The short answer
Sector 22D is a YEIDA-planned residential sector on the Yamuna Expressway, Greater Noida — approximately 10 minutes from Noida International Airport (Jewar) and 35 minutes from Greater Noida West. It hosts premium projects including Eldeco Echoes of Eden, and its neighbours have seen launches from ATS, Migsun and Oasis. Connectivity runs on the Yamuna Expressway today, with the Noida Metro Aqua Line extension planned through the corridor.
Sector 22D in September 2026
The UP-RERA register listed 15 projects in Sector 22D when we read it on 25 August 2026, the 15 reproduced below. Eldeco Echoes of Eden is the one we can confirm as open for booking as of 1 September 2026; Gaur Alaris closed Phase 1 bookings on 1 September 2026, and the sector's earlier Gaur Chrysalis Phase 1 is reported sold out.
Two of our own pages state the same roughly 10-minute drive to Jewar Airport as two different distances: roughly 10–12 km on our Jewar Airport distance guide, and roughly 12–15 km on our corridor connectivity matrix. Both describe the same route, so treat 10–15 km as the honest range for Sector 22D until you check the live route for your own plot.
Of the 25+ YEIDA sectors along the Yamuna Expressway, one is consistently flagged by channel partners, institutional buyers, and airport-corridor analysts as the highest-potential residential address: Sector 22D. This guide explains exactly what Sector 22D is, why it matters, how it compares to neighbouring sectors, and what to look for when evaluating a property purchase here.
Where is Sector 22D?
Every Sector 22D project on the UP-RERA register
Read directly from the Uttar Pradesh RERA register on 25 August 2026: 15 projects are registered at Sector 22D, Yamuna Expressway (YEIDA). Ordered by registration date, newest first. Every figure below is the filing itself — the registration number, the promoter of record, and the completion date as declared. Each project name links to its full register record.
Registered 2024–2026
| Project | UP-RERA registration | Promoter on record | Registered | Completion on record |
|---|---|---|---|---|
| Gaur Alaris (Phase 1) | UPRERAPRJ950965/07/2026 | Gaursons India Private Limited | 28-07-2026 | 09-06-2031 |
| Eldeco Echoes Of Eden | UPRERAPRJ125342/02/2026 | Eldeco Sohna Projects Limited | 27-02-2026 | 11-01-2031 |
| Arihant Seasons | UPRERAPRJ974543/02/2026 | Arihant Urban Space Private Limited | 24-02-2026 | 05-01-2031 |
| Vvip Yamuna | UPRERAPRJ677791/02/2026 | Vvip Infrahome Private Limited | 05-02-2026 | 30-10-2030 |
| Gaur Chrysalis (Phase 1) | UPRERAPRJ622344/11/2025 | Gaursons Promoters Private Limited | 04-11-2025 | 05-10-2030 |
| Ace Edit | UPRERAPRJ467686/09/2025 | Logix Buildestate Pvt Ltd | 11-09-2025 | 30-04-2029 |
| Purvanchal Sunbliss Plot No. Gh-1A/1 Sector 22D Yeida | UPRERAPRJ746863/04/2025 | Purvanchal Projects Private Limited | 08-04-2025 | 29-01-2030 |
| Oasis Grandstand Phase-2 | UPRERAPRJ585804/01/2025 | Oasis Realtech Pvt Ltd | 25-01-2025 | 23-01-2029 |
| Ace Estate | UPRERAPRJ442226/10/2024 | Logix Buildestate Pvt Ltd | 28-10-2024 | 31-12-2025 |
| Ace Terra | UPRERAPRJ683816/04/2024 | Ajay Realcon India Llp | 04-04-2024 | 28-12-2028 |
Earlier Sector 22D registrations on the same record
| Project | UP-RERA registration | Promoter on record | Registered | Completion on record |
|---|---|---|---|---|
| Convenient Shopping Complex, Sector 22D | UPRERAPRJ15338 | Yamuna Expressway Industrial Devlopment Authority | 28-02-2018 | 30-06-2018 |
| GH06, Sec-22D, YEIDA | UPRERAPRJ8947 | Yamuna Expressway Industrial Devlopment Authority | 10-08-2017 | 30-12-2019 |
| Affordable Housing Sector-22D YEIDA | UPRERAPRJ8647 | Yamuna Expressway Industrial Devlopment Authority | 09-08-2017 | 28-12-2019 |
| Rps-02, Sec-22D | UPRERAPRJ8756 | Yamuna Expressway Industrial Devlopment Authority | 09-08-2017 | 10-09-2019 |
| Ats Allure | UPRERAPRJ918 | Ats Realty Private Limited | 31-07-2017 | 04-09-2019 |
Verify any of these yourself on the official portal at up-rera.in before you pay anything. Vidastu Advisory is a UP-RERA registered agent, UPRERAAGT000309/01/2026, and is not the developer of any project listed.
