Home · Projects · Eldeco Echoes of Eden

Now advising · Sector 22D, Yamuna Expressway

Eldeco Echoes of Eden independent review & Vastu read.

Ledger note, 10 August 2026: Eldeco's official creative announces an Independence Weekend Carnival at the Sector 22D Sales Gallery (15–16 August, 11 AM onwards) with a 2x* booking-amount offer valid till 16 August (capped at ₹2 lakh, T&C per developer) and states the project "starting ₹1.45 Cr*" — the developer's stated figure alongside the unchanged ₹9,300/sq.ft* band.

Eldeco Echoes of Eden (EOE) is a RERA-registered (UPRERAPRJ125342/02/2026) pre-launch premium residential project by Eldeco Sohna Projects Limited at Sector 22D, Yamuna Expressway, Greater Noida. Three 32-storey towers (Haven, Elysian, Caelum) on a 5-acre, 558-unit site with VRV centralised AC, ~15 minutes from Noida International Airport (Jewar). Haven and Elysian are fully booked; current availability is in Caelum tower only. 3/4 BHK from ₹1.45 Cr (1,550 sq.ft 3 BHK; 2 BHK is sold out) at the current BSP ₹9,300/sq.ft on super area (as of July 2026). Possession target January 2031 (per RERA filing). Booking is direct — up to 10% of BSP (Sec-13 cap), no separate EOI.

₹1.45 Cr*3 BHK start
3 × 32Floors / towers
558Total units
80%Open green
CaelumOnly tower available

4.8★ / 60 Google reviews · UP-RERA agent UPRERAAGT000309/01/2026 · CIN U68200UP2023PTC192378

Direct answer

Eldeco Echoes of Eden is priced at ₹9,300/sq.ft* — base selling price on super area, current as of July 2026 — which puts the entry 3 BHK + 2T of 1,550 sq.ft from about ₹1.44 Cr*, against the ₹1.45 Cr* start stated on the developer’s own August 2026 creative. Add GST, preferred-location charges, parking, club, IFMS, stamp duty and registration and the realistic all-in lands indicatively around ₹11,000/sq.ft — the worked example is further down this page. Our review in one line: the RERA registration on file at launch, VRV air-conditioning in every home and a ten-to-fifteen minute drive to the Jewar terminal are what carry the case, and the January 2031 possession date is the part you have to be genuinely comfortable with before you sign.

Eldeco Echoes of Eden (EOE) is a premium 3/4 BHK VRV-air-conditioned residential project by Eldeco Group at Sector 22D, Yamuna Expressway, Greater Noida. UP RERA registered (UPRERAPRJ125342/02/2026). Three towers, 32 floors, 558 units, 80% open green space, 75,000 sqft clubhouse, 3-acre central greens. Haven and Elysian are fully booked — current availability is in Caelum tower only, and the 2 BHK is sold out. 3 BHK from ₹1.45 Cr* (current BSP ₹9,300/sq.ft, as of July 2026; all-in cost indicatively ~₹11,000/sq.ft); 30:40:30 construction-linked payment plan; booking is direct (up to 10% of BSP, no separate EOI). Channel partner: Vidastu Advisory (UPRERAAGT000309/01/2026, our sister brand). This page carries Vidastu Developers’ independent review including Vastu analysis (unique angle), structural notes, and buyer-advisory framing. For the deepest project coverage including price-list calculator and 40+ blog posts, see eldecoeoe.com. Eldeco’s own official August 2026 films — the Caelum tower opening, with the full site plan — are shown unedited at eldecoeoe.com/eldeco-eoe-videos.

₹1.45 Cr*
3 BHK Start
3 × 32
Floors / Towers
558
Total Units
80%
Open Green
15 min
to Jewar Airport
12 min
to Film City
75K sqft
Clubhouse
VRV
Centralised AC
Caelum
Only Tower Available

What is the Eldeco EOE RERA number?

RERA number: UPRERAPRJ125342/02/2026. Developer: Eldeco Sohna Projects Limited (Eldeco Group). Verifiable on up-rera.in/projects — search by project name or registration number. The registration covers all three towers (Haven, Elysian, Caelum); as of July 2026, Haven and Elysian are fully booked and the 2 BHK is sold out project-wide, so current availability is 3/4 BHK in Caelum tower only. RERA registration mandates: (a) 70% of buyer collections held in an escrow account, (b) quarterly construction progress reports, (c) delivery by January 2031 or penalty under RERA Act 2016. Always verify the RERA portal directly before any payment — the registration number, developer entity, and escrow account status are all published there. The project's public register file — every field of UPRERAPRJ125342/02/2026, as filed — stays current on our register-readout site at upreratracker.com.

When is Eldeco EOE possession?

