— Insights · Money-Safety Scorecard

I put every Yamuna Expressway project through the same 5 money-safety checks. Here’s how many cleared all five.

The one-line read

Three. Of the 18 Yamuna Expressway corridor projects I track by name, only three cleared every one of five money-safety checks — ACE Terra, Purvanchal Sunbliss, and Eldeco Echoes of Eden — and I don’t sell two of those three. The other 15 each fell short on at least one check, and the table below says exactly which one, with the exact reason, dated.

Nobody made me build this. I run every corridor project I track — competitors and my own listing alike — through the same five checks: does the RERA number actually return on the government portal, is the possession date holding, does a real price exist, does EOI-stage money sit inside or outside escrow, and what does my own dataset’s confidence tag say. Where I haven’t finished checking something, the cell says so — it never guesses.

The disclosure that matters most, stated first: at EOI stage, money sits outside RERA escrow — always, by law. The requirement that 70% of buyer receipts be held in a dedicated project account applies only once a project is registered. Three tracked projects are EOI-only today — Gaur Plume / “Chrysalis 2.0”, ACE Parkway 2.0, and Gaurs Studio Bento — and every one of them fails Check 4 for exactly this reason, regardless of who is selling it, including us.

18Projects scored,
same 5 checks each
3Cleared all five
checks
6RERA numbers portal-
confirmed on our record
3EOI-only today —
money outside escrow

Built from data/corridor.json (row-level sources and confidence tags preserved), data/eoi-rera-tracker.json, the Delay Ledger, and direct checks against up-rera.in · per-row last-verified dates shown in the table.

Every corridor project page, ours included, will tell you its own project is safe. That sentence is worthless on its own — so instead of writing one more of them, I built a scorecard that treats every project I track, ours and every competitor’s, exactly the same way: five checks, disclosed below, applied uniformly, with the underlying data already sitting in our own open dataset. I looked up what I could on the government portal myself. Where I hadn’t finished a check yet, I said so instead of guessing. What came out the other end surprised me a little — and I’m publishing the whole matrix, not just the parts that make us look good.

The 5 checks, disclosed

CHECK 1

RERA portal lookup

Does the RERA number actually return a result when I search it on the government portal, up-rera.in — not a broker’s word, not a brochure cover?

CHECK 2

Possession holding

Is the on-record RERA possession date still the date — or has a later filing, or a documented regulatory finding, moved it since?

CHECK 3

Price sourced

Does a real, attributable price exist anywhere for this project — or does every domain just say “Price on Request”?

CHECK 4

EOI-stage escrow

At this project’s current selling stage, does your money sit inside the RERA-mandated escrow account, or outside it?

CHECK 5

My own confidence tag

What does our own corridor dataset’s confidence tag say — confirmed (independently corroborated), reported, or founder-stated?

The full scorecard — all 18 projects, all 5 checks

Sorted by checks cleared, highest first. pass means the check cleared on a dated, cited data point. fail means we found a specific negative fact — never an assumption. insufficient data means our own desk hasn’t finished that check for this project yet, and says so instead of guessing. n/a means the check doesn’t apply at this project’s current stage (for example, a sold-out project has no live money flow for the escrow check to test).

