Insights · Sector page · YEIDA Sector 22D

Sector 22D, Yamuna Expressway: what it is and where it sits

Sector 22D is a YEIDA residential sector on the Yamuna Expressway, in the residential belt near the airport end of the corridor, about 4 to 6 km from the planned Film City in Sector 21. Our UP-RERA directory lists 10 registrations whose filed name or address states Sector 22D (as on 2 November 2026), and our distances page puts the sector about 10 to 12 km, or 10 to 15 minutes, from Noida International Airport at Jewar. Other figures on this site run up to 15 to 16 km, and each one is shown below with its source.

Sources: our Jewar airport distances page (data verified 31 July 2026); our connectivity matrix (12 July 2026); our Sector 22D comparison (published 9 July 2026) and four-sector guide (updated 10 July 2026), which cites the YEIDA Residential Plots Brochure of 5 July 2024; our UP-RERA register directory (as on 2 November 2026); our airport timeline (16 July 2026), which cites Metro Rail Today (15 December 2025) on the RRTS. No prices appear on this page.

What Sector 22D is

Sector 22D is one of the residential sectors of the Yamuna Expressway Industrial Development Authority (YEIDA), in Gautam Buddh Nagar. It carries both group housing and individual YEIDA plots.

The group housing shows on the UP-RERA register. VVIP Yamuna’s filing, for example, gives its address as Plot No. GH-01B/2, Sector 22D. YEIDA itself registered a group housing plot there, GH06, Sec-22D, on 10 August 2017, and an affordable housing project in the sector the day before. Our directory lists 10 registrations whose own filed name or address states Sector 22D, as on 2 November 2026.

The plots come from YEIDA’s own schemes. Sector 22D was one of four sectors in YEIDA’s 2024 residual-plot scheme, RPS-08/2024, with Sectors 16, 18 and 20 (YEIDA Residential Plots Brochure, 5 July 2024). Our four-sector guide records it in the current RPS-10/2026 scheme as well.

Where Sector 22D sits: the schematic map

Sector 22D lies along the Yamuna Expressway, between Pari Chowk in Greater Noida and Noida International Airport at Jewar. It is part of the residential belt near the airport end of the expressway. Our connectivity matrix reads it at roughly 20 to 24 km from Pari Chowk and roughly 4 to 6 km from the planned Film City in Sector 21 (map-based, 12 July 2026).

Sector 22D, Yamuna Expressway: schematic map, not to scale A vertical line stands for the Yamuna Expressway. The top end points towards Pari Chowk, Greater Noida. The bottom end points towards Noida International Airport at Jewar. Along the line, in the order our Corridor Explorer uses, are Sector 18, Sector 20, Sector 22A, Sector 22D, which is highlighted, and the planned Film City in Sector 21. Not to scale. No boundaries are drawn. SCHEMATIC, NOT TO SCALE Towards Pari Chowk, Greater Noida Towards Noida International Airport, Jewar YAMUNA EXPRESSWAY Sector 18 YEIDA plot scheme on the register Sector 20 YEIDA plot scheme on the register Sector 22A 4 registrations Sector 22D 10 registrations · this page Film City, Sector 21 Planned concession, not housing
Schematic, not to scale. The order follows our Corridor Explorer, which itself simplifies the sector order, so read position as sequence along the corridor, not distance or direction. No plot or sector boundaries are drawn, and the side of the expressway each sector sits on is not shown. Film City is drawn hollow because it is planned, not built. Register counts: our UP-RERA directory as on 2 November 2026.

How far Sector 22D is from Jewar airport

Our Jewar airport distances page states Sector 22D at approximately 10 to 12 km, about 10 to 15 minutes by road. That makes it the closest origin on that page (data verified 31 July 2026).

Two other readings on this site run wider, and we show all three. Where our own pages disagree, plan on the longer figure.

