NRI Plot + Build · Yamuna Expressway / YEIDA corridor

Own the land. We build the home. You watch from abroad.

Buy a plot in the corridor around the now-operational Noida (Jewar) airport, and Vidastu designs, gets approvals, builds and hands over your home end-to-end — typically 10–16 months — with photo and video updates on WhatsApp at every stage.

UP-RERA registered ★ 4.8 / 54 reviews Named, video-callable team Milestone-linked payments

What “turnkey” means here

A finished home — scope fixed in writing before we start.

“Turnkey” is precise, not a slogan. Your written agreement lists every inclusion and exclusion so there are no surprises.

In your written agreement

Included

  • ✓ Architectural & structural design (Vastu-aligned to your brief)
  • ✓ Layout sanction & statutory approvals
  • ✓ Structure — foundation to roof, engineered
  • ✓ Finishes — flooring, joinery, electrical, plumbing, fittings
  • ✓ Snag-free handover with documents
Discussed & agreed upfront

Agreed case-by-case

  • → Premium imported materials / bespoke fittings
  • → Landscaping, boundary & gate beyond the base spec
  • → Furniture & appliances
  • → Plot purchase cost (separate from the build)
  • → Government fees, stamp duty & registration

Indicative; the binding scope is your signed builder–buyer agreement. See the full Vidastu Build program (Essential / Vaastu Premium / Luxe) →

How remote-build works

Five stages — you see each one from abroad.

Photo/video updates and video calls at every stage. Payments are milestone-linked and matched to your bank disbursements.

Stage 1

Design

Vastu-aligned design to your brief, approved over video call.

You see: 3D walkthrough
Stage 2

Plan approval

Layout sanction & approvals handled on the ground.

You see: sanctioned plan
Stage 3

Structure

Foundation to roof, with engineering oversight.

You see: site video updates
Stage 4

Finishes

Flooring, joinery & fittings — chosen with you remotely.

You see: material samples
Stage 5

Handover

Snag-free handover, keys & documents to your representative.

You see: final walkthrough

Money & paperwork, simplified

FEMA-compliant, milestone-linked, signed by your representative.

Routing

NRE / NRO routing

Pay for the plot and construction from your NRE, NRO or FCNR account via banking channels — no cash. We coordinate with your bank.

Paperwork

Power of Attorney

A trusted person signs in India on your behalf — apostilled (Western countries) or Indian-consulate attested (Gulf).

Cadence

Milestone payments

Construction is billed in stages matched to verified progress, so money follows work — not the other way round.

Protection

RERA escrow

For RERA-registered projects, ≥70% of buyer funds sit in project escrow, drawn only against verified milestones.

General information, not legal/tax advice — please consult your CA / FEMA advisor. Full detail in our NRI FEMA guide →

Why Vidastu

A named team you video-call before you commit a rupee.

Vidit Kaushik, Founder of Vidastu
Founder

Vidit Kaushik

BITS Pilani, civil engineer. Leads design-build & the NRI desk.

Ravi Shankar Sharma, Co-founder of Vidastu
Co-founder · 30+ years

Ravi Shankar Sharma

Three decades in Greater Noida real estate & Vastu.

Since 2012 · UP-RERA agent UPRERAAGT000309/01/2026 · 4.8★ across 54 Google reviews. Need a plot first? We run end-to-end YEIDA plot advisory.

Estimate your project

Plot + build, in your currency.

Indicative estimate, not a guarantee. Send your budget band and country below and we'll come back with real numbers, in your currency, within the day.

Questions NRIs ask

Straight answers.

Can an NRI buy a plot and build a house in India?
Yes - NRIs/OCIs may buy residential and development-authority residential plots (e.g. YEIDA) and build, but not agricultural land/farmhouses/plantations. Payment via NRE/NRO/FCNR. Consult your CA/FEMA advisor. See our FEMA guide.
What does turnkey include?
Design, plan approvals, structure (foundation to roof), and finishes (flooring, joinery, electrical, plumbing, fittings) through to a snag-free handover. The exact scope, inclusions and exclusions are fixed in your written agreement before work begins.
How do I see progress and pay from abroad?
You receive photo and video updates on WhatsApp at each stage and can video-call the team. Payments are milestone-linked and matched to verified progress, routed through your NRE/NRO account; a Power of Attorney lets a trusted person sign in India.
Who owns the land and the home?
You do. The plot is registered in your name (with your representative acting under PoA for signing). Vidastu is your design-build partner, not a co-owner.
What if I can never visit during construction?
That's the point of remote-build: photo/video updates at each stage, video calls with the team, and a representative under PoA on the ground. Many NRIs complete a build without flying in.
How long does it take?
Typically 10 - 16 months from design to handover, depending on size, approvals and specification.
How are payments structured?
Milestone-linked, matched to verified construction progress, paid from your NRE/NRO account. For RERA-registered projects, ≥70% of funds sit in escrow.

Vidastu NRI — explore by country

Start here

Get your plot + build estimate. We'll call you at a Gulf-friendly hour.

A plot shortlist matched to your goal & budget, an indicative plot + build cost in your currency, a no-obligation video call with the founder, and straight answers on FEMA, money & timelines.

Call the NRI desk · +91 95404 45300

Takes 30 seconds. We reply on WhatsApp.

By submitting you agree we may contact you about your enquiry. UP-RERA Agent UPRERAAGT000309/01/2026.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.