Project Check 1 · RERA Portal Check 2 · Possession Check 3 · Price Check 4 · EOI Escrow Check 5 · Confidence Verdict
ACE TerraACE Group · Sector 22D passup-rera.in, 10 Jul 2026 passOn original schedule — Delay Ledger passFrom ₹2.63 Cr (range disputed ₹1.76–3.38 Cr) passRegistered → escrow applies passconfirmed 5/5
Purvanchal SunblissPurvanchal Group · Sector 22D passup-rera.in, 11 Jul 2026 passOn original schedule — Delay Ledger pass~₹10,000/sq.ft reported; 4BHK ₹3.6 Cr* on own site passRegistered → escrow applies passconfirmed 5/5
Eldeco Echoes of EdenEldeco Group · Sector 22D · our own mandate passPortal-checked in our own EOE-vs-WOW filing comparison passOn original schedule — Delay Ledger, same footing pass₹9,300/sq.ft, entry ~₹1.44 Cr (Caelum tower) passRegistered, no EOI step → escrow applies passconfirmed 5/5
ATS AllureATS Group · Sector 22D passup-rera.in, 10 Jul 2026 failFeb 2023 UP-RERA order: delivery incomplete for 19 complainants, 60-day possession order + delay interest pass₹1.15–1.53 Cr (sources disagree) passRegistered → escrow applies passconfirmed 4/5
Greenbay The MonarqueGreenbay Group · Sector 22D passup-rera.in via sibling filing + ReraTracker aggregation, 11 Jul 2026 passOn original schedule — Delay Ledger failNo public price found anywhere, not even in the RERA filing summary passRegistered → escrow applies passconfirmed 4/5
Whispers of WonderEldeco Group · Sector 22D · not our mandate passPortal-checked in our own EOE-vs-WOW filing comparison insufficient dataPossession single-sourced (reported target); not yet pulled to Delay-Ledger standard pass~₹8,700/sq.ft reported (~₹1.35 Cr) passRegistered → escrow applies failreported 3/5
Gaur Chrysalis (Phase 1)Gaursons · Sector 22D · sold out insufficient dataNumber confirmed via 4 news domains, not yet portal-pulled by us insufficient dataDelay Ledger: “still sourcing” — promoter/date not pulled to standard yet pass₹11,000/sq.ft exact price list on file n/aSold out — no live primary-sale money flow to test passconfirmed 2/5 +1 n/a
ACE EditACE Group · Sector 22D · commercial insufficient dataNumber from developer’s own site only, not portal-pulled insufficient dataNo possession date captured in our dataset passFrom ₹85.76 lakh insufficient dataCan’t confirm escrow without confirming registration first passconfirmed 2/5
ACE YXPACE Group · Sector 22D · commercial insufficient dataNumber from developer’s own site only, not portal-pulled insufficient dataNo possession date captured in our dataset passFrom ₹1.50 Cr insufficient dataCan’t confirm escrow without confirming registration first passconfirmed 2/5
ACE VerdeACE Group · Sector 22A insufficient dataNumber from developer’s own site only, not portal-pulled insufficient dataPossession (Apr 2029) single-sourced, not portal-pulled passFrom ₹2 Cr insufficient dataCan’t confirm escrow without confirming registration first passconfirmed 2/5
ACE HiveACE Group · Sector 22A · commercial insufficient dataNumber from developer’s own site only, not portal-pulled insufficient dataNo possession date captured in our dataset passFrom ₹92 lakh insufficient dataCan’t confirm escrow without confirming registration first passconfirmed 2/5
Ballads of BlissEldeco Group · Sector 22D · not our mandate insufficient dataNumber reconciled via our own disambiguation research, not an explicit portal confirmation insufficient dataPossession (Apr 2030, reported target) single-sourced pass~₹7,000–9,000/sq.ft reported insufficient dataCan’t confirm escrow without confirming registration first failreported 1/5
Arihant Seasons 22DArihant Buildcon · Sector 22D failPortal queried directly, 11 Jul 2026 — no browsable result returned for this number insufficient dataPossession not stated anywhere (pre-launch pricing) pass~₹7,500–10,000/sq.ft cited (conflicting) failNo confirmed registration = no confirmed escrow account failreported 1/5
Gaur Plume / “Chrysalis 2.0”Gaursons · Sector 22D · EOI-only failPre-RERA — no registration number exists to check failPre-RERA — no filed completion date exists to hold or slip pass₹8,499/sq.ft indicative EOI rate; newer brochure cites ₹1.32 Cr* on 3 BHK failEOI-only — money sits outside RERA escrow by law failreported 1/5
ACE Parkway 2.0ACE Group · Sector 150 (adjacent market) · EOI-only failPre-RERA — no registration number exists to check failPre-RERA — no filed completion date exists to hold or slip pass₹16,995/sq.ft indicative pre-launch BSP failEOI-only — money sits outside RERA escrow by law failreported 1/5
Gaurs Studio BentoGaursons · Sector 19 · EOI-only failNo confirmed registration as this project’s own — 3 circulating numbers all trace elsewhere or unconfirmed failPre-RERA — no filed completion date exists to hold or slip pass~₹80 lakh* indicative (channel-partner quote) failEOI-only — money sits outside RERA escrow by law failfounder-stated 1/5
County (Yamuna Expressway)Developer unconfirmed · Sector 22D failNo RERA number found across 9 promotional domains checked insufficient dataPossession not stated anywhere failEvery one of 9 domains marks it “Price on Request” failNo confirmed registration = no confirmed escrow account failreported 0/5
Orion (Sector 22D)Developer unconfirmed · Sector 22D failNo RERA number found across 10 domains — one literally states “RERA No: Update Soon” insufficient dataPossession not stated anywhere fail“On request” — no public figure anywhere failNo confirmed registration = no confirmed escrow account failreported 0/5