RERA-registered possession date: January 2031 (per UPRERAPRJ125342/02/2026). With the standard 6-month RERA grace period, the effective possession window extends to mid-2031. The registration covers all 558 units across three towers — Haven, Elysian and Caelum, each Basement + Stilt + 32 floors. Construction mobilisation and foundation/piling work were underway as of May 2026. Vidastu Developers recommends buyers plan for a 5-year horizon from a 2026 booking date and verify the current completion field on the UP RERA portal before signing the agreement to sell.

Why Vidastu Developers features Eldeco EOE

We feature exactly three Yamuna Expressway / Greater Noida projects on this site — Gaur Yamuna Expressway, SKA Destiny One, and Eldeco Echoes of Eden. EOE is on the shortlist for four reasons:

  1. UP RERA registration is on file. UPRERAPRJ125342/02/2026 — verifiable on up-rera.in/projects. Many Sector 22D / YEIDA pre-launches do not carry RERA at the time of selling EOI; EOE does.
  2. Eldeco Group’s delivery record. Eldeco Sohna Projects Limited (the developer) is part of the Eldeco Group, which has multiple delivered residential projects across NCR and tier-2 markets. Lower delivery risk than first-time developers.
  3. VRV centralised air conditioning across all units. Most YEIDA-corridor pre-launches sell window/split provisions only. EOE includes VRV from day one — meaningful for both end-use comfort and resale narrative.
  4. 80% open green space. Boutique density (3 towers, 558 units) versus the high-density schemes around it. Better light, lower lift wait times, fewer maintenance compromises.

Vastu analysis of EOE units (unique to Vidastu)

This is the section you won’t find elsewhere. Shri Ravi Shankar Sharma — our co-founder and senior Vastu consultant — has reviewed the standard 3 BHK and 4 BHK floor plates of Eldeco EOE. Summary observations:

3 BHK + 2T Vastu summary (1,550 sqft floor plate)

Best units to ask for: East-facing and North-East-facing units offer the most balanced Vastu profile (entry direction, kitchen placement, master-bedroom corner). Acceptable with caveats: South-facing units are workable with specific entrance-threshold adjustments. Ask twice before booking: South-West-corner-facing units; SW corner Vastu requires careful interpretation in apartment layouts.

4 BHK Penthouse Vastu summary (2,700 sqft duplex floor plate)

Best units to ask for: North-East-facing and corner units with two-side openings. Note on master bedroom: the standard 4 BHK puts the master bedroom in the South-West, which is Vastu-positive — confirm tower-direction so the SW positioning aligns to the actual cardinal direction (not just the “labeled” plan direction).

Important: the above is general guidance from a floor-plate review. Unit-specific Vastu (your shortlisted tower, floor, direction) requires an on-site Vastu visit. Book a Property Vaastu pre-purchase audit (₹10,999) before you book, for unit-specific recommendations.

Structural & quality notes (Civil Engineer’s perspective)

Vidit Kaushik, our founder, holds a Civil Engineering degree from BITS Pilani. Notes from his structural review of EOE:

Eldeco EOE vs. Gaur Yamuna Expressway — same sector, different bet

Both EOE and Gaur YEW are at Sector 22D. We sell both. Here’s how we frame the choice for buyers:

Eldeco Echoes of EdenGaur Yamuna Expressway
Configuration3 / 4 BHK (2 BHK sold out)3 / 4 BHK
3 BHK starting₹1.45 Cr*₹1.62 Cr*
RERAUPRERAPRJ125342/02/2026 ✓Verify on portal
Towers3 (32 floors) — Caelum only available7 (S+34)
Total units558952
AC systemVRV centralisedTower-mounted
Clubhouse75,000 sqft1,00,000 sqft
Open green space80%~50–60%
DensityLower (boutique)Higher (scale)
BookingDirect, ≤10% of BSP — no EOI₹10 lakhs
Best forLower-density premium, VRV-AC, lower entry priceScale, larger clubhouse, more amenity bandwidth

If you’re optimising for lower density and centralised cooling, EOE wins. If you want maximum amenity scale and a 952-unit community, Gaur wins. Both are legitimately good — the right answer depends on what you’ll actually use day-to-day. See Gaur Alaris (formerly Codename Plume, Gaurs, Sector 22D) →

What is the Eldeco EOE price in 2026?

Eldeco EOE launched at a BSP of ₹8,999/sq ft on super area — ₹1.39 Cr entry for the 3 BHK + 2T (1,550 sq ft). The sheet current at the time of writing (July 2026) runs at ₹9,300/sq.ft: 3 BHK + 2T from ₹1.45 Cr*, 3 BHK + 3T from ₹1.72 Cr*, 4 BHK Penthouse from ₹2.51 Cr*. The next band is ₹10,999/sq.ft*, which our sales desk expects around 23 August 2026 (stated 17 August) — applicable to Caelum tower only (Haven and Elysian are fully booked). The 2 BHK + 2T is sold out project-wide (reference pricing ~₹1.16 Cr* at the current BSP). Final per-unit pricing depends on floor band, direction, and PLC (preferential location charges). Booking is direct — up to 10% of BSP (Sec-13 statutory cap), no separate EOI. All-in cost including GST (5%), PLC, parking, club membership, IFMS, UP stamp duty (~5.6%), and registration typically lands around ₹11,000/sq.ft indicative. Price sheets move — confirm the live sheet on WhatsApp.

