Vidastu Build · Scope configurator
Your plot, sized. Your build, scoped.
The Vidastu Build scope configurator turns a plot size in sq m or gaj, a floor count from G+1 to G+3 and a finish tier into an estimated built-up area for the house. The estimate works from published planning assumptions that include ground coverage of 70% to 80%, higher on smaller plots, and a cap near 1.8 times the plot area to mirror typical YEIDA-sanctioned FAR. This is a planning estimate, not a price; your detailed, itemised estimate is shared with you only after the founder walks your plot.
Last updated: 28 September 2026
- RERA UPRERAAGT000309/01/2026
- 4.8★ · 60 Google reviews
- Same Essential / Premium / Luxe packages as Vidastu Build
The configurator
Size your build. See the scope.
One published assumption, applied to your plot: the same ground-coverage/FAR planning assumptions used in our construction cost guide, so you can see the built-up area your build will actually cover. Everything below is illustrative.
Your detailed estimate is prepared after a site assessment — get it on WhatsApp.
Get my detailed estimate on WhatsApp →No obligation — the founder walks your plot before any pricing is shared.
- 10% · Agreement & design sign-off
- 20% · Foundation & plinth
- 35% · RCC structure & brickwork
- 25% · Finishes & interiors
- 10% · Handover
Indicative built-up area — not a price quote. Excludes plot cost, GST (18%), YEIDA/GNIDA approval and government fees, boundary wall, furniture and loose furnishings. Your detailed, itemised estimate is agreed in writing after a free site walk.
Transparency
One published assumption, applied honestly.
This configurator does not invent a number. It applies the same ground-coverage and FAR planning assumptions used in our construction cost guide to your plot size and floor count, so you see the built-up area your build will actually cover — across the same three tiers sold at /build/#packages.
Built-up-area assumptions: 70–80% ground coverage (higher on smaller plots), +5% per floor for staircase/circulation, capped near 1.8× plot area to mirror typical YEIDA-sanctioned FAR — the same model as the construction cost guide. Payment split: the indicative stage-wise schedule used across Vidastu's construction guides. Tier inclusions and pricing: shared person-to-person after a site assessment, and confirmed in writing before any payment. Full package inclusions/exclusions: /build/#packages.
FAQ
Questions about this estimate
Does this tool show me a construction cost?
What's different between the Essential, Premium and Luxe tiers?
Why is the estimated built-up area different from my plot size?
Is the payment-stage split shown here how my contract will read?
Talk to us
Talk to us on WhatsApp
Send your plot size and the tier you're considering. You get a reply from the delivery lead, not a call centre.
Get my detailed estimate on WhatsAppGet a callback in 24 hours
RERA UPRERAAGT000309/01/2026 · 4.8★ across 60 Google reviews
No obligation — the founder walks your plot first.
Got it. The delivery lead will call you within 24 hours.
Opening WhatsApp as confirmation…