The promise
What we will, and will not, do
This is a binding commitment, not a sales line. If we ever deviate, you have the founder’s personal email: [email protected].
We will
- Contact you by email first, always
- Call only after you’ve asked us to
- Call at a Gulf-friendly hour (or your stated timezone)
- Send weekly WhatsApp video updates during the build
- Show proof (RERA reg, title docs) before you pay anything
- Name every fee upfront; no hidden charges
- Let you video-call the named builders at any stage
We will not
- Cold-call your Gulf or international mobile
- Add you to WhatsApp broadcast groups without consent
- Pressure you with artificial deadlines or “last plot” urgency
- Hide builder fees, approval costs or any charge
- Offer an unverified plot or one with pending dues/litigation
- Make guarantees (returns, timelines) that we cannot keep
The journey
From first email to handover
Typical build timeline 5 to 8 months on site (design through to handover). Every stage has a checkpoint you see before the next payment leaves your account.
You reply to our email, or you find us
You make the first move, by replying to an email or by coming here directly. We do not call first. After your reply or form submission we send a single acknowledgement and arrange a no-obligation call at a time you specify.
Gulf-friendly evening IST · or your timezoneDiscovery call: no sales pressure
We learn your goal (investment, a family home, or both), your budget and your timeline. We share the verified YEIDA-corridor plot shortlist with dues/litigation checks already done. You ask everything; we answer straight. If it is not the right fit, we say so.
Video call: you see the team, not a call centreFEMA-compliant remote purchase (PoA route)
Once you pick a plot, your representative signs under a Special Power of Attorney, apostilled (Hague countries: USA, UK, Canada, EU) or consulate-attested (Gulf countries). Payment moves through your NRE/NRO/FCNR account via banking channels. We walk you through every document before it is signed.
Token → Agreement → Registration, all remotelyOptional turnkey build with milestone payments
We design your home over video (Vastu-aligned to your brief), then obtain plan sanctions and build. Each stage payment is matched to verified, photographed construction progress you see before the money leaves your account. Zero lump-sum up-front construction advance.
Weekly WhatsApp video walkthroughs throughoutHandover: keys and documents to your representative
Snag-free handover with a final video walkthrough, mutation, and all title documents passed to your representative. Typical build: 5 to 8 months on site from design to possession.
Final walkthrough video · documents · mutationRERA escrow on registered project builds: Under RERA, at least 70% of buyer funds for a registered project are held in a project-specific escrow account and drawn only against verified construction milestones. This is process protection and recourse, not an absolute completion guarantee. (Source: RERA Section 4(2)(l)(D).)
Why trust it
Why you can trust this
UP-RERA registered agent
Vidastu Developers Pvt. Ltd. is registered with the Uttar Pradesh Real Estate Regulatory Authority as a real-estate agent: UPRERAAGT000309/01/2026. Verify this directly at up-rera.in. RERA registration means the agent is accountable to a statutory regulator, not just market reputation.
Plots verified before we offer them
Every plot in our shortlist is checked for clear title, outstanding dues, and pending litigation before we show it to you. If a plot does not clear those checks, it does not appear in our shortlist. We will share the allotment letter and relevant documentation with you before you commit a rupee.
Named, video-callable team
You are not dealing with a call centre. You can video-call the people who will build your home, before you sign anything.
Director
Vidit Kaushik
BITS Pilani, civil engineer. Leads the NRI desk and design-build. The person on your video calls.
Director · since 2000
Ravi Shankar Sharma
Greater Noida real estate and Vastu. Plots are checked by him before you see them.
4.8 across 58 Google reviews as on 6 October 2026
Verify them directly; we link straight to Google. See all 58 reviews →
FAQ
Frequently asked questions
Will you cold-call my Gulf mobile?
What does “consent-first” mean in practice?
How do you keep me updated on construction progress from abroad?
How is my money protected during the build?
Ready to begin?
Fill in the form, we’ll email you first, then call when you ask.
- A verified YEIDA-corridor plot shortlist
- Indicative plot + build cost in your currency
- A video call with the founder, no obligation
- We call at a Gulf-friendly hour, or whenever you specify
Thank you, we’ve got it.
We’ll reply by email first. If you’d like to speak sooner, WhatsApp +91 98114 05300; we’re here.
Vidastu NRI: explore