In one paragraph
Vidastu Developers Pvt. Ltd. builds homes end to end on owners’ plots — across Noida & NCR, HQ Greater Noida — and advises on Yamuna Expressway property on the side. Founded in 2012 by Vidit Kaushik (Civil Engineering, BITS Pilani). UP-RERA registered: UPRERAAGT000309/01/2026. Rated 4.8★ across 60 Google reviews. Construction: +91 95404 45300. Property and advisory: Vidit Kaushik, +91 95404 45300.
Construction first. Advisory second.
A drawing, not a brochure.
Most building firms hand you a brochure. We hand you a drawing. Vidastu started in 2012 on this corridor — building, supervising, and reading structural drawings before reading price lists. Today the construction practice is the core of the firm: turnkey homes on owners’ plots, delivered under a written milestone contract, typically in 10–16 months.
The advisory practice — YEIDA plots, Yamuna Expressway apartments, NRI buying — exists because clients kept asking the builders for buying advice. We kept it. It runs second, under Vidit.
Who you will deal with
The three people you will deal with.
Vidit Kaushik
Civil Engineer, BITS Pilani. Vidit walks your plot before we quote — every site, personally or with his delivery team, no exceptions. He reads the soil, the setbacks and the drawings, then puts one binding, itemised fixed quote in writing. Behind that quote sits the firm’s 30+ year track record of building on this corridor, anchored by co-founder Shri Ravi Shankar Sharma.
Reach him: [email protected] · LinkedIn
Shri Ravi Shankar Sharma
Veteran builder and senior Vastu consultant. The reason every Vidastu home is Vaastu-aligned by design — orientation, entrance, kitchen and pooja placement are resolved on the drawing board, not patched later. He also conducts every paid Property Vaastu visit himself (₹10,999, one hour on-site, Delhi NCR). Both practices predate the firm’s 2012 incorporation. His line — +91 95404 45300 — is a personal number. No IVR, no call-centre, no “let me check with my manager.”
Sachin Bansal
Sachin runs the property side: YEIDA plots, apartments (Eldeco, Gaur, SKA, Gulshan), and the NRI desk. 100+ closures across YEIDA and Greater Noida.
What we build
Turnkey, Vaastu-aligned, on your plot.
- Turnkey homes on your plot — design to handover, across Noida & NCR, deepest base on YEIDA / Greater Noida. The construction practice →
- Plan approvals handled in-house — part of every build. You sign once; we run the paperwork.
- Three packages — Essential, Premium, Luxe. Every home Vaastu-aligned by design. Full inclusion lists →
- Milestone-linked payments — never a large advance.
- Weekly proof — photo and video updates from your own site, every week on WhatsApp.
The price requires a call. Every plot is different, so there is no rate card — one binding, itemised fixed quote follows a free site walk. +91 95404 45300.
What we advise on
Vetted availability, not a listings feed.
- YEIDA residential plots — hand-picked availability in Sectors 18, 20, 22D, shared one-to-one on request.
- Apartments — four projects we have walked and vetted: Eldeco Echoes of Eden, Gaur Yamuna Expressway, SKA Destiny One, Gulshan Empire.
- Property Vaastu — ₹10,999, one hour on-site, by Shri Ravi Shankar Sharma. Book →
- NRI buyer desk — Power-of-Attorney, FEMA-compliant remittance, video site visits. The guide →
How we behave
Four rules we don’t break.
- No call-centre. The founder calls back on construction enquiries; Vidit on property.
- We don’t quote a build until we’ve walked the plot.
- We don’t take construction work we can’t personally walk weekly.
- We don’t represent projects we haven’t physically inspected.
Sister brand: Vidastu Advisory · Eldeco Echoes of Eden
Vidit also runs Vidastu Advisory, the UP-RERA-registered channel partner (Reg. No. UPRERAAGT000309/01/2026) for Eldeco Echoes of Eden at Sector 22D, Yamuna Expressway. Same founder, same lead routing (Vidit), separate brand. eldecoeoe.com →
Office
Walk-ins welcome.
206 SF, Sector Alpha Road, Alpha 1, Greater Noida, Uttar Pradesh 201308. Walk-ins welcome Mon–Sat, 10:00 AM – 7:00 PM. Coffee on the house. Full contact page →
Where to next
UP-RERA UPRERAAGT000309/01/2026 · Vidastu Advisory only. Last reviewed 11 June 2026.
What people ask before they call.
Who runs Vidastu, and what are their credentials?
Is Vidastu a developer, a contractor or a property agent?
Where does Vidastu work, and will someone actually visit my plot?
Building on your plot?
Start with the site walk.
It’s free, there’s no obligation, and the founder’s team walks it with you. The fixed quote follows in writing. Buying, not building? Vidit Kaushik takes that call personally.
Call the desk · +91 95404 45300An engineer replies within 2 working hours — not a call-centre.
Got it — the team’s on it.
First response within 2 working hours. Opening WhatsApp so we can start now.