SourceDistanceTimeTag
Our distances page, 31 Jul 2026About 10 to 12 kmAbout 10 to 15 minReported
Our connectivity matrix, 12 Jul 2026About 12 to 15 km, map-basedAbout 15 to 22 min off-peak, an estimateReported
Gaursons’ brochure, as recorded in our sector guide, Jul 202615 to 16 kmNot statedReported

None of these figures discloses a start point, route or time of day. The airport itself is confirmed: commercial flights began on 15 June 2026 (our airport timeline, 16 July 2026).

Registered projects in Sector 22D

The full list of registrations, each with its filing, is on our Sector 22D register directory. The projects this desk has reviewed are below. This desk is an authorised channel partner for Gaurs, Eldeco and ACE, so some rows are projects we can sell. Read them knowing that.

ProjectUP-RERA registrationPromoter on recordOur page
Eldeco Echoes of EdenUPRERAPRJ125342/02/2026Eldeco Sohna Projects LimitedProject page
Gaur AlarisUPRERAPRJ950965/07/2026, registered 28 July 2026Gaursons India Pvt LtdReview
Gaur Chrysalis (Phase 1)UPRERAPRJ622344/11/2025, registered 4 November 2025Gaursons Promoters Pvt LtdIn the comparison linked below
ACE TerraUPRERAPRJ683816/04/2024, registered 4 April 2024Ajay Realcon India LLPReview
ATS AllureUPRERAPRJ918, registered 31 July 2017ATS Realty Pvt LtdReview
VVIP YamunaUPRERAPRJ677791/02/2026, registered 5 February 2026VVIP Infrahome Pvt LtdReview
Arihant Seasons 22DUPRERAPRJ974543/02/2026, registered 24 February 2026Arihant Urban Space Pvt LtdReview
Purvanchal SunblissUPRERAPRJ746863/04/2025, registered 8 April 2025Purvanchal Projects Pvt LtdReview
Greenbay The MonarqueUPRERAPRJ710489/10/2025Green Bay Infrastructure Pvt LtdReview
CountyNo registration number found, checked 11 July 2026Not confirmedReview
OrionNo registration number found, checked 11 July 2026Not confirmedReview

Registration details from our UP-RERA register directory (as on 2 November 2026) and our Sector 22D comparison. Eldeco Echoes of Eden, Purvanchal Sunbliss and Greenbay The Monarque are reviewed as Sector 22D projects but are not in the 22D directory list, which includes only filings whose own name or address states Sector 22D; check the filed address on up-rera.in. Also on the register in 22D and not yet reviewed: Ace Edit, Ace Estate, Oasis Grandstand Phase-2 and YEIDA’s Affordable Housing Sector-22D. No prices appear on this page.

What is built, and what is still on paper

Only what this site has sourced. Each line says where it comes from.

Built and in use
  • The Yamuna Expressway: 165 km, six lanes, open since 2012 (our airport timeline, July 2026). Confirmed
  • Noida International Airport: commercial flights since 15 June 2026 (our airport timeline, 16 July 2026). Confirmed
  • ATS Allure, registered on 31 July 2017, is the oldest registration in our Sector 22D directory. Portals describe it as largely complete. A February 2023 UP-RERA order recorded handover still incomplete for 19 complainants at that date (our ATS Allure review). Reported
  • Our build-lane page describes the sector’s internal roads, water, power and sewage as developed (June 2026). We have not seen a YEIDA document that confirms it, so check services at your own plot. Not confirmed
Being built, on filed dates
  • Our Sector 22D comparison lists Eldeco Echoes of Eden as registered and under construction. Reported
  • Declared completion dates on the filings we have read run from December 2028 (ACE Terra) into 2031. A declared completion date is the promoter’s filed target, not a handover promise. Check each filing’s extension history on up-rera.in.
Still on paper
  • Film City, Sector 21: planned. YEIDA’s brochures still called it planned in July 2026 (our airport timeline). Read our Film City status sheet. Confirmed
  • Rapid rail: the revised Ghaziabad to Jewar RRTS proposal runs through Sectors 18 and 21, not 22D, and has no approved alignment or construction start (Metro Rail Today, 15 December 2025, as recorded in our airport timeline). Confirmed
  • County and Orion: marketed in Sector 22D with no UP-RERA registration number found when we checked on 11 July 2026. Treat both as marketing until a number appears. Not confirmed