Get the live per-unit price sheet

3 BHK options · 4 BHK options · floor-by-floor BSP · PLC table · 30:40:30 plan with milestone amounts. Vidit sends the sheet on WhatsApp within 5 minutes (office hours).

Payment plan: 30:40:30 construction-linked. Booking is direct — up to 10% of BSP (the Sec-13(1) statutory cap), no separate EOI step; the allotment letter follows, and the remaining booking-phase amount tops up to 30% within ~90 days (agreement to sell). 40% then falls across construction milestones, 30% at possession. This is a standard CLP — Eldeco does not currently push a “subvention” or “no EMI till possession” plan on this project (which we view positively; subvention-heavy plans usually price the cost of carry into the BSP).

For a working EMI calculator with all five preset configurations and an interactive payment-plan visualiser, see eldecoeoe.com/blog/eldeco-eoe-emi-calculator-payment-plan.

Buyer profile fit (who EOE is for, who it isn’t)

Buyer profileEOE fitWhy
End-user, 3+ year horizon✓ Strong fitVRV-AC + lower density + RERA-registered = good move-in experience
Investor, 5–7 year hold✓ Strong fitSector 22D capital appreciation tied to Jewar + Film City; Eldeco brand resale premium
NRI investor✓ Good fitRERA on file, Eldeco brand recognition, FEMA-compliant payment routes available
Investor needing rental yield from Day 1✗ SkipPre-launch — possession is 3+ years out. For rental yield now, look at delivered Greater Noida options.
End-user needing immediate possession✗ SkipPre-launch construction-linked timeline. Look at SKA Destiny One or other delivered projects.
Buyer with <₹1.4 Cr budget✗ Re-frameBelow the entry 3 BHK ticket (2 BHK is sold out). Consider YEIDA plot at ₹1.30–₹1.65 Cr (Sector 22D) for self-construction.

Are Eldeco EOE floor plans available?

Yes — floor plans are available for every Eldeco EOE configuration: 2 BHK+2T (1,250 sqft, sold out), 3 BHK+2T (1,550 sqft), 3 BHK+3T (1,850 sqft), 4 BHK Penthouse (2,700 sqft), and 4 BHK Grand Penthouse (3,150 sqft) — all super built-up area, all VRV air-conditioned. We share the full floor-plan set on WhatsApp on request — use the form below. Current availability (as of July 2026) is 3/4 BHK in Caelum tower only — Haven and Elysian are fully booked. The table below uses super built-up areas; always verify RERA carpet area from the UP RERA portal (UPRERAPRJ125342/02/2026) before booking. For brochure PDFs and downloadable floor plans, see eldecoeoe.com/eldeco-eoe-floor-plan — the official channel-partner site for booking and full-project documentation.

ConfigurationSuper BUA (sqft)RERA Carpet (approx.)Current BSPEntry Price*
2 BHK + 2T1,250 sqft700.31 sqft₹9,300/sqftSold Out (~₹1.16 Cr ref.)
3 BHK + 2T1,550 sqft870.70 sqft₹9,300/sqft~₹1.45 Cr*
3 BHK + 3T1,850 sqft1,056.81 sqft₹9,300/sqft~₹1.72 Cr*
4 BHK Penthouse (duplex)2,700 sqft1,558.39 + 403.96 terrace₹9,300/sqft~₹2.51 Cr*
4 BHK Grand Penthouse3,150 sqft1,819.20 + 604.93 terrace₹9,300/sqft~₹2.93 Cr*

*BSP only, current rate as of July 2026 (the launch-era rate was ₹8,999/sqft). Add GST (5%), PLC, parking, club, IFMS, stamp duty, and registration for all-in cost — indicatively ~₹11,000/sq.ft all-in. Exact carpet area from RERA. Get live per-unit pricing from Vidit.

What is the difference between EOE’s super area, built-up area and carpet area?

On the 1,550 sq.ft 3 BHK you are billed for 1,550 sq.ft of super area, but the developer’s own area table puts built-up at 1,193.73 sq.ft, RERA carpet at 870.70 sq.ft and the balconies at 218.40 sq.ft. Those four numbers describe the same home, and the gap between the first and the third is the single most misread thing in an Indian apartment purchase. The table below is the full breakdown for both 3 BHK types, transcribed from the Eldeco sales deck’s area sheets.

