Vastu Unit Check: a preliminary alignment read for your shortlisted unit

Pick your entrance facing, kitchen corner and master-bedroom corner; get an instant preliminary Vastu alignment read: what aligns, what conflicts, and the classical use-based correctives for each.

In one paragraph

This tool checks three placements (your main entrance's facing direction, your kitchen's corner, and your master bedroom's corner) against classical Vastu Shastra's eight-direction (Vastu Purusha Mandala) principles, and shows instantly what aligns, what conflicts, and the standard use-based correctives for each conflict: adjustments to how a space is used, not things to buy. It is an alignment read, not a verdict: the classical system was built around a full floor plate, not three compass points, so beam positions, staircase placement and how rooms interact with each other sit outside what three inputs can tell you. The real product is what happens next: Vidit walks your exact shortlisted unit with the floor plan on the site visit and gives the complete orientation analysis, free.

Why this exists: on the founder's own account of his last closing, two days of questions were followed by a site visit, and it was the on-the-spot Vastu read of the actual unit, done alongside our co-founder Ravi Shankar Sharma's Vastu consultation background, that sealed it (founder-described). This tool is the preliminary version of that same read, so you can walk in already knowing what to ask.

Interactive · runs in your browser · nothing is sent anywhere until you choose to WhatsApp it

Check your unit's alignment

Pick the main entrance's facing direction, the kitchen's corner and the master bedroom's corner; the read below updates instantly. If you're not sure of the exact corner, use your best estimate; the full read on your site visit will settle it against the actual floor plan.

Which way the main door itself opens, not just which way the building block faces.

The corner of the unit the kitchen occupies.

The corner of the unit the master bedroom occupies.

Preliminary read only: not a Vastu certificate, not a structural or legal opinion, and not a guarantee of any outcome. Classical Vastu Shastra offers use-based correctives for a conflicting placement; it does not require breaking or rebuilding a unit. A full read needs the actual floor plate; that's what the site visit is for.

Same tool, different tower: why unit-level analysis matters

The three inputs above are the starting point, not the finish line. Two units in the same project can read completely differently: a corner unit and a mid-stack unit in the same tower often face different directions, and the kitchen or master bedroom can sit in a different corner floor to floor depending on how the builder mirrored the layout. That's exactly why a compass-direction tool stops at "preliminary", and why the founder's own closing pattern is to walk the specific shortlisted unit with the floor plan in hand, not to quote a generic rule for the project.

Where this applies: projects we work

Eldeco Echoes of Eden RERA-registered

Sector 22D, Yamuna Expressway. RERA UPRERAPRJ125342/02/2026, possession filed for January 2031 (RERA-verified). The 2 BHK is sold out project-wide; the entry 3 BHK+2T runs about 1,550 sq.ft on the dated cost sheet (founder-stated). RERA-registered, so booking is live; book a site visit and get the floor-plan orientation read at the same time.

Eldeco La Vida Bella RERA-registered

Sector 12, Greater Noida West. RERA UPRERAPRJ136219/04/2024, declared completion 16 January 2029 (RERA-verified). Five towers (Bellissimo 1 to 3, Magnifico 1 to 2) each G+22, so entrance and corner orientation for a given unit type varies tower to tower even within this one project.

ACE Arte RERA-registered

Sector 150, Noida, a distinct part of Noida from the Yamuna Expressway corridor. Formerly ACE Parkway 2.0, now RERA-registered as ACE Arte, UPRERAPRJ528653/07/2026 (registered July 2026), possession disclosed 15 February 2031. Booking is open through the developer's official process; a refundable Expression of Interest may still be offered as one route. Enquire for an orientation read on your shortlisted stack once plans are released.

Gaur Alaris (then Gaur Alaris) RERA-registered

Sector 22D, Yamuna Expressway. Now RERA-registered as Gaur Alaris, UPRERAPRJ950965/07/2026 (registered July 2026), possession disclosed 09-06-2031 for Phase 1. Phase 1 bookings closed on 1 September 2026. You can still book a site visit to walk the show-unit orientation with Vidit; pricing otherwise stays behind enquiry.

Gaurs Studio Bento pre-launch

Gaur Yamuna City, Sector 19, Yamuna Expressway. Pre-launch: no Bento-specific RERA registration verified by our desk yet. Furnished studios run roughly 650 to 675 sq.ft, indicative around ₹80 lakh (founder-stated); EOI is refundable and held outside escrow. Book a site visit to see how orientation plays out stack to stack; pricing otherwise stays behind enquiry until registration is confirmed.