Vidastu is the disclosed channel partner only for Eldeco Echoes of Eden, Gaur Plume, ACE Parkway 2.0 and Gaurs Studio Bento among the rows above; every other project is listed as data, not a recommendation. Verify any project’s live status yourself at up-rera.in before paying anything. A “fail” on this table is a specific, cited finding — never an accusation of wrongdoing, and never a substitute for reading the project’s own filing.

Who cleared all five — and who almost did

Three projects passed every check. Two more missed by exactly one — and the specific miss tells you more than the score does.

5/5 · cleared all five

ACE Terra

Portal-confirmed registration (UPRERAPRJ683816/04/2024, promoter Ajay Realcon India LLP — a separate legal entity from the delivered ACE Parkway’s promoter), on-original-schedule possession, a real sourced price, escrow protection, and corridor.json’s own confirmed tag. We are not the sales channel for this project.

Read the full review →
5/5 · cleared all five

Purvanchal Sunbliss

Registration, promoter (Purvanchal Projects Private Limited) and declared completion (29 Jan 2030) all confirmed directly on up-rera.in. A real price exists, even though portal and marketing-site size figures disagree elsewhere — that mismatch doesn’t touch any of the five checks scored here. We are not the sales channel for this project.

Read the full review →
5/5 · cleared all five

Eldeco Echoes of Eden

Our own listed project, scored on the identical five checks as every competitor above — not graded on a curve. It clears on its own merits: registered, no EOI step, on-original-schedule possession, a real current price, and escrow protection.

See current availability →
4/5 · missed on possession

ATS Allure

Registered since 2017, portal-confirmed, priced, escrow-protected — and it still fails Check 2, because a February 2023 UP-RERA order found delivery incomplete for 19 complainants and ordered possession within 60 days plus delay interest. Registration protects the money trail; it doesn’t by itself guarantee the timeline.

Read the full review →
4/5 · missed on price

Greenbay The Monarque

Registration, promoter and possession all confirmed — and it still fails Check 3, because no public price could be found anywhere for it, including the project’s own RERA filing summary. Registered doesn’t automatically mean priced.

Read the full review →

The EOI-only cohort: money outside escrow, by construction

Three projects I track are currently EOI-only — Gaur Plume / “Chrysalis 2.0”, ACE Parkway 2.0, and Gaurs Studio Bento, one of which is our own mandate. All three fail Checks 1, 2 and 4 for the identical structural reason: no RERA registration exists yet, so there is no filed possession date to hold or slip, and no escrow account for money to sit inside. This is not a comment on any one of the three — it is what “pre-RERA” means, applied consistently, on our own project exactly as on anyone else’s. Each of the three still clears Check 3 (a real indicative price exists and is disclosed with its asterisk), which is why none of them scores zero.