Sector 22D is a planned residential sector under the Yamuna Expressway Industrial Development Authority (YEIDA), located directly off the Yamuna Expressway in Gautam Buddha Nagar district, Uttar Pradesh. It sits between two critical infrastructure anchors — the Noida International Airport at Jewar to the south and the established Greater Noida urban belt to the north.
Sector 22D, Yamuna Expressway is a YEIDA-planned residential sector in Gautam Buddha Nagar, Uttar Pradesh — about 10 minutes’ drive from Noida International Airport (Jewar) and roughly 20 minutes from Pari Chowk, Greater Noida.
Sector 22D — quick reference
Why Sector 22D matters more than other YEIDA sectors
Not every sector along the Yamuna Expressway will develop the same way. The corridor is long, and the pace differs sharply pocket to pocket. Sector 22D is one of those pockets because it combines four structural advantages that most sectors have only one or two of.
1. The 10-minute airport rule
Historically, airport-corridor appreciation concentrates in sectors within a 10–15 minute drive of the terminal. Beyond that radius, the premium dilutes rapidly. Sector 22D is firmly inside the 10-minute zone from Noida International Airport. Sectors 17, 18, 20 and 22 also qualify; sectors 32+ are outside it.
2. Direct expressway access
Many interior sectors require a 5–10 minute drive through service roads before reaching the expressway. Sector 22D has direct access, which matters for both daily commutes and eventual rental yield.
3. YEIDA infrastructure readiness
Internal roads, water, power and sewage infrastructure is already developed. This distinguishes 22D from deeper greenfield sectors where infrastructure is still being laid. For end-users, this means habitability at possession, not three years after. It also matters if you hold a residential plot nearby — with trunk infrastructure in place, nothing stops you from getting your naksha sanctioned by YEIDA and starting work the same season.
4. Limited premium launched supply
Only a handful of premium residential projects have launched in Sector 22D so far. The most prominent is Eldeco Echoes of Eden, alongside Gaurs’ peacock-themed project at the same address — see our review of Gaur Alaris price, floor plans and location for the second half of the picture. Limited supply paired with rising demand is a textbook pricing setup.
Weighing options beyond this corridor? We also independently review Gulshan Empire, a separate NCR location at Wave City, Ghaziabad, with its own connectivity and pricing profile — the full read on that address is at Gulshan Empire Wave City. For a same-district comparison instead of a different city, see this project-by-project comparison against ACE Arte in Sector 150, Noida — a different corridor within the same Gautam Buddha Nagar district as Sector 22D.
Sector 22D vs neighbouring YEIDA sectors
| Sector | Airport drive | Infrastructure | Launched premium supply |
|---|---|---|---|
| Sector 22D | ~10 min | Developed | Limited (Eldeco EOE) |
| Sector 17A | ~15 min | Developed | Moderate (Godrej, ATS peers) |
| Sector 18 | ~12 min | Partial | Low |
| Sector 20 | ~15 min | Partial | Low |
| Sector 32 | ~25 min | Emerging | Very low |
For our full sector-wise pricing breakdown, see Yamuna Expressway Property Rates 2026.
Connectivity from Sector 22D
- Noida International Airport (Jewar): ~10 minutes via YEW
- Pari Chowk (Greater Noida): ~20 minutes
- Noida Sector 18 / DND Flyway: ~35–40 minutes
- Film City Noida (Sector 21): ~5 minutes
- Jewar Toll Plaza: ~8 minutes
- Planned Metro Aqua Line extension: passes through the corridor (planned)
- Pod taxi corridor: planned link between Film City, airport and YEIDA sectors
How far is Sector 22D from Jewar Airport in kilometres?
Roughly 10 to 12 km by road — the ~10-minute figure above expressed as distance rather than time. That reading comes from the distance claims already published across our own and partner project pages and collected in our Jewar Airport distance guide; we publish it as a range because your exact plot and the service road you enter from move it by a kilometre either way. Our sector-by-sector corridor connectivity matrix reads the same stretch a little longer, at roughly 12 to 15 km, so treat anything inside that spread as the honest answer and check the live route for your own address before you rely on it. For the same drive measured against Delhi’s existing airport, see our Jewar versus IGI Delhi comparison.
What is the nearest metro station to Sector 22D?
There isn’t one — Sector 22D has no metro station today, and none adjacent to it. The nearest operating service is the Noida–Greater Noida Aqua Line, whose closest stations sit in the Greater Noida and Pari Chowk area: about a 20-minute drive from the sector, per the connectivity list above. That is a road connection to a metro, not a metro connection — a real difference if you were picturing a walk to a platform.