Frequently asked questions

Which facing flat is best as per Vastu?
In classical Vastu Shastra, the main entrance is treated as the single most important placement, and North, Northeast (Ishan) and East are the three traditionally favored directions for a main door, associated respectively with Kubera (wealth), spiritual clarity, and the rising sun. 'Facing' usually means which direction the main entrance actually opens toward, not just which way the building block sits, so two units in the same tower can have different effective entrance directions depending on the corridor and door position. A south, southwest, west or northwest entrance is not automatically unlivable; classical Vastu has specific, use-based correctives for each. The tool above shows the correctives for your exact selection; a full read needs the actual floor plate.
Is a south-facing flat bad according to Vastu?
Not automatically, and not in the fear-driven way it is often marketed. South is one of the less-favored entrance directions in the classical eight-direction system (north, northeast and east are traditionally preferred) but a south-facing unit is common in real developments and has established, use-based correctives: keeping the entrance well-lit, keeping the foyer a pass-through rather than a lingering seating zone, and avoiding a direct sightline from the door into the bedroom. Orientation is one input into a livable home, not a verdict on it. The alignment-read tool above shows the specific correctives for a south entrance.
How do I do a Vastu check before buying a flat?
Three placements cover most of it as a starting point: the main entrance's facing direction, the kitchen's corner (southeast or northwest are classically favored), and the master bedroom's corner (southwest, or Nairritya, is the most consistently cited placement). You can run a preliminary alignment read on the tool above from just those three inputs, instantly and free. But a compass direction alone is not the full picture: beam positions, staircase placement and how rooms interact with each other all matter, which is why the honest next step is a walk of the specific shortlisted unit with the actual floor plan in hand. Vidit does this free during the site visit.
Is free Vastu analysis available in Noida and on the Yamuna Expressway?
Yes. For any unit shortlisted across the projects we work (Eldeco Echoes of Eden, Eldeco La Vida Bella, ACE Parkway 2.0, Gaur Alaris by Gaurs, and Gaurs Studio Bento) Vidit walks the exact unit with the floor plan on the site visit and gives a full orientation read, at no charge and with no obligation to book. The tool above gives a preliminary alignment read in under a minute from three inputs, useful for shortlisting, not a substitute for the floor-plate walk. WhatsApp +91 98114 05300 to set up a site visit.
What's the difference between this preliminary read and a full Vastu consultation?
This tool checks three placements (main entrance, kitchen corner, master-bedroom corner) against classical Vastu Shastra's eight-direction principles and shows what aligns, what conflicts, and the standard use-based correctives for each conflict. It cannot see your actual floor plan, so it does not account for beam positions, staircase or toilet placement relative to other rooms, the exact corner boundaries of an irregular unit, or how rooms interact with each other. That is the gap a full read closes: Vidit walks the specific shortlisted unit with the floor plan on the site visit, free, and gives the complete orientation analysis those three inputs alone cannot.
What does the Vastu Unit Check tool check?
The tool checks three placements you enter (the main entrance's facing direction, the kitchen's corner, and the master bedroom's corner) against classical Vastu Shastra's eight-direction (Vastu Purusha Mandala) principles, and returns an instant read on what aligns, what conflicts, and the standard use-based corrective for each conflict. It does not check anything beyond those three inputs (no beam positions, no staircase or toilet placement, no room-to-room interaction) because those need the actual floor plate, which is what the free site-visit read covers.
What does north-east facing mean in Vastu?
A north-east facing flat is one whose main entrance opens toward the north-east corner, called Ishan in classical Vastu Shastra, and treated as the single most auspicious direction in the eight-direction system, associated with spiritual clarity and the meeting point of the two most favoured single directions, north and east. 'Facing' means the direction the door itself opens toward, not simply which way the building block or tower sits; two units in the same tower can have different effective entrance directions depending on corridor and door position.
Are north-east facing flats available on the Yamuna Expressway?
Yes, in principle. Most multi-tower projects on the corridor include some north-east facing and north-east corner units, since a typical floor-plate has units facing multiple directions. We don't publish a live count of north-east facing units by project or tower, because it changes unit to unit and we would rather not guess. If a north-east facing flat on the Yamuna Expressway is a firm requirement, WhatsApp +91 98114 05300 with the project and budget you're considering, and we'll check the sanctioned floor-plan sheets for units that actually match, not an estimate. Our YEIDA Corridor Investment Report covers the wider corridor if you're still comparing projects.
Can I know a specific unit's orientation before I visit the site?
Yes. Once you've shortlisted a project and, ideally, a tower or floor range, our desk can request the sanctioned floor-plan sheet for that unit and share its exact entrance, kitchen and bedroom orientation on WhatsApp before your site visit. The visit itself is still where Vidit does the full read against the actual as-built layout, but you don't have to walk in blind. If you're planning to build rather than buy, the same North-arrow logic applies to a plot; see the YEIDA plot Vaastu guide for reading facing off a layout plan.
Vidit Kaushik, Director, Vidastu Developers Pvt. Ltd.

Vidit Kaushik

Civil Engineering, BITS Pilani · UP-RERA Agent UPRERAAGT000309/01/2026 · Director, Vidastu Developers Pvt. Ltd. Co-founded with Ravi Shankar Sharma, Vastu consultation background.

Want the full read on your exact unit?

Run the tool above, shortlist your unit, then bring it to the site visit; Vidit walks the actual floor plan with you and gives the complete orientation analysis, free, no obligation to book.

Vidastu Advisory · UP-RERA Agent UPRERAAGT000309/01/2026

Disclosure: This Vastu Unit Check tool is independent guidance from Vidastu Developers Pvt. Ltd. / Vidastu Advisory (sister brand, UP-RERA-registered agent UPRERAAGT000309/01/2026), an authorised channel partner, not Eldeco, Gaursons/Gaur Group, ACE Group, or any developer's official site. It produces a preliminary alignment read only, built from classical Vastu Shastra placement principles and your own selections; it is not a Vastu certificate, not a structural or legal opinion, and not an offer of sale. A full orientation read needs the actual floor plate, given free by Vidit on the site visit. This page states no assured returns, rental guarantees, buyback promises or outcome guarantees of any kind, and solicits no bookings beyond a free site-visit slot; verify any project's RERA status yourself at up-rera.in before you pay anything.