ConfigurationSuper area (billed)Built-up areaRERA carpetBalcony area
3 BHK + 2T1,550 sqft1,193.73 sqft870.70 sqft218.40 sqft
3 BHK + 3T1,850 sqft1,492.73 sqft1,056.81 sqft326.40 sqft

Read left to right, the three areas answer three different questions. Super area is what the price is calculated on: your home plus your share of lobbies, staircases, lifts and the clubhouse. Built-up area is the home itself including its own walls and balconies. RERA carpet is the floor you can actually lay a carpet on, measured to the inner walls, and it is the only one of the three defined in law — which is why it is the figure that must appear in your agreement to sell. Balcony area is stated separately because RERA excludes it from carpet even though you use it every day; on the 3 BHK + 2T that is a genuine 218 sq.ft, with every balcony drawn at five feet wide.

The practical use of this table is comparison. When a competing project quotes you a price per square foot, ask which area it is calculated on before you compare it with EOE’s ₹9,300 — a rate quoted on carpet and a rate quoted on super area are not the same currency, and the carpet figure here is roughly 44 per cent smaller than the super figure. Areas are transcribed from the developer’s sales deck; confirm the exact figures for your specific unit against the RERA filing (UPRERAPRJ125342/02/2026) before you sign anything.

Eldeco EOE 2 BHK — sold out; what to consider now

The 2 BHK + 2T (1,250 sqft super BUA, RERA carpet 700.31 sqft) is sold out project-wide as of July 2026. Reference pricing at the current BSP of ₹9,300/sq.ft would be approximately ₹1.16 Cr*. Buyers who wanted the compact configuration should now look at the 3 BHK + 2T (1,550 sqft) at ₹1.45 Cr* in Caelum tower — the current entry home — or consider a YEIDA plot for self-construction at a lower ticket. Key points for buyers evaluating EOE now:

Brochure & floor plan downloads

The official Eldeco EOE brochure and floor plan PDFs for all five configurations — 2 BHK (sold out, reference only), 3 BHK+2T, 3 BHK+3T, 4 BHK Penthouse, and 4 BHK Grand Penthouse — plus the master site plan, are available at eldecoeoe.com/eldeco-eoe-floor-plan. That site (operated by Vidastu Advisory, our RERA-registered sister brand) also carries the live payment plan calculator and handles the booking process. For direct WhatsApp delivery, use the form below.

Three towers: Haven, Elysian & Caelum

Eldeco Echoes of Eden has three named towers, each 32 floors. As of July 2026, Haven and Elysian are fully booked — current availability is in Caelum tower only. Tower selection affects your facing direction, PLC, and resale narrative.

Haven (Tower A)Elysian (Tower B)Caelum (Tower C)
Floors323232
Primary facingEast / North-EastNorth / North-WestWest / South-West
Vastu preferred?Was best (East/NE)Was good (North)Ask before booking (SW facing)
AvailabilityFully booked — no new bookingsFully booked — no new bookingsAvailable — current tower
Configs open3/4 BHK (2 BHK sold out project-wide)
Central green viewYes (inner-facing floors)YesYes (upper floors best)

For a full tower-by-floor availability matrix and facing direction detail, see EOE tower comparison guide at eldecoeoe.com.

Amenities — Eldeco Echoes of Eden

Eldeco EOE’s 75,000 sqft clubhouse includes a swimming pool, gymnasium, squash court, two badminton courts, tennis court, basketball court, yoga deck, amphitheatre, banquet hall, business centre, kids’ play zone, and senior citizen corner. Landscape: 3-acre central greens, jogging track, cycling path, reflexology path, and three themed gardens. VRV air-conditioning is centralised across all apartments. At 75,000 sqft for 558 units, EOE’s ratio is ~134 sqft of clubhouse per unit — well above the corridor average of ~80–100 sqft/unit.

Sports

Swimming pool · Gymnasium · Squash · Badminton (×2) · Tennis · Basketball

Wellness

Yoga deck · Meditation pavilion · Reflexology path · Senior corner · Jogging track

Social

Banquet hall · Amphitheatre · Party lawn · Business centre · Indoor games

Kids

Play area · Toddler zone · Creche room · Activity lawn

Landscape

3-acre central greens · Cycling path · Themed gardens (×3) · Ornamental water feature

Technology

VRV AC (all units) · Video door phone · EV charging points · CCTV perimeter

Where is Eldeco EOE located?

Eldeco EOE is at Sector 22D, Yamuna Expressway, Greater Noida (PIN 203207) — about 10 minutes’ expressway drive from Noida International Airport, Jewar, which has been operational since June 2026. Allow 15–20 minutes gate-to-terminal for the ~15–18 km run; the proposed Film City is ~8–10 km / 10–12 minutes away and Pari Chowk ~7 km / 8–10 minutes. The site is on the Yamuna Expressway belt between the YEIDA plots zone and established Greater Noida commercial areas — one of the most infrastructure-active corridors in north India right now. For the sector-level deep dive (land-use plan, appreciation drivers, plot rates), read our Sector 22D Yamuna Expressway guide.