How to read a Sector 22D brochure claim

  1. The registration number. Search it on up-rera.in. Then read the address on the filing. Our directory lists a project under 22D only when its own filing says Sector 22D.
  2. The airport minutes. This site’s own figures for 22D run from 10 to 12 km up to 15 to 16 km. A brochure line of a few minutes, with no route, start point or time of day, is a developer’s claim, not a measurement.
  3. Film City and rail lines. Film City is planned. The only rapid-rail proposal is unapproved and runs via Sectors 18 and 21. A brochure that sells either as a present-day amenity is ahead of its sources.
  4. The completion year. Compare any year in the brochure with the declared completion date on the UP-RERA filing. The filed date is the promoter’s target. Check whether it has already been extended.
  5. Similar names, separate projects. Gaur Chrysalis (Phase 1) and Gaur Alaris, once marketed as Chrysalis 2.0 or Gaur Plume, are separate registrations. So are Eldeco Echoes of Eden, Ballads of Bliss and Whispers of Wonder. One project’s number never covers another.
  6. Who does what. UP-RERA registers projects. YEIDA allots land and sanctions building plans. A brochure that mixes up those roles is telling you something about the brochure.

Other Sector 22D pages on this site, and what each adds

Sector 22D: frequently asked questions

Where is Sector 22D on the Yamuna Expressway?
Sector 22D is a YEIDA residential sector beside the Yamuna Expressway, in the residential belt near the airport end of the corridor. Our map-based connectivity matrix reads it at roughly 20 to 24 km from Pari Chowk, Greater Noida, and roughly 4 to 6 km from the planned Film City in Sector 21 (12 July 2026).
What is Sector 22D?
It is a sector of the Yamuna Expressway Industrial Development Authority (YEIDA) with group housing plots and YEIDA residential plots. Our UP-RERA directory lists 10 registrations whose own filed name or address states Sector 22D, as on 2 November 2026, and the sector was part of YEIDA's 2024 residual-plot scheme, RPS-08/2024.
How far is Sector 22D from Jewar airport?
Our Jewar airport distances page states approximately 10 to 12 km, about 10 to 15 minutes by road (data verified 31 July 2026). Other figures on this site run wider: roughly 12 to 15 km on our map-based matrix (12 July 2026) and 15 to 16 km in Gaursons' own brochure. Plan on the longer figure until you have timed your own route.
Which projects are in Sector 22D?
Registered projects this desk has reviewed include Eldeco Echoes of Eden, Gaur Alaris, Gaur Chrysalis (Phase 1), ACE Terra, ATS Allure, VVIP Yamuna, Arihant Seasons 22D, Purvanchal Sunbliss and Greenbay The Monarque. County and Orion are marketed in Sector 22D, but we found no UP-RERA registration number for either when we checked on 11 July 2026.
Is there a metro or rapid rail to Sector 22D?
No. The Ghaziabad to Jewar RRTS has no approved alignment and no construction start. Its revised proposal would run through YEIDA Sectors 18 and 21, not 22D (Metro Rail Today, 15 December 2025, as recorded in our airport timeline). Access today is by road, on the Yamuna Expressway.
Is there an official Sector 22D map?
The map on this page is a schematic, not to scale, and shows only the order of places along the corridor. For plot or sector boundaries, rely on your YEIDA allotment or lease papers and ask YEIDA for the sector layout plan. Do not rely on a brochure map for boundaries or distances.

Talk to the advisory desk

Looking at a project in Sector 22D?

Name the project or paste its registration number. We read the UP-RERA filing and tell you in writing what it confirms, what it does not, and how it compares with its neighbours.

Call +91 98114 05300

Your number goes to the advisory desk, not a call-centre.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

Disclosure: this is independent research by Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026), an authorised channel partner for Gaurs, Eldeco and ACE, and not the developer of any project named here. We are not YEIDA or UP-RERA. The map is a schematic, not to scale, and shows no boundaries. Distances are the site’s published readings, not surveyed figures. Verify any project’s registration at up-rera.in before you pay anything. This page states no prices and does not forecast them.