Insights · Interactive map

The YEIDA Corridor Explorer

By Vidit Kaushik Updated 10 Jul 2026 UP-RERA Agent UPRERAAGT000309/01/2026 6 corridor nodes, sourced inline
How to use this map

This is a schematic survey of the YEIDA / Yamuna Expressway corridor: not drawn to scale, and the sector order is simplified for clarity. Click, tap or Tab to any of the six nodes on the route below (Sectors 22D, 22A, 18, 20, Film City (Sector 21) and the Jewar airport terminus), and the survey panel on the right fills in with that node’s named projects, RERA stage, land-scheme status and infrastructure facts. Every line is tagged Confirmed, Reported or Gap, drawn from our own sector guide and airport timeline reviews, with a source and a date behind every figure.

Open in Sector 22D right now

Two homes in the sector our desk can open today. Both sit on the UP-RERA register, and we will put a dated cost sheet for either one in writing.

Eldeco Echoes of Eden, Caelum tower. Registered as UPRERAPRJ125342/02/2026, with 11 January 2031 recorded on the register as the completion date. The basic sale price for Caelum is ₹11,000 per sq ft* on super area, plus other charges, as on 8 October 2026, with Haven and Elysian fully booked. Read the Echoes of Eden pages.

Eldeco Ballads of Bliss, owner resale. Registered as UPRERAPRJ921261/05/2025 and sold out since June 2025 per Eldeco's announcement, so resale is the route in. One 3 BHK of 1,550 sq.ft super area is open at ₹8,299/sq.ft* on super area plus other charges, with the full figure on the unit sheet. Read the Ballads unit.

Ask what is open in Sector 22D →
Confirmed: two or more independent sources agree Reported: one named, dated source Gap: no verifiable project found, not a certified absence

Distances and travel-time figures on this corridor are almost always single-source, developer-stated claims; this map labels them Reported rather than repeating them as settled fact.

← scroll to explore the full route →

Why this looks the way it does: the route above is a stylised survey line, not a georeferenced map; the real Yamuna Expressway corridor doesn’t run in a straight diagonal, and sector boundaries aren’t evenly spaced the way the six nodes are drawn here. Treat position on this map as ordering, not geometry. For the full prose version of every fact in this tool, with side-by-side comparison tables, read the YEIDA sector guide and the airport timeline review. For the investment case with sourced facts on both sides, read Yamuna Expressway investment. For a single table tracking every named project’s current booking status across the corridor, see our live status grid. For any project’s live RERA status, always check up-rera.in directly before paying anything.

Vidit Kaushik, Director, Vidastu Developers Pvt. Ltd.

Vidit Kaushik

Civil Engineering, BITS Pilani · UP-RERA Agent UPRERAAGT000309/01/2026 · Director, Vidastu Developers Pvt. Ltd.

Want the sector checked against your shortlist?

Tell Vidit which node on this map you’re actually considering. He’ll tell you its real RERA stage, what’s confirmed about its surroundings, and what’s still a projection.