DestinationDistanceApprox. timeRoute
Noida International Airport, Jewar~15–18 km15–20 minYamuna Expressway
Proposed Film City (Sector 21)~8–10 km10–12 minYamuna Expressway
Pari Chowk (Greater Noida centre)~7 km8–10 minvia Kulesara Road
Sector 18 Noida (commercial)~32 km30–35 minYamuna + DND
Connaught Place, Delhi~55 km50–60 minYamuna Expressway + NH48
Botanical Garden Metro (nearest)~25 km30 min + metrovia Noida road
F1 Track (Buddh International Circuit)~12 km12 minYamuna Expressway
Yamuna Expressway Toll (Sector 18)~2 km3 minExpressway
Proposed YEIDA Metro Station~1.5–3 km (planned)5 min (when operational)YEIDA Phase 2 metro
Why Sector 22D specifically?

Sector 22D sits at the intersection of three infrastructure bets: (1) Jewar Airport’s Phase 1 growth zone, (2) the proposed Film City plot, and (3) the YEIDA metro extension alignment. Of the three, Jewar Airport is the highest-certainty driver — it is no longer a bet at all: the airport is operational, with commercial flights since June 2026. The Film City and metro are policy-risk items. A buyer in Sector 22D is primarily betting on Jewar; the Film City and metro are upside optionality.

What is the Eldeco EOE payment plan?

Eldeco EOE uses a 30:40:30 Construction-Linked Plan (CLP): 30% at booking/agreement, 40% across four construction milestones, 30% at possession. Plan structures vary by tower and slab stage at booking — the typical corridor structure is a booking amount plus time-linked slab instalments — so the exact milestone schedule is shared from the current price sheet, on request, in writing. Unlike subvention plans (common at nearby projects), this CLP does not embed carry costs into the BSP — Vidastu considers this a positive signal for the developer’s balance sheet discipline.

Stage% of BSPOn 3 BHK @ ₹1.45 CrTrigger
Direct booking (no EOI)10%₹14.5 lakhOn signing — Sec-13 statutory cap, allotment letter follows
Agreement to Sell20%₹29 lakhWithin 45 days of booking
Construction milestones (×4)40% (10% each)₹14.5 lakh × 4Plinth · Slab 10 · Slab 20 · Slab 30
Possession30%₹43.5 lakhOn OC + completion certificate

Key RERA protection: 70% of all receipts go into a RERA-mandated escrow account (Section 4(2)(l)(D) of the RERA Act 2016). Drawdowns from escrow are certified against completion milestones. This applies to all RERA-registered projects including EOE.

All-in cost sample — Eldeco EOE 3 BHK

The table below shows a worked example for a standard 3 BHK + 2T at entry floor, mid-facing. This is illustrative — exact figures depend on tower, floor band, and direction chosen.

Cost headBasisAmount (approx.)
Base price (BSP)1,550 sqft × ₹9,300₹1,44,15,000
GST (5%)5% of BSP (under-construction)₹7,20,750
Preferential Location ChargeFloor / direction (varies)₹50,000–₹2,50,000
Car parking (1 covered)As per builder₹2,00,000
Club membershipOne-time₹75,000
IFMS (Interest Free Maintenance)Advance corpus₹50,000
Power backup chargesPer kW₹25,000–₹50,000
UP Stamp duty (5% + 1% surcharge)On agreement value~₹8,07,000
Registration feesUP rates~₹25,000
Legal / advocate chargesEstimated₹25,000–₹50,000
Total all-in (estimated, ~₹11,000/sq.ft indicative)₹1.65 Cr – ₹1.85 Cr

Use the interactive total-cost calculator at eldecoeoe.com →

Official Eldeco launch creatives (May 2026)

Three official Eldeco creatives released for the May 2026 EOI window, plus a 25-second launch teaser:

Eldeco Echoes of Eden — Where peace doesn't pass through, it stays. Official peacock-themed creative for 3 BR VRV AC homes at launch BSP ₹8,999/sq.ft (since revised to ₹9,300/sq.ft), Sector 22D Yamuna Expressway.
Peace · peacock motif
Eldeco Echoes of Eden — Strategically located near Noida International Airport (Jewar). Official Eldeco Yamuna Expressway aerial creative for Sector 22D 3 BR VRV homes.
Connectivity · Jewar Airport
25s launch teaser · video

Construction status — May 2026

Eldeco Echoes of Eden — three 32-storey towers at Sector 22D, Yamuna Expressway, Greater Noida. Site photo May 2026.
Eldeco Echoes of Eden — three towers at Sector 22D, Yamuna Expressway. Site photo, May 2026.
Current status: Site mobilisation & foundation work

As of May 2026, Eldeco EOE is in active site mobilisation phase. Foundation / piling work is in early stages. RERA registration (UPRERAPRJ125342/02/2026) is on file. Possession target: January 2031 (per RERA filing), with the standard 6-month grace period. Vidastu Developers does site visits every Wednesday — call Vidit to join the next visit.