What an EOI on any of these three actually is: a refundable expression of interest, not a booking or an allotment, and not a price lock. If you pay one, get the refund clause in writing, confirm the payee is the developer’s official account, and check the project on up-rera.in yourself — before and after paying. The full mechanics live on the EOI-to-RERA Tracker.

What I haven’t checked yet — and am naming, not hiding

Methodology — exactly how each check is scored

Every row is built from data/corridor.json, its companion data/eoi-rera-tracker.json, the Delay Ledger, and dated checks against the government portal, up-rera.in. This is a disclosed editorial rubric — five checks I chose — not an official RERA rating.

Check 1 — RERA portal lookup
Pass: a direct, dated up-rera.in portal check for this exact project’s registration is on our record. Insufficient data: a number exists (developer- or single-source-stated) but we haven’t pulled a direct portal confirmation for it yet. Fail: no RERA number exists to check (pre-launch), the portal was queried and returned nothing browsable for the stated number, or an extensive multi-domain search never turned one up at all.
Check 2 — possession holding
Pass: tracked in the Delay Ledger with the originally filed date intact and no later revision found. Fail: a real, dated, cited slip or regulatory delay finding exists. Insufficient data: the possession date is single-source/reported only, a genuine dataset gap not yet pulled to Delay-Ledger standard, or the project is pre-launch with no filed date to test at all.
Check 3 — price sourced
Pass: a specific, attributable number exists somewhere, even if it’s a wide or conflicting range, or carries an asterisk. Fail: no public figure exists at all, or the answer everywhere checked is literally “on request.”
Check 4 — EOI-stage escrow
Derived directly from Check 1, because RERA’s 70%-escrow mandate only binds a real, portal-confirmed registration. Pass: Check 1 passed — the registration is portal-confirmed, so the escrow mandate is live. Insufficient data: Check 1 is insufficient — we won’t vouch for an escrow account we haven’t confirmed exists. Fail: no confirmed registration exists at all, including every EOI-only pre-launch, where money sits outside escrow by law regardless of Check 1’s status. N/A: the project is sold out, so there is no live primary-sale money flow for the check to evaluate.
Check 5 — my own confidence tag
Read verbatim from corridor.json’s own confidence field. Pass: tagged confirmed — two or more independent domains agree, or a direct portal fetch. Fail: tagged reported (one named, dated source) or founder-stated (internal ground truth, not yet independently corroborated).
Scope
Every named project in data/corridor.json’s residential/commercial sectors (22D, 22A, 19, and the explicitly-labelled Sector 150 adjacent-market row) is scored — 18 projects at this update. Sector 18 and Sector 20 carry no named developer project in our dossier and are excluded for that reason, not omitted by choice.
Cadence
Re-checked on the same weekly cadence as our other corridor trackers. If the publish stamp at the top of this page is more than two weeks old when you read it, treat individual rows as historical and check the live pages linked from each one.

Where to go from here

This scorecard compresses three companion trackers into one verdict. Each one goes deeper on its own check.

