, quality or ranking score.
Registered name Rows listed Labelled New Labelled Old Labelled NA
Affordable Housing Sector-22D YEIDA181125
RPS-02, SEC-22D15609
Footprints for Commercial Use, Sec-22A16709
GH06, Sec-22D, YEIDA16808
INDIVIDUAL RESIDENTIAL PLOTS, SEC-17,YEIDA216510
GH-06, SEC-22A, YEIDA, PHASE 1 (YAMUNOTRI)23779
Convenient Shopping Complex, Sector 22D19829
RPS01,RRPS01 AND RRPS02 (SECTOR 18 AND 20) ,YEIDA2212010
RRPS -04/20202716011
RPS-04/2021181404
RPS 05/2021171502
RPS-06/2022191405
RPS07/2023221804
RPS08/2024372908
RPS09/2025302802
RPS10/2025353500

The NA label is the portal’s, not ours, and we are not going to tell you what it means, because we do not know and guessing would be worse than saying so. It is not safe to read it as “missing”. What is fair to observe is structural: the three most recent filings list the most rows, and RPS10/2025 lists 35 rows with every one of them labelled New. Newer filings sit inside a newer version of the portal’s document structure, which is a fact about the portal rather than about any scheme.

What a document tab is useful for is the thing a count can never do for you: opening it. The entries worth your own eyes are the proforma of the allotment letter, the proforma of the agreement for sale, the development work plan and the encumbrance details, because those are the papers whose wording governs what you sign. A number in a column here is a pointer to them, not a substitute.

Five things to read on an authority filing before you apply

This is the decision framework, and every step in it is grounded in a field that appears on this page.

  1. Match by number, never by name. Take the registration number for the scheme you are being shown from the table above and confirm it against the document you were handed. If it is not in this table, that is not a problem with the document; it may be a filing outside our scope, and the register itself is the place to settle it.
  2. Confirm the promoter really is the authority. On the live filing, check that the promoter field holds the authority’s string and that the applicant type reads Competent authority. A scheme run by the authority and a private project standing on YEIDA land are different transactions with different counterparties, and the applicant-type field is the fastest way to tell them apart.
  3. Read the declared completion date for what it is. It is the date the promoter declared at filing. It is not a handover guarantee, it is not a promise made to you, and it is not something to subtract today’s date from. The date that binds anyone is the one written into your own allotment letter or agreement for sale. Read that document, and read it before you pay.
  4. Open the document tab rather than counting it. Go to the proforma of the allotment letter and the proforma of the agreement for sale first. Those two tell you what you are actually agreeing to, in the authority’s own drafting, before any brochure gets a say.
  5. Take every rupee figure from the authority, not from a register row and not from us. Rate, module size, deposit percentage, application fee, refund window and draw mechanics are scheme-brochure facts published by YEIDA. Our sourced reading of the RPS-10 figures is at RPS-10 by the numbers, with a confidence tag on every one, and even that page tells you to confirm against the brochure.

How to verify every row on this page yourself

  1. Open up-rera.in. Use the site root; deep links into the portal’s project paths do not reliably resolve, so a bookmarked inner URL is more likely to fail than to help.
  2. Go to the registered-projects search and search by registration number, pasting it exactly as printed in the table, slashes included. For pre-2024 filings there is no slashed suffix, so UPRERAPRJ8756 is the whole number.
  3. If you would rather search by promoter, paste the promoter string verbatim from the section above, including its spelling. Searching the district of Gautam Buddha Nagar and reading down the promoter column also works, and is slower but harder to get wrong.
  4. On the filing that opens, read the promoter name, the applicant type, the registration date, the declared completion date and the document tab, and compare them against the row here.
  5. If a cell on this page disagrees with the live filing, the live filing is right and we are out of date. Tell us and we will correct the page and say that we did.

What this page counts, what it leaves out, and the date the register was read

The scope sentence, in full. This page covers the 16 registrations in Vidastu’s Gautam Buddha Nagar mirror of the UP-RERA register whose promoter field holds the Yamuna Expressway Industrial Development Authority and whose applicant type is Competent authority, read 29 July 2026. It is not a list of every YEIDA scheme that has ever run, and a scheme’s absence from it is a statement about our mirror on that date, not about the authority’s records.