Three planned links are meant to change that, and each is worth understanding at its actual stage rather than its brochure stage. The Aqua Line extension toward Noida International Airport is planned through the YEIDA corridor, and a pod taxi link between Film City, the airport and the YEIDA sectors is planned alongside it. Separately, the Ghaziabad–Jewar rapid-rail (RRTS) extension is at planning and DPR-revision stage — not approved, not under construction. Planned and under construction are not the same thing, and on this corridor the difference has historically been measured in years. Our confirmed-timeline versus broker-hype breakdown keeps each of these tagged and dated. If a sales pitch tells you the metro is coming to Sector 22D, ask which line, at which stage, with which approval — and buy on the road access that exists today, not the rail that might.
What you get for your money in Sector 22D
Launch-stage pricing in Sector 22D for premium, listed-developer projects sits around ₹9,300–₹9,500/sq.ft (BSP). That's notably lower than comparable pre-airport pricing seen in Devanahalli (Bengaluru) or Shamshabad (Hyderabad) at similar stages of airport development.
“A 3 BHK in Sector 22D at this pricing works out to ₹1.3–1.8 crore all-in — below the NCR premium-apartment median, despite being closer to a major airport than Gurugram or South Delhi.”
Eldeco Echoes of Eden — the flagship Sector 22D launch
Among launched projects in Sector 22D, Eldeco Echoes of Eden is the clear benchmark. Three reasons:
- Developer quality: Eldeco is NSE/BSE listed with ~50+ years and 35,000+ delivered units. See our Eldeco Group review.
- Specification: VRV air conditioning, modular kitchens, branded fittings across all configurations — see the full floor-plan set. Details in our VRV AC apartments guide.
- Pricing & plan: launch BSP of ₹9,300/sq.ft* with a 30:40:30 construction-linked payment plan. Full breakdown in Eldeco EOE Price List & Floor Plans 2026; before booking, walk through the RERA verification steps.
Which Sector 22D projects can you actually book today?
Eldeco Echoes of Eden is the Sector 22D project we can confirm as open for booking today, based on its own published status and UP-RERA filings. Gaur Alaris closed Phase 1 bookings on 1 September 2026. The sector's earlier Gaur Chrysalis Phase 1 is reported sold out, and Gaur Alaris is the RERA-registered continuation of what was marketed pre-registration as Gaur Plume.
| Project | UP-RERA | Status | Configuration | BSP |
|---|---|---|---|---|
| Eldeco Echoes of Eden | UPRERAPRJ125342/02/2026 | Bookable | 3 BHK+ (2 BHK sold out) | ₹9,300/sq.ft* |
| Gaur Alaris | UPRERAPRJ950965/07/2026 | Bookings closed 1 Sep 2026 | 3 BHK only — 1,550 & 1,950 sq.ft | ₹9,000/sq.ft (revised 23 Aug 2026) |
| Gaur Chrysalis Phase 1 | UPRERAPRJ622344/11/2025 | Reported sold out | — | — |
Gaur Alaris sits on Plot GH-13 in Sector 22D, promoted by Gaursons India Private Limited across 8 towers, with a RERA-filed possession date of 9 June 2031. The Gaurs sales desk reports more than 1,200 allotment cheques received as of 25 August 2026, and its basic sale price (BSP) moved to ₹9,000/sq.ft on 23 August 2026. Our full write-up lives on the Gaur Alaris (Gaur Plume) project page. The project keeps a separate reference site of its own, where the registration and the filed document set for Gaur Alaris are read page by page.
Eldeco’s Ballads of Bliss (UPRERAPRJ921261/05/2025) and Whispers of Wonder (UPRERAPRJ752382/09/2025) are also RERA-registered in Sector 22D; the table above covers only the projects whose current booking status we have confirmed directly, so ask our desk for a live read on the other two.
Gaur Alaris — at a glance
- Project
- Gaur Alaris (registered name; earlier called Gaur Plume and Gaur Chrysalis 2.0)
- Promoter
- Gaursons India Private Limited
- Location
- Plot GH-13, Sector 22D, Yamuna Expressway (YEIDA), Gautam Buddh Nagar, Uttar Pradesh
- UP-RERA
- UPRERAPRJ950965/07/2026, registered 28 July 2026
- Configurations
- 3 BHK only — 1,550 sq.ft and 1,950 sq.ft saleable area
- BSP
- ₹9,000/sq.ft — revised 23 August 2026
- Possession
- 9 June 2031, per the project’s own UP-RERA filing
- Towers
- 8
Facts on this card were last verified by the Vidastu Advisory desk on 25 August 2026. Vidastu Advisory is a UP-RERA registered agent, UPRERAAGT000309/01/2026, and is not the developer of Gaur Alaris.
Whichever project you're weighing, the registration number is the fastest way to confirm what's actually filed — check it directly on the UP-RERA portal before booking, regardless of what a sales conversation promises.
Want a site visit to Sector 22D?
We'll organise the drive, walk you through the master plan, and show the launch units at Eldeco Echoes of Eden.