FAQ

How many Yamuna Expressway corridor projects passed all 5 money-safety checks?
Three, as of 20 July 2026 — ACE Terra, Purvanchal Sunbliss, and Eldeco Echoes of Eden. All three carry a RERA number that returns on the government portal, an on-record possession date with no filed slip or regulatory delay finding against it, a real sourced price, money that sits inside RERA escrow, and corridor.json's own 'confirmed' confidence tag. Eldeco Echoes of Eden is our own listed project — it was scored on the same five checks as every competitor, not graded on a curve.
What are the 5 money-safety checks?
Five checks, applied identically to every named project in our corridor dataset: (1) does the RERA number actually return a result on the government portal, up-rera.in; (2) is the on-record possession date holding, or has a later filing or regulatory finding moved it; (3) does a real, attributable price exist, or does every source just say 'on request'; (4) at this project's current selling stage, does money sit inside or outside the RERA-mandated escrow account; (5) what does our own corridor dataset's confidence tag — confirmed, reported, or founder-stated — say about how independently corroborated the underlying facts are. Full definitions and edge cases are in the methodology box below the scorecard.
Is this an official RERA rating?
No. UP-RERA does not publish a comparative rating of registered projects, and neither does anyone else with authority to. This is Vidit Kaushik's own disclosed editorial rubric — five checks I chose, applied the same way to every project in our own open corridor dataset, cross-checked where possible against the government portal directly. It is methodology and opinion, not an official government rating, and every fail here maps to a specific, cited data point — never an assumption. Always verify any project's live RERA status yourself at up-rera.in before paying anything.
Does 'insufficient data' mean a project failed a check?
No — and that distinction is the point of using a separate label instead of folding it into fail. Insufficient data means our own desk hasn't finished a specific check for that project yet, usually because a RERA number is developer-stated but not yet portal-confirmed by us, or a possession date is single-sourced and hasn't been pulled to our Delay Ledger's stricter standard. It is a gap in our verification work, dated and named, not a finding against the project. A fail, by contrast, always maps to a specific negative fact we did check — no RERA number exists, no price is published anywhere, or a portal query returned nothing.
If I pay an EOI on a pre-RERA project, is my money inside RERA escrow?
No. A pre-RERA Expression of Interest sits outside the RERA escrow account by law — the requirement that 70% of buyer receipts be held in a dedicated project account applies only once a project is registered. Three projects on this scorecard are currently EOI-only — Gaur Plume / Chrysalis 2.0, ACE Parkway 2.0, and Gaurs Studio Bento — and every one of them fails Check 4 for exactly this reason, regardless of who is selling it. Get the refund clause in writing before paying anything, and pay only into the developer's official account.
Does failing one check mean a project is unsafe?
No. Look at the two projects that cleared four of five: ATS Allure is RERA-registered since 2017 with a confirmed portal check, a sourced price, and escrow protection — it fails only Check 2, because of a real, dated 2023 regulatory order about delivery delay. Greenbay The Monarque clears everything except Check 3, because no public price could be found anywhere for it, including its own RERA filing summary. Each check answers one specific question; read the row, not just the score, before deciding what a gap means for you.
How often is this scorecard updated, and where does the data come from?
The scorecard is re-checked against our own corridor.json dataset and, where possible, the UP-RERA portal directly, on the same weekly cadence as our other corridor trackers. Every row carries its own confidence tag and a per-row last-verified date; the underlying data lives at data/corridor.json and its companion data/eoi-rera-tracker.json. If the stamp date at the top of this page is more than two weeks old when you're reading it, treat individual rows as historical and check the live pages linked from each one.
Sources
  1. Vidastu open corridor dataset — row-level sources, confidence tags and last-verified dates for every project scored above: data/corridor.json (schema v2.0)
  2. EOI-to-RERA Tracker — machine-readable companion behind Checks 1 and 4 for every EOI-only project: data/eoi-rera-tracker.json
  3. The Delay Ledger — the possession-date record behind Check 2: /insights/delay-ledger
  4. UP-RERA public project registry — the only place a registration claim is settled: up-rera.in/projects
  5. Vidastu's verify-first reviews behind individual rows: ACE Terra · ATS Allure · Purvanchal Sunbliss · Greenbay The Monarque · Arihant Seasons 22D · County · Orion · Gaur Chrysalis (Phase 1)
Vidit Kaushik, Founder, Vidastu Developers Pvt. Ltd.

Vidit Kaushik

Civil Engineering, BITS Pilani · UP-RERA Agent UPRERAAGT000309/01/2026 · Founder, Vidastu Developers Pvt. Ltd.

Want the row for a project not listed here? Ask me to run the same five checks.

Send me a project name on WhatsApp and I’ll walk you through what our desk actually knows against these same five checks — RERA portal status, possession, price, escrow, confidence — including where the honest answer is “we haven’t verified that yet.”