The filter, stated so you can rerun it. Two conditions, both exact-match on register fields: promoter name equals the register’s own string for the authority, and applicant type equals Competent authority. No date window, no address test, no keyword search on the name. Our mirror holds 966 registrations for Gautam Buddha Nagar spanning registration years 2017 to 2026; those two conditions return 16 of them.

What was excluded, and why. Three exclusions, each deliberate. First, the mirror holds 27 registrations of applicant type Competent authority in total, of which 16 are YEIDA’s; the other 11 were filed by the Greater Noida Industrial Development Authority and the New Okhla Industrial Development Authority. They are excluded because they are other authorities’ filings in other jurisdictions, not because of anything about them. Second, a promoter-name search on the word Yamuna also returns a registration whose promoter is YAMUNA BUILTECH PRIVATE LIMITED, a company. It is excluded because its applicant type is Company, not Competent authority: a similar name is not the same counterparty, and this is exactly the trap the applicant-type field exists to catch. Third, every project registered by a private developer on YEIDA land is excluded, because on those filings the promoter is that company and the counterparty in your transaction is that company. Our register work on the named private projects along this corridor is a separate page, Yamuna Expressway RERA numbers.

The fields this page publishes, and the ones it does not. Five fields per row and no others. We publish no promoter phone number or email address. We publish no revised completion date, no extension record and no complaint count for any row, and we run no arithmetic between two register fields, because the moment a page does that it is publishing its own opinion dressed as a register fact. We publish no sector column, because the register’s address field is empty on 13 of these 16 rows and a parsed sector would be a guess on most of them. We publish no rate, plot count, module size, deposit or application figure, because none of those are register data and because our figure work already lives on its own page, which we would rather you cite than a weaker restatement here.

What a declared completion date is, once more, because it matters. It is the completion date the promoter itself declared when it filed. It records what was declared, on the day it was declared. It is not a guaranteed handover date and not a commitment made to you. The binding date is the one in your own agreement for sale or allotment letter, and the only place to read that is the document itself.

What we sell, stated plainly. Vidastu Advisory is a UP-RERA-registered agent, not a developer and not an authority. We hold no agency, appointment or arrangement of any kind with YEIDA, and we represent none of the 16 registrations on this page, because on every one of them the promoter is a government body. What we sell on this corridor is advisory and construction, and if you have read this page and want a second pair of eyes on a filing, the desk is below. Nothing here is an offer, an invitation to apply, a solicitation, investment advice, or tax or legal advice, and no return, appreciation, rental yield or tax outcome is stated or implied.

For neighbouring register work, our corridor pages are the corridor live index, the YEIDA sector guide for 22D, 22A, 18 and 20, and the corridor price history.