See detailed May 2026 construction update → | April 2026 update →

Yamuna Expressway apartments — the 2026 context

Eldeco EOE is one of approximately 12 active apartment pre-launches along the Yamuna Expressway corridor as of mid-2026. It sits in a competitive field that includes Gaur Yamuna Expressway (Sector 22D), ATS Allure (Sector 22D), Migsun Atharva (Sector 21), and Supertech Up Country (Sector 17). Here’s how EOE ranks:

Cross-references & deeper reading

Eldeco EOE has its own dedicated landing site at eldecoeoe.com, operated by our sister brand Vidastu Advisory (UP RERA Agent UPRERAAGT000309/01/2026) — the official channel partner for Eldeco Echoes of Eden. The deepest content on EOE on the internet lives there:

FAQ

What is the RERA number for Eldeco Echoes of Eden?
UPRERAPRJ125342/02/2026 — verifiable on up-rera.in/projects. The developer is Eldeco Sohna Projects Limited, a part of the Eldeco Group.
What is the starting price of Eldeco EOE 3 BHK?
₹1.45 Cr* for the entry 3 BHK + 2T, at the current BSP of ₹9,300/sq.ft (as of July 2026), applicable to Caelum tower — Haven and Elysian are fully booked. Final pricing depends on floor, direction, and PLC. Talk to Vidit (+91 95404 45300) for the current per-unit price sheet.
How does Eldeco EOE compare to Codename Plume by Gaurs?
Same sector, different stage. Eldeco EOE: 3 towers of 32 floors, 558 units, VRV centralised AC, 80% open green, 3 BHK from ₹1.45 Cr* (Caelum tower only — Haven and Elysian are fully booked) — RERA registered. Gaur Alaris (Gaurs, formerly Codename Plume): 8 towers, peacock theme, ~85,000 sq ft clubhouse + 15,000 sq ft terrace, 3 BHK only (1,550 & 1,950 sq.ft), RERA-registered UPRERAPRJ950965/07/2026, BSP ₹9,000/sq.ft*. See Gaur Alaris review →
Has Vidastu Developers conducted Vastu analysis of EOE?
Yes. Shri Ravi Shankar Sharma, our co-founder and senior Vastu consultant, has reviewed the standard 3 BHK and 4 BHK floor plates. Direction-wise unit recommendations are summarised on this page. For unit-specific guidance, book a Property Vaastu pre-purchase audit (₹10,999) before you book.
Is Eldeco EOE a good investment in 2026?
For buyers with a 4–7 year horizon: yes — Sector 22D Yamuna Expressway is positioned for capital appreciation tied to Jewar Airport (operational) and Film City (planned — not yet built). For buyers needing immediate possession or rental yield from Day 1: skip the pre-launch and consider delivered Greater Noida options. See the buyer-profile-fit table above.
What is the relationship between vidastu.com and eldecoeoe.com?
Both are operated by Vidit Kaushik. vidastu.com is Vidastu Developers Pvt. Ltd. — multi-project consultancy and builder since 2012. eldecoeoe.com is Vidastu Advisory — UP RERA-registered channel partner (UPRERAAGT000309/01/2026) dedicated to Eldeco Echoes of Eden. Same office, same Vidit Kaushik on calls, separate brands.
How do I book Eldeco EOE through Vidastu?
Three steps: (1) WhatsApp with your configuration preference (3/4 BHK — 2 BHK is sold out), budget, and timeline; (2) we send the live per-unit price sheet and arrange a site visit; (3) direct booking of up to 10% of BSP (the Sec-13(1) statutory cap) — there is no separate EOI step; the allotment letter follows. Vidastu’s brokerage is disclosed in writing before any payment.
What are the three towers in Eldeco Echoes of Eden?
The three towers are Haven (Tower A), Elysian (Tower B), and Caelum (Tower C). All three are 32 floors. As of July 2026, Haven and Elysian are fully booked — current availability is in Caelum only. Full tower comparison at eldecoeoe.com.
What is the carpet area of Eldeco EOE 3 BHK?
The 3 BHK + 2T has a super BUA of 1,550 sqft and RERA carpet area of 870.70 sqft. The 3 BHK + 3T variant is 1,850 sqft super / 1,056.81 sqft carpet. Always confirm carpet area from the UP RERA portal (UPRERAPRJ125342/02/2026) — the RERA disclosure is the legally binding figure.
What is the possession date for Eldeco Echoes of Eden?
RERA-registered possession target: January 2031 (per UPRERAPRJ125342/02/2026). With the standard 6-month RERA grace period, the effective window extends to mid-2031. Vidastu Developers recommends buyers plan for a horizon to 2031 from the 2026 booking date. Construction mobilisation was underway as of May 2026.
What is the GST on Eldeco Echoes of Eden?
5% GST applies (without Input Tax Credit) on under-construction residential properties per the 2019 GST Council circular. On a 3 BHK at ₹1.45 Cr BSP, GST is approximately ₹7.25 lakh. GST is paid at each construction milestone, proportionally. Post-OC (ready-to-move-in) properties attract no GST — but EOE is pre-launch and GST applies throughout the CLP period.
What is UP stamp duty and registration on Eldeco EOE?
UP stamp duty is 5% of the agreement value + 1% surcharge = approximately 5.6% effective rate. On a ₹1.45 Cr agreement value, stamp duty is approximately ₹8.12 lakh. Registration fees are approximately ₹25,000–₹30,000. Women co-owners may be eligible for 1% stamp duty concession in UP — verify with your advocate.
Is Eldeco EOE the same as Eldeco WOW (Whispers of Wonder)?