Frequently asked questions

How many YEIDA registrations does this page count, and how were they picked?
It counts the 16 registrations in our Gautam Buddha Nagar mirror of the UP-RERA register whose promoter field holds the authority's own string and whose applicant type is Competent authority, read 29 July 2026. The filter is mechanical and can be rerun: promoter name equals YAMUNA EXPRESSWAY INDUSTRIAL DEVLOPMENT AUTHORITY, applicant type equals Competent authority. Registrations filed by private companies on YEIDA land are excluded, because on those the promoter is the company, not the authority.
Why does the register call the 2026 draw scheme RPS10/2025 when everyone else calls it RPS-10/2026?
Because a scheme label and a registration date are two different things. The registered name on UPRERAPRJ307764/03/2026 is the string RPS10/2025, and the registration date on that filing is 14 March 2026. The scheme label is the authority's own naming of the scheme; the registration date is when UP-RERA registered it. On seven of the eight RPS and RRPS filings that carry a year in the name, the label year and the registration year match. This one is the row where they do not, which is exactly why you should look these filings up by registration number rather than by scheme label.
Why does searching the register for a YEIDA scheme name usually return nothing?
Because the string on the register is not the string in the brochure or the news report. Across the ten RPS and RRPS filings on this page the register joins the prefix to the scheme number four different ways: with a hyphen in RPS-04/2021, with a space in RPS 05/2021, with nothing in RPS07/2023, and with a space then a hyphen in RRPS -04/2020. An eleventh plot filing, INDIVIDUAL RESIDENTIAL PLOTS, SEC-17,YEIDA, carries no scheme code at all. The registration number is the only field on these rows you can type and expect to match.
What does the document count in the table actually mean?
It is the number of rows listed on that filing's document tab in our mirror, read 29 July 2026, and nothing more. We did not download or read the files themselves. Each row carries a status label set by the portal, and we print the split by that label in a second table. A higher count is not a completeness score, a quality score or a ranking, and it should not be read as one. Open the document tab on the live filing and read the documents that matter to you.
What does a declared completion date on one of these filings mean?
It is the completion date the promoter itself declared when it filed the registration. It is a record of what was declared, on the date it was declared. It is not a guaranteed handover date, not a commitment made to you, and not a number to subtract today's date from. The date that binds anyone is the one in your own agreement for sale or allotment. This page prints the declared field and stops there, which is why it carries no revised dates, no extension history and no timeline arithmetic anywhere.
YEIDA plot scheme ka RERA number kaise check karein?
Sabse pehle scheme ka naam bhool jaaiye, kyunki register par naam ki spelling alag hai. Upar wali table se us scheme ka registration number uthaiye, jaise RPS10/2025 ke liye UPRERAPRJ307764/03/2026. Phir up-rera.in kholiye, registered projects search mein wahi number daaliye, aur live filing khud padhiye. Rate, plot size, deposit aur draw ki jaankari YEIDA ki apni scheme brochure se lijiye, register row se nahi.
Does this page tell me the plot rate, plot sizes or how many people applied?
No, and deliberately so. None of that is register data, so none of it is on this page. Our figure work on the RPS-10 scheme, with a source, an as-of date and a confidence tag on every number, is at /insights/rps-10-by-the-numbers.html, and the authority's own scheme brochures are at yamunaexpresswayauthority.com. This page's job is the register layer: which filings exist, what they are called on the register, and which number to type to find them.
Does this page list every YEIDA scheme that has ever existed?
It does not, and it is not meant to. It lists the 16 rows our Gautam Buddha Nagar mirror held on 29 July 2026 under that promoter and applicant type. A scheme's absence from this page is a statement about our mirror on that date, not about the authority's records. If you are looking for a scheme you do not see here, search the register directly at up-rera.in and check the authority's own site.
Sources and method
  1. UP-RERA · the authority’s own portal, and the source of every field on this page. Site root only: deep links into the portal’s project paths do not reliably resolve.
  2. Yamuna Expressway Industrial Development Authority · the promoter on all 16 rows, and the only place to read its own scheme brochures, draw results and allotment documents. We hold none of those.
  3. Vidastu’s mirror of the UP-RERA register for Gautam Buddha Nagar · 966 registrations, registration years 2017 to 2026. Register read date 29 July 2026, taken from the mirror’s own scrape log rather than any banner date on the portal.
  4. Filter, stated so it can be rerun: promoter name equals YAMUNA EXPRESSWAY INDUSTRIAL DEVLOPMENT AUTHORITY and applicant type equals Competent authority. Returns 16 rows. Applicant type Competent authority alone returns 27 across the district.
  5. Name grouping, stated so it can be rerun: registered name contains RPS, RRPS or the word PLOTS. Returns 11 of the 16. This is our reading of a name string, not a register classification, because the register carries no scheme-type field.
  6. Document counts: rows listed on each filing’s document tab in our mirror, split by the status label the portal carries on each row. Files were not downloaded or read.
  7. upreratracker.com · our register record pages, linked from each registered name above.
  8. Vidastu · RPS-10 by the numbers, where the rate, module and application figures live with sources, as-of dates and confidence tags.
  9. Vidastu · how to read a UP-RERA registration number, including the slashed month-and-year suffix.
  10. Vidastu · UP-RERA numbers for the named private projects on the same corridor.
Vidit Kaushik, Director, Vidastu Developers Pvt. Ltd.

Vidit Kaushik

Civil Engineering, BITS Pilani · UP-RERA Agent UPRERAAGT000309/01/2026 · Director, Vidastu Developers Pvt. Ltd.

Pulled one of these filings and want a second pair of eyes?

If you have opened one of these 16 registrations and something on it does not line up with what you were shown, send us the registration number and we will read the live filing with you. One number, one WhatsApp, no form. We hold no YEIDA brochure or allotment document and will tell you so rather than send you a substitute.