No — they are two separate, independently RERA-registered Eldeco Group projects on adjacent Sector 22D plots, sharing the same promoter (Eldeco Sohna Projects Limited). EOE is registered under UPRERAPRJ125342/02/2026; Whispers of Wonder has its own registration, UPRERAPRJ752382/09/2025 (registered 2 September 2025). WOW is not an earlier marketing name for EOE — an earlier version of this page repeated that unverified claim; we corrected it after checking both filings on the UP RERA portal. Verify each number separately on up-rera.in; our sales desk represents EOE only. Full disambiguation: vidastu.com/blog/eldeco-eoe-vs-wow-whispers-of-wonder.
Can NRIs buy Eldeco Echoes of Eden?
Yes. NRIs and PIOs can purchase Eldeco EOE under FEMA (Foreign Exchange Management Act) Regulation 21(2). Residential property purchase by NRI/PIO is generally permitted without RBI approval. Payment must be through normal banking channels from NRE/NRO accounts. GST, stamp duty, and registration charges apply equally. Vidastu Developers has handled NRI transactions — call Vidit for NRI-specific documentation requirements.
How do I verify Eldeco EOE’s RERA registration?
Visit up-rera.in/projects → search project name “Eldeco Echoes of Eden” or registration number UPRERAPRJ125342/02/2026. You can verify: project details, developer name (Eldeco Sohna Projects Limited), floor plans, layout plan, RERA escrow account status, and quarterly progress reports. Step-by-step verification guide at eldecoeoe.com.
What is the price of Eldeco Echoes of Eden 2 BHK?
The 2 BHK + 2T (1,250 sqft super BUA) is sold out project-wide as of July 2026 — reference pricing at the current BSP of ₹9,300/sq.ft is approximately ₹1.16 Cr* (RERA carpet area 700.31 sqft). Available configurations now start at the 3 BHK + 2T from ₹1.45 Cr* in Caelum tower. Call (+91 95404 45300) for the live price sheet on available units.
Which floor is best to buy in Eldeco Echoes of Eden?
From a value-optimisation perspective: mid floors (10–20) offer the best balance of price (PLC is lower than top floors), lift access, and view. Top floors (21–30) attract the highest PLC but offer better green views and lower road noise. Lower floors (1–9) have the lowest PLC but may have limited view and more ground-level maintenance activity. From a Vastu perspective, floor selection matters less than the unit’s cardinal direction — prioritise facing direction over floor band.
Which tower is best in Eldeco Echoes of Eden — Haven, Elysian, or Caelum?
As of July 2026, Haven and Elysian are fully booked, so Caelum (Tower C) is the only tower with current availability — South-West facing units; ask our Vastu consultant before booking. Historically, Haven (East/North-East) was the Vastu-preferred choice and Elysian (North-facing) a close second, but neither is open for new bookings now. For investors focused purely on resale, tower choice is secondary to configuration and floor band.
Where can I download the Eldeco EOE brochure and floor plan PDFs?
Floor plan PDFs for all five configurations (2 BHK, 3 BHK+2T, 3 BHK+3T, 4 BHK Penthouse, 4 BHK Grand Penthouse) and the master site plan are available at eldecoeoe.com/eldeco-eoe-floor-plan. That site is operated by Vidastu Advisory (RERA Agent UPRERAAGT000309/01/2026), our sister brand and the official channel partner for EOE. You can also request floor plans directly on WhatsApp using the form below.
What floor plans does Eldeco Echoes of Eden offer?
Eldeco Echoes of Eden offers five configurations, all VRV air-conditioned: 2 BHK+2T (1,250 sqft, sold out), 3 BHK+2T (1,550 sqft), 3 BHK+3T (1,850 sqft), 4 BHK Penthouse (2,700 sqft), and 4 BHK Grand Penthouse (3,150 sqft) — all super built-up area. Current availability (as of July 2026) is in Caelum tower only; Haven and Elysian are fully booked.
Is Eldeco Echoes of Eden a good project — what does Vidastu’s review say?
This page is Vidastu Developers’ independent review of Eldeco EOE — not the developer’s own marketing site. Our verdict in short: RERA registration (UPRERAPRJ125342/02/2026) with mandated escrow protection, Eldeco Group’s multi-decade delivery record, VRV air-conditioning and 80% open green space are genuine positives; the trade-off is a January 2031 possession target, so it suits buyers with a 4–7 year horizon rather than those needing immediate possession or rental yield. Read the full written verdict — Full EOE review — alongside the Vastu analysis and Civil Engineer’s structural notes above before booking.
Where is Eldeco Echoes of Eden located, and what is the connectivity like?
Eldeco Echoes of Eden is at Sector 22D, Yamuna Expressway, Greater Noida (PIN 203207) — approximately 15–18 km / 15–20 minutes from Noida International Airport (Jewar), ~8–10 km / 10–12 minutes from the proposed Film City, and ~7 km / 8–10 minutes from Pari Chowk. The nearest operating metro is Botanical Garden (~25 km); a YEIDA Phase 2 metro station is proposed ~1.5–3 km away. See the full connectivity table above for every distance and route.
Is Eldeco Echoes of Eden in Sector 22D, Greater Noida?
Yes — Eldeco Echoes of Eden is located at Sector 22D, Yamuna Expressway, Greater Noida (PIN 203207), approximately 15–18 km / 15–20 minutes from Noida International Airport (Jewar).
Eldeco Echoes of Eden ka price kya hai?
Entry 3 BHK + 2T ki price abhi ₹1.45 Cr* se shuru hoti hai, current BSP ₹9,300/sq.ft (July 2026) par — yeh Caelum tower ke liye hai, kyunki Haven aur Elysian fully booked hain. 2 BHK + 2T project-wide sold out ho chuka hai. Final price aapke floor, direction aur PLC par depend karta hai. Live per-unit price sheet Vidit se WhatsApp par mangwa lijiye — +91 95404 45300.

Eldeco Echoes of Eden — complete reading list

Every angle on Eldeco EOE, written by the channel-partner and advisory team:

Full EOE review (vidastu.com)Our consultancy-side verdict EOE price list & floor plan 2026All configurations, BSP, carpet area EOE specifications & amenitiesComplete specs list EMI calculator & payment plan30:40:30 CLP amortisation Total cost calculatorBSP + GST + stamp duty + all charges RERA verification walkthrough8-step UP RERA portal guide Haven vs Elysian vs CaelumTower-by-tower comparison EOE vs Gaur Yamuna CitySame sector, different bets EOE vs ATS Sector 22DDetailed head-to-head EOE vs Migsun AtharvaYamuna Expressway comparison EOE vs WOW — same or different?Two separate RERA registrations, kept straight Possession date & construction statusRERA timeline, progress Construction update: May 2026Site mobilisation status Booking process: step-by-stepDirect booking to allotment to registration Is Eldeco EOE a scam? Due diligence8-point checklist, honest answer Brochure & floor plan downloadAll configurations in PDF Location & connectivity mapAll distances, routes, metro Akshaya Tritiya 2026 offerLaunch timing, special pricing EOE vs Solitairian CityYamuna corridor comparison Eldeco Group: developer reviewTrack record, financials, reputation
Cross-references
→ Eldeco EOE — official website (deepest coverage) → EOE facts & reference sheet → Gaur Alaris (formerly Gaur Plume / Codename Plume) review (same sector, RERA-registered) → Gulshan Empire review (Wave City, Ghaziabad) → Property Vaastu pre-purchase audit (₹10,999) → About Vidit Kaushik (founder, both brands) & Shri Ravi Shankar Sharma (co-founder)

Talk to the desk

Get the live price sheet, floor plans, or an honest read.

3 BHK / 4 BHK options, floor-by-floor BSP, the 30:40:30 payment plan, or the 2 BHK sold-out waitlist — tell us what you need and Vidit calls back directly. No call-centre, ever.

Call the desk · +91 95404 45300

Sent only to Vidastu Developers — same lead pipeline as eldecoeoe.com.

No spam — the desk that does the work calls you back.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

One direct line

Same Vidit. Two brands. One direct line.

Whether you reach out via vidastu.com or eldecoeoe.com, the call goes to Vidit Kaushik directly. He’ll route you to the project that actually fits — Eldeco EOE, Gulshan Empire, Codename Plume, or a YEIDA plot — and he’ll tell you when none of them do.

The desk also covers two more Eldeco Group projects in Greater Noida — separate promoters, separate RERA registrations: Eldeco La Vida Bella, Sector 12 Greater Noida West (full dossier) and Eldeco 7 Peaks Residences, Omicron 1A (floor plans & register record), with free visits bookable at bookeldeco.com.

Vidastu Developers Pvt. Ltd. — Greater Noida real estate consultancy and builder since 2012. Vidit Kaushik: +91 95404 45300. Sister brand: Vidastu Advisory (UPRERAAGT000309/01/2026, channel partner for Eldeco EOE). Sources: UP RERA · Eldeco Group · eldecoeoe.com facts. Not investment advice — past performance is not a guarantee, values can fall. All prices are BSP on super area at time of writing and subject to change; GST, PLC, IFMS, parking, stamp duty and registration are additional. Verify RERA, carpet area and current pricing on the UP RERA portal before paying anything.